حاتم طاحون, Senior Project Engineer

حاتم طاحون

Senior Project Engineer

Consolidated Contractors Groups

البلد
قطر - الدوحة
التعليم
بكالوريوس, Architectural Engineering
الخبرات
36 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :36 years, 8 أشهر

Senior Project Engineer في Consolidated Contractors Groups
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ يونيو 2011

Package Manager : April 2015 - Present
Follow up stone work/millwork/wooden work packages for Sidra Medical and research center Project, the project consists of Hospital building (580 beds / 6150 rooms), Clinic building (1700 rooms), Central services building (199 rooms), Multistory car park (820 spaces), underground parking (950 spaces) and other facilities (Mosque, water tank, external works, etc.), Sidra project is being built of approx. 31.5 Hectares and Gross floor building areas 402, 365 m2, with cost 2.2 billion dollar.
Project design was made by Pelli Clarke Pelli, Client is Qatar foundation (QF) with ASTAD as a representative and consulting by KEO.


Head of Architectural Department : June 2011 - April 2015
Head of the architectural department for the Multipurpose Administration Complex project. Our team is responsible for validating the proposed design for construction, supporting it as necessary with shop drawings, material submittals, and specifications, obtaining consent of client’s consultant and coordinating works with subcontractors and other departments. This EPIC project at Ras Laffan area consists of an Office & Canteen building, a Medical Center, a Central Plant and a Helipad surrounded by 130, 000 m2 landscape, for a budget of 1.2 billion Qatar Riyals. Project design was made by Leigh & Orange architects (L&O), Client is Qatar petroleum (QP) and Ras Laffan City (RLC) is the end user.

Technical Manager في Tadmur Contracting
  • قطر - الدوحة
  • أبريل 2008 إلى يونيو 2011

Technical office manager for the Student Centre project at the education city of Qatar Foundation. Our office was responsible for all technical aspects such as shop drawings, material submittals, subcontractors and coordination work, amongst others. The project consisted of 9 zones for a total area of 44.000 m2, with a cost of 500 million Qatar Riyals. Legorreta+Legorreta was the designer with Langdon Wilson office acting as executive, KEO being the consultant and Qatar petroleum the representative of Qatar Foundation.

External Finishing Manager في Saudi bin ladin group (ABCD Division)
  • المملكة العربية السعودية - جدة
  • أغسطس 2004 إلى أبريل 2008

Manager of coordination skin section which follow up and control all works of external elevations for dokaae project in holly makkah ( development of king abdul aziz endowment ).
This is huge project at holly kaabah directly.
Consists of 7 towers ( 6 apartment towers by 201 to 231 m height and hotel tower by 474 m height )
Total area is 1.5 million m2 biult up with cost more than 6 billion saudi riyals.

Technical Manager في Al Saadah contracting
  • المملكة العربية السعودية - الرياض
  • يونيو 2000 إلى أغسطس 2004

Preparation the shop drawing, coordination works and follow up the site for project of royal saudi air defence forces headquarter complex in riyadh.

Senior Architect في Saudi Bin Ladin Group
  • المملكة العربية السعودية - جدة
  • أبريل 1991 إلى يونيو 2000

Senior Architect : July 1997 - June 2000 (PBAD Division - Riyadh)
Followed up all stone works (shop drawings / materials / coordination /
supervision) for Al-Fisaliah center project (Land mark of Riyadh city).
This project was designed by Sir Norman Foster & Partners & Burro Happold
Joint Venture, consisting of 6 packages (Tower, Tower Lobby, Banquet Hall,
Retail and Hotel) with a budget of 1.2 billion Saudi Riyals.

Architect : April 1991 - July 1997 (A&C Division - Jeddah)
Shop drawing and marble/granite cutting list preparation for several important large scale projects such as the Extension of Holly Haram in Makkah & Al-Madinah, the Rebuilt of Holly Kaabah, the Conference Center of Gulf Countries, royal palaces and private villas, amongst others.

Architect في Engineering Group for Complete System
  • سبتمبر 1987 إلى أبريل 1991

Site Engineer : Feb.1990 - April 1991 (Jeddah - Saudi Arabia)

Supervision of all finishing works, both internal and external, for the Sharbtly Center project, a commercial and residential center in Jeddah city.

Architect : Sep. 1987 - Feb. 1990 (Cairo - Egypt)
Designer and supervisor for interior/exterior architectural work, specializing in Islamic style decoration and furniture for several palaces, villas and office projects.

الخلفية التعليمية

بكالوريوس, Architectural Engineering
  • في Faculty of fine art - architecture section
  • يونيو 1987

Specialties & Skills

Residential
Preparation
Education
Materials
Petroleum
Architectural work: Design, Shop Drawing, Finishing work, Coordination, Site Follow Up
Stone works: Design, Shop Drawing, Cutting List, Installation, site follow up
Cad design, Microsoft Office and internet.
 . Excellent technical knowledge. Have excellent planning, decision making
 Analytical problem solving and ability to choose the right people.
 Excellent conflict resolution and negotiation and man management skills.
 Leadership and executive stature to influence and motivate others toward specific goals.
 Communication & negotiating skills as well as an ability to work in a multicultural team environ.
Personal Skills  Capable of working under pressure and high capacity to tolerate challenge.
 Strategic thinking and business drive.

اللغات

الانجليزية
متمرّس
العربية
متمرّس

العضويات

engineering association in egypt
  • Member
  • June 1987