هتان فلمبان, Senior Civil Engineer / PM

هتان فلمبان

Senior Civil Engineer / PM

Confidential

البلد
المملكة العربية السعودية - جدة
التعليم
بكالوريوس, Civil Engineering
الخبرات
20 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :20 years, 7 أشهر

Senior Civil Engineer / PM في Confidential
  • المملكة العربية السعودية - المنطقة الشمالية
  • أشغل هذه الوظيفة منذ ديسمبر 2021
Senior Civil Engineer في Zuhair Fayez Partnership Consultant
  • المملكة العربية السعودية - جدة
  • مايو 2020 إلى ديسمبر 2021

- Supervision Maintenance of (Roads -Land S. -Stormwater Drainage System -Street Lighting -Waterfront)
- My role is to coordinate and support Contracts Department with all stakeholders (Contractors and Team) negotiate for the project maintenance, services, and utilities.
- Facilitate and solve/ resolve problems/ obstacles.
- Supervise and monitor Project Progress to be in alignment with City incidents.

Interface Manager/ PM في Aecom Arabia
  • المملكة العربية السعودية - جدة
  • مارس 2019 إلى مايو 2020

- Interface Manager and Integration Manager, for Jeddah Storm Water Drainage System. Design for Jeddah Storm Water System and underground water solutions.
- My role is to coordinate with all stakeholders and negotiate for the project design, services, and utilities (MOM - MOU-Agreements).
- Prepare presentations about progress and project schedule.
- Facilitate and solve/ resolve problems/ obstacles.
- Supervise and monitor Project Design to be in alignment with City utilities.
- Prepare meeting minutes.
- Managing the project and coordinate with the client, designer, and contractor (different parties).

Projects Manager في Bougary Holding
  • المملكة العربية السعودية - مكة المكرمة
  • أبريل 2013 إلى مارس 2019

- Projects Manager I worked as Client Projects Manager for Civil works (Integration, Planning Business case with the sponsor, Supervision projects, Monitoring, Control and Tracking the projects from Bidding to Design up-to close out the projects ) we start execute (High Rise Buildings (I worked with the sponsor to provide the optimum Exterior and interior design for the hotel of 5 Stars (Largest Crown Plaza in the world at Makkah), and I worked in Planning and Executing for Land Schemes development and after finished the project.
- I was used to Marketing these Lands and sold out the all Pieces of land), utilizing and facilitates of all Governmental works issues to deal with all Stakeholders) (Buildings -Roads- Schemes) Developments Co.

Manager في AECOM ARABIA
  • المملكة العربية السعودية - جدة
  • مايو 2012 إلى أبريل 2013

Jeddah Stormwater Drainage Program (Consultant)

•Interface Manager and Integration Manager, for Jeddah Storm Water Drainage Program (JSDP). Design and Supervision for Jeddah Storm Water System after the crisis that happened between 2009 and 2010.
•Coordinate with all stakeholders and negotiate for the project design, services and utilities. - Prepare presentations about progress and project schedule. -
•Facilitate and solve/ resolve problems/ obstacles
•Supervise and monitor Project Design to be in alignment with City utilities,
•Prepare meeting minutes.
•Managing the project and coordinate with the client, designer and contractor (different parties).

Projects Manager في Bougary Groups
  • المملكة العربية السعودية - مكة المكرمة
  • ديسمبر 2011 إلى مايو 2012

- I worked as Client Projects Manager for Civil works (Integration, Planning Business case with the sponsor, Supervision projects, Monitoring, Control and Tracking the projects from Bidding to Design up-to close out the projects) we start execute (High Rise Buildings (I worked with the sponsor to provide the optimum Exterior and interior design for the hotel of 5 Stars (Largest Crown Plaza in the world at Makkah), and I worked in Planning and Executing for Land Schemes development and after finished the project.
- I was used to Marketing these Lands and sold out the all Pieces of land), utilizing and facilitates of all Governmental works issues to deal with all Stakeholders) (Buildings -Roads- Schemes) Developments Co.

Executive Director في Arafa EST
  • المملكة العربية السعودية - مكة المكرمة
  • ديسمبر 2010 إلى سبتمبر 2011

- I worked as Executive Projects Manager at construction Department for roads projects as a contractor of Rural Area for Makkah Municipality (Starting from Designing to Site preparation to earth works up to Pavement Asphalt works) and portions of some roads construction (provide & fix the sign boards, Guard Rail fixing at the sides of roads and construction of the asphalt (remove (milling) then pavement, Earth works, Asphalt works, Fixing the cat eyes, road stripping, fix fence and new construction of some portions, preparing Payment Certificates, Quality Control) .

Senior Civil Engineer في Holy Makkah Municipality
  • المملكة العربية السعودية - مكة المكرمة
  • فبراير 2010 إلى يوليو 2010

I worked as Supervisor (Client) at Study & Supervision Department for construction of roads project at Project of Rural Area for Makkah Municipality (Starting from Site preparation to earth works up to Pavement Asphalt works) and portions of some roads construction (provide & fix the sign boards, Guard Rail fixing at the sides of roads and construction of the asphalt (remove (milling) then pavement, Earth works, Asphalt works, Fixing the cat eyes, road stripping, fix fence and new construction of some portions, preparing Payment Certificates, Quality Control).

Project Manager في Rawafid Al Torok Co
  • المملكة العربية السعودية - الدلم
  • مايو 2008 إلى فبراير 2010

Manager for Roads Projects (Maintenance and Construction Projects) which belong to Ministry of Transportation and Municipality.
•Project Manager at Dilam /Aflaj Roads at remote area for ( maintenance Project ) we used to maintain asphalt and soil maintenance of side shoulders using Graders, provide & fix the sign boards,
•Guard Rail fixing at the sides of roads and maintain the asphalt (fill cracks by slurry seal, Asphalt treatment remove (milling) then pavement, use hot sand mix, Fixing the cat eyes, road stripping, fix fence and new construction of some portions).

Senior Construction Engineer في SAUDI ARAMCO
  • المملكة العربية السعودية - الشرقية
  • يناير 2007 إلى أبريل 2008

- Senior Construction Engineer for Roads Projects (Maintenance and Construction Projects) which belong to Saudi Aramco Co.
- I worked as Senior Project engineer at Eastern Provence (Ras Tanura / Abqaiq) Roads at remote area for (maintenance Project) we used to maintain asphalt and soil maintenance of side shoulders using Graders, provide & fix the sign boards, Guard Rail fixing at the sides of roads and maintain the asphalt (fill cracks by slurry seal, Asphalt treatment remove (milling) then pavement, use hot sand mix, Fixing the cat eyes, road stripping, sidewalks and fix fence)

Site Engineer في IJZALA TRADING & CONT. Co
  • المملكة العربية السعودية - الطائف
  • فبراير 2004 إلى يناير 2007

- Site Engineer and then Project Manager for Roads Projects (Maintenance and Construction Projects) which belong to Ministry of Transportation and Municipality.
- I worked as Site engineer at Muzahmiyah Roads at remote area for (maintenance Project) we used to maintain asphalt and soil maintenance of side shoulders using Graders, provide & fix the sign boards, Guard Rail fixing at the sides of roads and maintain the asphalt (fill cracks by slurry seal, Asphalt treatment remove (milling) then pavement, use hot sand mix, Fixing the cat eyes, road stripping and fix fence)
- Then I worked as Site P. Manager Engineer at construction of roads project at Doubling of AlTaif /Al Baha Road (Starting from Site preparation to earth works up to Pavement Asphalt works)

Site Engineer في AL-MAS’AD CO. FOR ROADS LTD
  • المملكة العربية السعودية - الرياض
  • أبريل 2003 إلى يناير 2004

Engineer and then Project Manager for Roads Projects (Maintenance and Construction Projects) which belong to Ministry of Transportation and Municipality.
•Site engineer at Nayiriyah Roads at remote area for (maintenance Project ) we used to maintain asphalt and soil maintenance of side shoulders using Graders, provide & fix the sign boards.
•Other duties included rail fixing at the sides of roads and maintain the asphalt ( fill cracks by slurry seal, Asphalt treatment remove (milling) then pavement, use hot sand mix, Fixing the cat eyes, road stripping and fix fence.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Umm Al-qura University
  • فبراير 2003

Grade Good

Specialties & Skills

Infrastructure
civil engineer
Engineering
General Construction
Team Management
CONSULTING
CUSTOMER RELATIONS
MANAGEMENT
MICROSOFT WORKS
PRESENTATION SKILLS
PROGRESS
PROJECT DESIGN
UTILITIES
BUSINESS CASE
ENGINEERING

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس

الهوايات

  • Playing Musical Instruments
  • Soccer