Senior
Arabtech Jardaneh
مجموع سنوات الخبرة :9 years, 8 أشهر
• Team leader & coordinator with the various engineering departments for delivering the submissions & preparing for handouts and deadlines through all electrical work stages and assuring the quality of deliverables and IFCs to maintain reference to associated codes of design. (BS or NFPA, ASHRE…etc).
• Responsible for the IT, Telecom, ELV, Electronic Security and Fire Alarm systems design contents as assigned together with its follow-up for Authorities and Client's approval.
• Validate & check design drawings for lighting design and control construction phases of the project.
• Submit SLD and detailed drawing for central batteries& UPS, lightening protection, BMS, Nurse call systems, etc.
• Preparing concept reports affiliating all concerned codes and legislations and reporting design progress.
• Supervise power distribution network design and site work.
USAID Learning Environment proved infrastructure project/Jordan
• Delivering submittals of detailed design drawings and technical support in accordance to “better learning experience” reports and documents.
• Submitting reports about progress and design status to the client/USAID.
• Budget, cost control and setting priorities concerning MEP/Water framework.
• Setting strategies to comply the design, cost and other aspects with USAID policies.
GRANADA, Saraya Aqaba, Royal court Pavilion (Alrayah).
• 3D visualization (3DsMax) and exterior lighting design.
• Lighting and day light harvesting according to green buildings codes & regulations.
Qatar Petroleum Towers (Healthcare)/Qatar, GRANADA/KSA, Saraya Aqaba/Jordan, Royal court Pavilion (Alrayah)/Jordan, Mowasa Hospital/KSA, Karbala Hospital/Iraq
Revise and assure design and concept are liaising with GCC codes and international codes.
Coordinate and consult ELV systems.
Control documents and procedure flaw of projects.
Lead team and designers to delivery.
Handle technical issues and conflicts with other disciplines.
Project Design Engineer
- Designing of power distribution systems including associated loads, fault current and voltage drop calculations, diesel generators, MV-LV network, PV systems.
- Technical affiliation of HVAC, electrical, plumbing and fire protection systems
- Design the following systems:
C.C.T.V, Access Control /Intruder Alarm, Fire Alarm system, Public addressing, Building Automations, Audio Visual Systems/ Queuing System, SMATV, Structure cabling, Distributed Antenna System.
Nurse Call system, Hotel Management System, IPTV (distribution, encoding/decoding, data streaming analysis).
LAN/WLAN structure, Jitter &Noise, Signal to Noise ratio analysis.
- Experience of energy audits and comparative analysis of fuel and energy systems.
- Inspect infrastructure and coordinate MEP framework assuring the designed systems are well prepared for and complying with local codes of design.
*Mowasa Hospital-KSA. *Yafco Hotel-Jordan.
*Alf leile o leile Turkish Bath-Jordan. *Amman Intl. Airport Hotel-Jordan.
*Khalaf Co. Head offices-Jordan. *Mixed Martial Arts centre-Jordan.
*IBIS Hotel-Jordan. *Arab Open University-Jordan.
Design and calculate for:
-Power distribution systems
-Data and telephony systems
-Lighting design with lux calculations and lighting schedules
-Earthing and lightening protection
-Hotel management systems
-BMS, HomeAutomation and controllers
-Audio/video systems