In charge of commercial activities related to the projects & contracts. Prospecting and sales activities in order to be awarded by the projects/contracts; Negotiation and contracting; Following up progress and contract terms & conditions including technical and financial / banking issues. Short list of the Projects :
1. Modification of Qyt(2) Heater Treater: 6, 000 BPD, 8.3 MM Btu/hr & Fuel Gas Skid: 5 MMSCFPD for Badr Eldin Petroleum Co. (BAPETCO) / (PETROJET) @Neag Facility, East Dessert, Egypt.
2. Manufacturing of Qyt(1) Desalter Packages: 30, 000 BPD, FV 350 psig @400 F for Occidental Petroleum Corporation (OXY)/(TOWELL) @Wadi Letham field, Oman.
3. Manufacturing of Qyt(1) Gas Scrubber: 20 MMSCFPD, 380 psi @ 180 F for Agiba Petroleum Co. (AGIBA) / (PETROMAINT) @Meliha Field, Western Dessert, Egypt.
4. Manufacturing of Qyt(2) Production Separator: 10, 000 BPD & 5, 000 BPD for General Petroleum Co. (GPC) @Gharib concession, Suez Gulf, Egypt.
Job Experience :
In charge of commercial activities related to the projects & contracts. Prospecting and sales activities in order to be awarded by the projects/contracts; Negotiation and contracting; Following up progress and contract terms & conditions including technical and financial / banking issues. Short list of the Projects :
1. Modification of Qyt(2) Heater Treater: 6, 000 BPD, 8.3 MM Btu/hr & Fuel Gas Skid: 5 MMSCFPD for Badr Eldin Petroleum Co. (BAPETCO) / (PETROJET) @Neag Facility, East Dessert, Egypt.
2. Manufacturing of Qyt(1) Desalter Packages: 30, 000 BPD, FV 350 psig @400 F for Occidental Petroleum Corporation (OXY)/(TOWELL) @Wadi Letham field, Oman.
3. Manufacturing of Qyt(1) Gas Scrubber: 20 MMSCFPD, 380 psi @ 180 F for Agiba Petroleum Co. (AGIBA) / (PETROMAINT) @Meliha Field, Western Dessert, Egypt.
4. Manufacturing of Qyt(2) Production Separator: 10, 000 BPD & 5, 000 BPD for General Petroleum Co. (GPC) @Gharib concession, Suez Gulf, Egypt.
سبتمبر 2009
إلى يناير 2012
Sales Engineer
في Hitec Oil & Gas Solutions
البلد :
مصر - القاهرة
Worked as a representative for a major American & European companies:
- FLOWSERVE for Control Valves
- HILLER GmbH for Centrifugal Solid/ Liquid Separation systems.
- ANTICO OLINDO E CESARE S.r.l. for Pumps and Mixing Equipments.
Sales Sectors / Areas :
- Oil, Gas, Petrochemicals, Fertilizers, Power generation, water treatment sectors.
- Great Cairo, Alexandria, Damietta, Suez, Port Said & Ain El-Sokhna.
Job Experiences :
- Preparing business plan, sales pipe line, sales reports, seminars & exhibitions.
- Preparing technical/commercial proposals and presentations.
- Managing & Coordination with the teams work to achieve sales targets.
- Managing technical evaluation & commercial negotiation until closing of deals.
- FLOWSERVE for Control Valves
- HILLER GmbH for Centrifugal Solid/ Liquid Separation systems.
- ANTICO OLINDO E CESARE S.r.l. for Pumps and Mixing Equipments.
Sales Sectors / Areas :
- Oil, Gas, Petrochemicals, Fertilizers, Power generation, water treatment sectors.
- Great Cairo, Alexandria, Damietta, Suez, Port Said & Ain El-Sokhna.
Job Experiences :
- Preparing business plan, sales pipe line, sales reports, seminars & exhibitions.
- Preparing technical/commercial proposals and presentations.
- Managing & Coordination with the teams work to achieve sales targets.
- Managing technical evaluation & commercial negotiation until closing of deals.
سبتمبر 2007
إلى أكتوبر 2009
Project Engineer
في ENVIROTEC
البلد :
مصر - القاهرة
Worked as a project engineer responsible for managing installation, commissioning and training works. Projects:
- Starch Recovery System @ FARM FRITES Factory, 10th Of Ramadan.
- Dewatering System @ (MFO) Multinational Forces & Observers, North Sinai.
- Oil recovery system @ (NPC) Nasr Petroleum Company, Suez.
- Over Head Cranes @ El-Sewedy Engineering workshops, 10th of Ramadan.
Job Experiences :
- Perform complete case studies including drawings, technical specifications, environmental effects and return of investment.
- Coordinate / Manage installation, startup & commissioning works.
- Prepare troubleshooting, manuals & training program for customers.
- Starch Recovery System @ FARM FRITES Factory, 10th Of Ramadan.
- Dewatering System @ (MFO) Multinational Forces & Observers, North Sinai.
- Oil recovery system @ (NPC) Nasr Petroleum Company, Suez.
- Over Head Cranes @ El-Sewedy Engineering workshops, 10th of Ramadan.
Job Experiences :
- Perform complete case studies including drawings, technical specifications, environmental effects and return of investment.
- Coordinate / Manage installation, startup & commissioning works.
- Prepare troubleshooting, manuals & training program for customers.
يوليو 2006
إلى أغسطس 2006
Trainee
في Quicktel
البلد :
مصر - القاهرة
- 3D Drawing by Inventor
- Working with plastic injection machines
- Working with plastic injection machines
يوليو 2005
إلى أغسطس 2005
Trainee
في KIBAA for fine Industries
البلد :
مصر - القاهرة
- 2D Drawing by AutoCAD
- Operating CNC wire cut machines
- Operating CNC wire cut machines
يوليو 2004
إلى أغسطس 2004
Trainee
في Petrojet
البلد :
مصر - القاهرة
Maintenance of heavy equipments and automotive engines.
انشر على فيسبوك
انشر على تويتر
مشاركة عبر البريد الإلكتروني