Janus Villanueva, OSP Engineer

Janus Villanueva

OSP Engineer

Mastoura for Trading and Contracting Company

Location
Saudi Arabia - Khobar
Education
Bachelor's degree, Electronics and Communication Engineering
Experience
15 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :15 years, 5 Months

OSP Engineer at Mastoura for Trading and Contracting Company
  • Saudi Arabia - Khobar
  • My current job since July 2011

As an OSP engineer, means I will be the 'eyes and ears of the network'. In this management role, I'll be actively engaged in the planning, design and implementation of various network systems utilizing OSP Engineering. OSP engineer jobs are multifaceted-I'll oversee the deployment and enhancement of telecommunications-related hardware and services to keep a lifeline between customers and the people important to them. If there's a dropped call or severe weather condition, I help create a technology solution. I'll develop designs and as-built drawings, specifications, estimates, and reports to ensure that new installations are on-time and within budget.

OSP Engineer at Globe Telecom (Expercs Inc.)
  • Philippines
  • July 2010 to June 2011

• Conduct site inspection to check if the work rendered followed the company standards.
• Supervises testing and acceptance activities with contractors to check if standard installation were met.
• Supervise and/or conduct trouble shooting activities and ensure proper protocols are executed.
• Conduct Fiber Optic Cable Testing (Power Meter and OTDR).
• Conduct Fiber Optic Cable trouble shooting.
• Initiate work schedule on priority area.
• Monitor daily and weekly accomplishment.
• Perform other duties that maybe assigned from time to time.

Operations Manager at Arktek System Builder Inc.
  • Philippines
  • April 2010 to June 2010

• Allocate work and responsibilities to Project Engineers/Supervisors and deploy supervisor according to the needs of the area.
• Overall supervision of all construction activities including monitoring of site acquisition and permitting works.
• Initiate work schedule on priority area.
• Monitor daily and weekly accomplishment. Prepare and administer the budget for operation department.
• Assumes over-all coordination with regards to construction progress of on-going projects.
• Prepare periodic cost evaluation and estimates related both the over-all budget and preliminary allocations of the budget.
• Prepare work schedule. Provide a detailed schedule for the implementation of the project.
• Review drawings and standard specifications, and engineering for the purpose of advising site condition, appropriate material alternates, possible cost implications for both material and labor cost.
• Attend meeting to client to discussed progress, problem and schedules.
• Liaise with client acceptance group on all testing and acceptance of OSP works.
• Provide solution to problems that may cause delay and formulate strategies to facilitate early completion of project.
• QA/QC site ready for Provisional Acceptance Test (PAT)/Final Acceptance Test (FAT)

Project Oversight Head at RS Developer Co. Inc., Marikina City
  • Philippines
  • December 2008 to March 2010

• Allocate work and responsibilities to Project Engineers/Supervisors.
• Overall supervision of all construction activities including monitoring of site acquisition and permitting works.
• Prepare and administer the budget for operation department.
• Assumes over-all coordination with regards to construction progress of on-going projects.
• Prepare periodic cost evaluation and estimates related both the over-all budget and preliminary allocations of the budget.
• Prepare work schedule. Provide a detailed schedule for the implementation of the project.
• Review drawings and standard specifications, and engineering for the purpose of advising site condition, appropriate material alternates, possible cost implications for both material and labor cost.
• Attend meeting to client to discussed progress, problem and schedules.
• Liaise with client acceptance group on all testing and acceptance of OSP works.
• Provide solution to problems that may cause delay and formulate strategies to facilitate early completion of project.
• Quantity survey of all variation/additional works by developing and implement a system for the negotiation with the client.
• Prepare reports/documents required by client and company for projects(e.g. Weekly Accomplishment Report, OSI Monitoring, BOQ)
• Perform other duties that maybe assigned from time to time.

• Projects Handled:
1. Cebu-Toledo FOC (Globe Telecom)
2. Baguio FITL (Smart Communications)
3. Cavite FITL (Smart Communications)
4. FOC Extension Project-Globe Europa South Luzon (Globe Telecom)
5. FOC Extension Project-Globe Europa NCR (Globe Telecom)

Education

Bachelor's degree, Electronics and Communication Engineering
  • at Cebu Institute of Technology
  • October 2008

BS Electronics and Communication Engineering Cebu Institute of Technology 2002-2008

Specialties & Skills

Adobe Photoshop
Photography
AutoCAD
ADOBE PHOTOSHOP
AUTOCAD
DOCUMENTATION
DRAWING
ENGINEER
FIBER OPTIC
INDUSTRIAL MACHINERY
INSPECTION

Languages

English
Intermediate

Memberships

IECEP
  • Member
  • November 2014
Philippines Society of Safety Practitioners Middle East Region (PSSP-MER)
  • Member
  • November 2014
Trainors Technology International
  • Member/Asst. Sports Chairman
  • June 2012

Training and Certifications

Digital Photography (Training)
Training Institute:
Trainors Techology International
Date Attended:
August 2012
Duration:
40 hours
Fiber Optic Splicing (Training)
Training Institute:
Trainors Technology International
Date Attended:
April 2013
Duration:
40 hours
Adobe Photoshop (Training)
Training Institute:
Trainors Technoplogy International Inc.
Date Attended:
August 2012
Duration:
40 hours