Total Years of Experience: 16 Years, 6 Months
February 2011
To October 2021
Site Project Manager
I found this job using Bayt.com
at Larsen & Toubro - United Arab Emirates
Location :
United Arab Emirates - Abu Dhabi
Overall Work Experience -16 Years
Experience Project management member in S/S UP TO 400kV AND CABLE UP TO 220kV EPC Works.
• Preparation of overall project schedule coordinating with Planning engineer
• Coordinating with O/E & Design team for design stage comments and approval to expedite the process.
• Coordinating all Site meetings with O/E, OEM engineers based on Site development
• Conducting Site progress meeting with Civil, MEP etc.
• Managing the site activities of Substation Projects at various stages of the execution with Civil and MEP team.
• Coordinating for Material quantification / procurement, design approvals / timely submission of design documents, vendor coordination etc. to accelerate overall project activities.
• Plan/arrange all the necessary resources such as subcontractors / manpower, materials
• Studying all construction drawings / documents and its updates in terms of construction methodologies in coordination with other disciplines /contractors / subcontractors prior to construction and to give proper extensive explanation to the team of work.
• Managing simultaneous work group with all aspects of tasks development; follow-up task progress and time schedule for the projects
• Vendor engineer co-ordination for Major equipment storage and installation
• Necessary coordination with O/E.
• Studying the construction schedule and project budget and review them continuously to assure working within the limit.
• Responsible for RCDR and all Claims as per work done.
• Coordination and monitoring overall site testing team.
• Manage and monitor project closeout procedures including O&M manuals, as built, punch lists, and warranty walk through.
Experience Project management member in S/S UP TO 400kV AND CABLE UP TO 220kV EPC Works.
• Preparation of overall project schedule coordinating with Planning engineer
• Coordinating with O/E & Design team for design stage comments and approval to expedite the process.
• Coordinating all Site meetings with O/E, OEM engineers based on Site development
• Conducting Site progress meeting with Civil, MEP etc.
• Managing the site activities of Substation Projects at various stages of the execution with Civil and MEP team.
• Coordinating for Material quantification / procurement, design approvals / timely submission of design documents, vendor coordination etc. to accelerate overall project activities.
• Plan/arrange all the necessary resources such as subcontractors / manpower, materials
• Studying all construction drawings / documents and its updates in terms of construction methodologies in coordination with other disciplines /contractors / subcontractors prior to construction and to give proper extensive explanation to the team of work.
• Managing simultaneous work group with all aspects of tasks development; follow-up task progress and time schedule for the projects
• Vendor engineer co-ordination for Major equipment storage and installation
• Necessary coordination with O/E.
• Studying the construction schedule and project budget and review them continuously to assure working within the limit.
• Responsible for RCDR and all Claims as per work done.
• Coordination and monitoring overall site testing team.
• Manage and monitor project closeout procedures including O&M manuals, as built, punch lists, and warranty walk through.
November 2007
To June 2010
Electrical Engineer
I found this job using Bayt.com
at kempe
Location :
Oman - Sohar
• Design construction and testing commissioning of Hot Butt and Bath processing Plants in Sohar Aluminium and EMAL.
• Project Consultants: Overseas Bechtel, SNC-L, WPPreparation of project Schedule, Method Statements, ITP, Materials Submittals, Tools BOQ and follow-up
• Work allocation to Sub-ordinates, Co-ordination with Civil and Mechanical Engineers
• Monitoring daily site Activities with Site Supervisors and implementing the works to meet project Specification
• Installation of MV/LV Switchgear and LV Motor Control Centres, Lighting distribution Boards and transformers (11KV/440V). Earthing system, UPS system, DC Battery bank Cable trays and cables
• Installations of Various Instrument and SCADA system
• Responsible for the site construction process during the entire construction project, which included contract drawings, RFIs, Change Orders, Inspections and Test reports
• Responsible for project handover documents and closeout of punch list.
• Worked as warranty engineer with responsible of closing all open documents and site related activity and successful operation of plant.
• Project Consultants: Overseas Bechtel, SNC-L, WPPreparation of project Schedule, Method Statements, ITP, Materials Submittals, Tools BOQ and follow-up
• Work allocation to Sub-ordinates, Co-ordination with Civil and Mechanical Engineers
• Monitoring daily site Activities with Site Supervisors and implementing the works to meet project Specification
• Installation of MV/LV Switchgear and LV Motor Control Centres, Lighting distribution Boards and transformers (11KV/440V). Earthing system, UPS system, DC Battery bank Cable trays and cables
• Installations of Various Instrument and SCADA system
• Responsible for the site construction process during the entire construction project, which included contract drawings, RFIs, Change Orders, Inspections and Test reports
• Responsible for project handover documents and closeout of punch list.
• Worked as warranty engineer with responsible of closing all open documents and site related activity and successful operation of plant.
September 2006
To June 2007
Electrical Site Engineer
at Arabian Bemco Contracting Company - Qatar
Location :
Qatar - Doha
• Site Engineer for 66/11KV indoor GIS substation named as a Midfield south Substation.
• Consultants are Overseas Bechtel
• Reviewing of Construction drawing and comments forwarding to Design department.
• Shop drawing preparation for Cable Ladder and Cable Roots.
• Preparation of cable Schedule and Selection of Control Cables.
• Preparing of Method statements, ITP, Materials, tools BOQ.
• Following the Material delivery status.
• Preparation of daily site activity reports and submits to client representative.
• Co-ordination with civil and Mechanical engineers for cable ducts, building earthing and HVAC duct, drainage piping works.
• Installations of 66KVGIS (Areva F35) and 11KVAIS (ABB), 20MVA Power Transformer (ABB), LVAC, DCDB, Battery Bank, SCMS & Control Relay Panels (ABB), MV Cables and Terminations, Lighting and Earthing
• Co-ordination with Client and Safety officers’ for weekly safety walks.
• Co-ordination with testing Engineers for site testing.
• Earth Resistance and Contact Resistance Test for Earth system
• Coordination with testing engineer for Transformer Testing
• Consultants are Overseas Bechtel
• Reviewing of Construction drawing and comments forwarding to Design department.
• Shop drawing preparation for Cable Ladder and Cable Roots.
• Preparation of cable Schedule and Selection of Control Cables.
• Preparing of Method statements, ITP, Materials, tools BOQ.
• Following the Material delivery status.
• Preparation of daily site activity reports and submits to client representative.
• Co-ordination with civil and Mechanical engineers for cable ducts, building earthing and HVAC duct, drainage piping works.
• Installations of 66KVGIS (Areva F35) and 11KVAIS (ABB), 20MVA Power Transformer (ABB), LVAC, DCDB, Battery Bank, SCMS & Control Relay Panels (ABB), MV Cables and Terminations, Lighting and Earthing
• Co-ordination with Client and Safety officers’ for weekly safety walks.
• Co-ordination with testing Engineers for site testing.
• Earth Resistance and Contact Resistance Test for Earth system
• Coordination with testing engineer for Transformer Testing
June 2004
To August 2006
Project Coordinator Engineer
at four ef construction
Location :
India - Bengaluru
• 220/66/33KV Substations Installation, Testing and Commissioning.
• Clients: NEG MICON, Vestas RRB and KPTCL
• Evacuation work for Transmission lines, HT substations, metering units, Transformer Yards,
• Initial survey of allocated wind power project area.
• Obtaining required clearance from Government for Each stage of projects and commissioning the projects.
• Preparing Quotation for Various Projects in wind form and Government projects.
• Finalizing the required subcontractors and work orders for the Project with the allowed cost.
• Purchase order placement and arrangement of material at correct time to site.
• Following the Site progress & reports. Arranging of testing team for Commissioning works.
• Conducting FAT for CT, PT, Isolators and Circuit Breaker.
• Chasing of major equipment to site and visiting to manufacturing unit if any delay in Delivery.
• Design of Single/double Circuit Transmission lines.
• Structural design for Metering and VCB (Breaker) Yards.
• Selection of Cables, CT, PT, VCB, Conductors, insulators and Isolators.
• Execution of 220/66/33KV, 100 MVA out-door substation.
• Billing with respect to combined inventory.
• Testing of Busbar, Circuit Breaker and CT/PT & Power Transformers.
• Co-ordination with Government engineer (MRT) testing and commissioning of metering units.
• Involved in Commissioning process in Substation with Commissioning Team.
• Clients: NEG MICON, Vestas RRB and KPTCL
• Evacuation work for Transmission lines, HT substations, metering units, Transformer Yards,
• Initial survey of allocated wind power project area.
• Obtaining required clearance from Government for Each stage of projects and commissioning the projects.
• Preparing Quotation for Various Projects in wind form and Government projects.
• Finalizing the required subcontractors and work orders for the Project with the allowed cost.
• Purchase order placement and arrangement of material at correct time to site.
• Following the Site progress & reports. Arranging of testing team for Commissioning works.
• Conducting FAT for CT, PT, Isolators and Circuit Breaker.
• Chasing of major equipment to site and visiting to manufacturing unit if any delay in Delivery.
• Design of Single/double Circuit Transmission lines.
• Structural design for Metering and VCB (Breaker) Yards.
• Selection of Cables, CT, PT, VCB, Conductors, insulators and Isolators.
• Execution of 220/66/33KV, 100 MVA out-door substation.
• Billing with respect to combined inventory.
• Testing of Busbar, Circuit Breaker and CT/PT & Power Transformers.
• Co-ordination with Government engineer (MRT) testing and commissioning of metering units.
• Involved in Commissioning process in Substation with Commissioning Team.