Emmanuel Refugio, Lead Planning Engineer

Emmanuel Refugio

Lead Planning Engineer

Dmci Philippines

Location
Philippines
Education
Bachelor's degree, Mechanical Engineering
Experience
12 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :12 years, 7 Months

Lead Planning Engineer at Dmci Philippines
  • Philippines - Manila
  • My current job since December 2023

Company Name: D.M.Consuji Inc.
Location: Phnom Penh City
Position: Sr. Planning Engineer/Project Control /Bid Planner
Period: Dec 06, 2023 - Present
Project Detail:
1. Construction of Daron Fuel Depot
2. Construction of Basa Air Base Apron Parking-Bid Proposal
3. Construction of San Simon Substation-Bid Proposal
Scope of works:
1. Darong Fuel Depot - Construction of 6 Fuel Steel tanks with capacity of 68 million Liters of Oil Depot
2. Basa Airbase Apron Parking - Construction of 13 Hectare Apron and Auxillary Fire Potection Building and Fire Water Steel Tank, including Airfield Lightings, Stormwater Drainage and Electrical Wireway and Cabling.
3. San Simon Substation - Site Development, and Foundation Works of Substation Works, including Auxillary Buildings.

Job Responsibility:
• Assists project management in the transition of each project from its planning phase to construction.
• Prepare Construction Programme including the detailed S-Curve and Critical Path schedule.
• Prepare and update progress monitoring report and construction S-Curves for the project
• Coordinate with the management team to ensure that contractual obligations are met.
• Oversee the status of the project (Baseline Schedule and Budget)
• Miscellaneous progress reporting to top management.
Prepare Claims, chronological event, and other document for extension of time (EoT) claims

Planning Manager at CMED Construction
  • Cambodia - Phnom Penh
  • December 2021 to May 2023

Position: Planning Manager/ Project PIC/ Bid Planner/Project Control/Claims
Period: December 2021 - May 24, 2023
Project Detail:
1. Design and Build of GDT Tower Building, Mall Building
2. Hatha Bank Tower Building
Scope of works:
1. Design and build of 33F High Rise Building.
2. 22F Medium Building and Mall Project

Job Responsibility:
• Assists project management in the transition of each project from its planning phase to construction.
• Prepare baseline Schedule including the detailed S-Curve and Critical Path schedule for Design and Build Project.
• Oversee the status of the project (Baseline Schedule and Budget)
• Prepare Claims, chronological event, and other document for extension of time (EoT) claims.
• Coordinate with the management team to ensure that contractual obligations are met.
• Miscellaneous progress reporting to top management.
• Prepare Schedule Guidelines for design and build process.
• Establish Standard operating procedures for planning and scheduling.
• Guide and train site engineers in preparing and updating site schedules, site progress and labor productivity.
• Reviews shop drawings and construction methodologies.

Senior Planning Engineer at Sumitomo Mitsui Construction Co., LTD-Cambodia
  • Cambodia - Phnom Penh
  • October 2019 to June 2021

Company Name: Sumitomo Mitsui Construction Co., LTD-Cambodia (Japanese Co.)
Location: Kampong Chnnang Province Cambodia
Position: Lead Planning Engineer/Project Control/Claims
Period: October 2019 - June 2021
Project Detail:
Construction of 84 km road works from 2-lane to 4-lane travel way with AC surfacing and AC shoulder each side of National Road 5 Improvement Project. 200 million USD
Scope of works:
Composed of RCBC, Bridges, Drainage and Slope Protection Works (RC pipe culverts/Concrete U-drain & ditches, Grouted Riprap/Stone Masonry/Sodding, Gabion and Mattresses). Ancillary and Miscellaneous Works (Concrete Curb and Gutter, Steel Guardrail, Delineator, Kilometer Marker, Road Sign/Road Marking and Sapling).

Job Responsibility:
• Preparation of detailed resource loaded project schedule based on scope of work and target date considering delivery period using Primavera for multi discipline projects.
• Coordinating site management team, Design and procurement team for preparation and updating of the schedule and progress
• Preparation of resource requirements (manpower, equipment, materials), progress plan & construction S-Curves for the project.
• Issuing periodic look ahead schedules to project manager, Construction manager and construction superintendents for their implementation.
• Monitoring of manpower, equipment, and progress efficiency.
• Participate in project meetings and discussions with clients.
• Preparation of chronological events and other documents for extension of time (EoT) claims.

Construction Project Manager at Ezco Construction
  • Philippines - Rizal
  • April 2019 to October 2019

Company Name: Ezco Construction (Philippine Company)
Location: Taytay Rizal
Position: Project In-charge
Period: April 2019 - October 2019
Project Detail:
Construction of Warehouse Mezzanine Installation including Plumbing and Fire sprinkler installation.
Scope of works:
Structural steel erection, water supply and sanitary installation and tapping off. Fire sprinkler piping and equipment and accessories installation.

Job Responsibility:
• Oversee overall construction and installation works.
• Coordinate with client project in-charge for inspection and interface handover schedule.
• Miscellaneous progress reporting to management.
• Reviews shop drawings and construction methodologies.

Planning Engineer at Azmeel Contracting
  • Saudi Arabia - Dhahran Al Janoub
  • January 2016 to March 2019

Period: January 2016 - March 2019
Project Detail: Saudi Aramco Project
South Dhahran Home Ownership Project 2D & 2E.
Scope of Work:
Construction of 779 Villas and includes Roads, Infrastructure,
Pumping Station & Underground Activities.
Project Detail: SABIC, Saudi Basic Industries Corporation
Construction of IBN SINA SAMAC-MMA Project (SABIC Project)
Scope of Work:
Construction of Civil works, Building, Pipe Rack and Underground Pipings and Steel Tank.
• Assists project management in the transition of each project from its planning phase to construction (South Dharan Home Ownership Project)
• Prepare and update of Construction Programmed using Primavera.
• Prepare and update progress monitoring report and construction S-Curves for the project.
• Issuing of 3 weeks look ahead schedules to Construction manager and construction superintendents for their implementation.
• Perform time impact analysis.
• Monitoring of manpower, equipment, and progress efficiency.
• Coordinating site management team on the status of the projects.
• Weekly & Monthly reports preparation detailing actual schedule progress versus baseline schedule and other reports required by client. Identify areas of concern regarding delays or constraints on the implementation of the schedule

Planning Engineer at PCMC Limited Saudi Bin Laden Group
  • Saudi Arabia - Jubail
  • July 2013 to July 2015

Company Name: PCMC Limited Saudi Bin Laden Group (Saudi Company)
Location: Jubail, Kingdom of Saudi Arabia
Position: Planning Engineer
Duration: July 2013-July 2015
Project Detail: SAUDI ARAMCO & DOW Chemical Company Joint Venture,
Construction of Mixed Feed Cracker,
Scope of Work:
Construction of Civil works, Building, Pipe Rack and Underground Pipings and Steel Tank.
• Preparation of detailed resource loaded project schedule based on scope of work and target date considering delivery period using Primavera for multi discipline projects.
• Prepare and update progress monitoring report and construction S-Curves for the project.
• Monitoring of manpower, equipment, and progress efficiency.
• Coordinating site management team on the status of the projects.
• Weekly & Monthly reports preparation detailing actual schedule progress versus baseline schedule and other reports required by client.

Cost and Planning Engineer at EEI Corporation
  • Philippines - Manila
  • June 2010 to June 2013

Company Name: EEI Corporation (Filipino Company)
Location: Taguig, Makati Philippines
Position: Senior Cost & Planning Engineer
Duration: June 2010 - June 2013
Project Detail: Construction of 34 floor RCBC Savings Bank Commercial Building.

• Prepare detailed resource loaded schedule based on scope of work and target date considering delivery period using Primavera for multi discipline projects.
• Prepare and update progress monitoring report and construction S-Curves for the project.
• Preparation and update of project budget and coordinate to accounting for verification of Actual Cost.
• Coordinating site management team on the status of the projects.
• Prepare Weekly and Monthly Progress Report

Education

Bachelor's degree, Mechanical Engineering
  • at Adamson University
  • March 2009

Graduated of Bachelor of Science in Mechanical Engineering

Specialties & Skills

Claims Management
CPM Scheduling
Productivity Improvement
Bid Preparation
Project Control
Coordination
Scheduling Management
Bid Proposal
Productivity Training
Project Control

Languages

English
Expert

Training and Certifications

Planning and Scheduling Training Course (Training)
Training Institute:
KM Consulting Office
Date Attended:
May 2016
Duration:
30 hours
IMS Lead Auditor Training Course (Training)
Training Institute:
Edullence Education Excellence
Date Attended:
June 2022
Duration:
80 hours
Integrated Management Systems (Training)
Training Institute:
K2A Training Academy
Date Attended:
July 2022
Duration:
80 hours
Integrated Management Training System Foundation (Training)
Training Institute:
K2A Training Academy
Date Attended:
May 2022
Duration:
80 hours

Hobbies

  • Chess
    Chess Player at Adamson University