Ayman George, Demand NENWA Leader

Ayman George

Demand NENWA Leader

Procter & Gamble

Location
Egypt - Cairo
Education
Bachelor's degree, MS
Experience
31 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :31 years, 11 Months

Demand NENWA Leader at Procter & Gamble
  • Egypt - Cairo
  • My current job since July 2006

Lead full Supply chain (Initiative, Demand, Material & FP Supply, Master data, SAP & GDF)
 Lead long term Forecast ( 18 months)
 Lead Short term Forecast (3 months).
 Lead Demand MDO Scorecard.
 Lead R&Os.
 Lead initiatives plan.
 Lead Demand Measure Definition.
 Lead Brand Forecasting Breakthrough.
 Lead Monthly forecast accuracy & Gap Analysis.
 Lead Ready-to-go menu synchronization with Marketing communicated volatility.
 Lead MOST the per-market current volatility (SKU, Family and Category level).
 Lead Pipeline fill assumptions tool understanding.
 IBA tracking - Target to have +90% positive responses to IBAs.
 Get the customization needs from SMO based on category/market specific needs.
 Lead stat forecast on GDF Long & Short Term.
 Lead Demand PSC Scorecard.
 Lead PIPO on GDF
 Lead R&Os.
 Lead Demand Measure Definition and Data Source.
 Lead weekly touch point call with MFT.
 Lead weekly forecast accuracy & Gap Analysis.
 Lead SKU Level Simplification and Forecasting Breakthrough.
 Lead Weekly Demand Control on GDF.
 Lead the communication to the SC.
 Lead MOST the per-market current volatility (WFA & Ready to Go SKUs.).
 Lead &Develop understanding of 50-50 vs. 80-20 concepts and sharing for what-if scenarios with supply.
 Lead initiative volume closing vs. E1.
 Lead MAPEx improvements to Inventory.
 Lead Back to Basics Project.
 Define flexibility needed per VS (Category / Family / SKU). Assess/improve supply chain ability to accommodate.

Paper & F&HC Supply Chain Leader at Procter & Gamble
  • Egypt - Cairo
  • January 1999 to July 2006

1. Inventory Management
2. Product availability
3. Cost saving projects.
4. Imitative on time 100%
5. Accurate Master Data 100%

Roles & Responsibility:

 Product Availability Ownership: ensure all required systems are in place to deliver the target materials availability within agreed stock window.
 Lead all orders & communication with suppliers through SAP.
 Articles Master Data Accuracy: to ensure that MRP Views of items are representing the agreed parameters.
 Raw & Packing Materials Inventory Ownership: Ensuring required systems are in place to deliver the target inventory glide-path. Owning the RPM inventory stocks design.
 People Management for Supply Planning Unit Members: Must lead the RPM planners to achieve their targets. Also accountable for leading their annual W&DP with SIP Leader and covering their tasks during their vacation/training.
 Ensuring the day-2-day availability of the Products maintaining the targeted stocks and the required reduction plans.
 Collaborate with other departments, such as procurement, engineering, Finance and quality assurance, to identify or qualify new suppliers
 Lead Inventory Reduction Projects with a target of 10% reduction year after year
 Manage the utilization of shipping lines and obtain optimal shipping rates / Incoterms / Insurance policies in order to ensure cost reduction target.
 Warehouse Space optimization through inventory management & optimization Projects with suppliers.
 Monitor supplier performance to assess ability to meet quality and delivery requirements.
 Monitor forecasts and quotas to identify changes or to determine their effect on supply chain activities.
 Working closely with the Clearing agencies, port authority, to ensure best services.
 Development of New Supplier Service Level Agreements and protocol.
 Lead SC Plant Controlled Cost loss elimination of 10% year after year.
 Lead the Monthly Supplier Performance review and Score Carding, to increase the collaboration within the end-2-end SC.
 Inventory Management :
-Counting and sorting of stocks.
-Making reports and analysis and recommending suggestions for improving efficiency.
-Study inventory records of current stock.
-Plan, organize and direct the work of others.
-Prepare inventory reports.
-Integrate inventory policies and procedures with other material management policies.
-Coordinating with the inventory employees and supervising their work.
Capability & Management:

- Developed the Supply Planning DMS (Daily Management Systems) for managing and mapping all
the Supply Planning Work Process for Finish Product, Export & Material Planning.
- Organization development, Reward and recognition for the organization.




Key Achievements during the assignment
- Delivered ~10% Day of Coverage (DOC) Inventory Reduction each year in Anticipation Safety Frozen.
- Introduced the Deliver to Demand Concept to Cairo Procter and Gamble Outer cases Suppliers, --
- Reducing the Lead time for Delivery from 14 Day to 4 Working Days.
Delivered ~3 MM$ Cost saving through Logistics SC Optimization Projects and Supplier Qualifications.
- Lead the Produce to demand Strategy through PM Supply and Production lines

Paper Lab Coordinator & Quality Assurance Leader at Procter & Gamble
  • Egypt - Cairo
  • June 1992 to December 1998

Roles & Responsibility:

 Lead all R&PM inspection.
 Lead all FP inspection.
 Trained all Production team on FP Quality.
 Trained all Quality line on FP Quality.
 Lead all FP release.
 Issue report for all R&PM results and issue to Material Leader.

Education

Bachelor's degree, MS
  • at Industrial Technical Institute - Mechanical
  • May 1989

Specialties & Skills

Supply Chain
Master Data
Paper R&PM inspection
SAP , MRP II ,Master Data
Paper FP inspection
Demand Collage

Languages

English
Intermediate
Arabic
Expert

Training and Certifications

Decision Making (Training)
Training Institute:
Decision Making
Date Attended:
November 2008
Duration:
8 hours
Effective Communications Skills (Training)
Training Institute:
Communications Skills
Date Attended:
April 2007
Duration:
8 hours
Root cause and Y - Y analysis (Training)
Training Institute:
Y - Y analysis
Date Attended:
March 2010
Duration:
4 hours

Hobbies

  • Bing Bong
  • Swimming