Total Years of Experience: 21 Years, 3 Months
January 2012
To Present
Technician
Experience in manufacturing shop
Delivery valve manufacturing
Valve holder seat grinding, Valve cone Grinding, Valve cone and Valve holder assembly, Final inspection
Responsibilities
The inputs were given in form of Templates, Master Tooling gauge & drawings.
•Operation carried out as per the work instruction and safety norms.
•Check the component as per drawing with the accuracy of 1µm.
•Measured values recorded in the Statistical Process Control (SPC) chart. Corrective action taken for out of control limit
Delivery valve manufacturing
Valve holder seat grinding, Valve cone Grinding, Valve cone and Valve holder assembly, Final inspection
Responsibilities
The inputs were given in form of Templates, Master Tooling gauge & drawings.
•Operation carried out as per the work instruction and safety norms.
•Check the component as per drawing with the accuracy of 1µm.
•Measured values recorded in the Statistical Process Control (SPC) chart. Corrective action taken for out of control limit
January 2000
To January 2006
Delivery valve product & process audit
January 1997
To January 2000
Associate
at BOSCH Ltd
Location :
India
large manufacturing plants. Strengths in quickly learning new processes, technologies and machinery in automotive assembly line work and Quality.
Career Progression in Bosch
Departments
Period
Spark Plug manufacturing and Inspection
Career Progression in Bosch
Departments
Period
Spark Plug manufacturing and Inspection
Technician- Barrier Auditor
Experience in Inspection of Fuel injection component -Element
Element- Plunger and Barrel assembly
Functional, dimensional, fuel control nomenclature of Plunger (fuel control grooves in element plunger- Fuel stop groove, Control helix, Timer groove, Fuel starting groove ) and visual parameters
Manufacturing process involved
Pre-honing(accuracy±0.0025mm), Profile grinding(accuracy 0.001m), Finished lapping (accuracy0.0005mm), ultrasonic cleaning, Plunger vane grinding(accuracy0.001mm), Plunger groove grinding (accuracy0.001mm), finish match grinding (accuracy0.0005mm)
Responsibilities
The inputs will be given in form of Customer mounting dimension, Master Tooling gauge & drawings.
•Finished component measuring with the accuracy of 0.1µm by using special gauges as per input drawing and recorded in the monitoring chart
•Visual inspection by Techno scope
•Functional parameters- Pneumatic clearance of the Plunger and Barrel assembly by special equipment (Rota measurement)
•Measuring dimensions of fuel control grooves in element plunger- Fuel stop groove, Control helix, Timer groove, Fuel starting groove
•Process audit for manufacturing line
Element- Plunger and Barrel assembly
Functional, dimensional, fuel control nomenclature of Plunger (fuel control grooves in element plunger- Fuel stop groove, Control helix, Timer groove, Fuel starting groove ) and visual parameters
Manufacturing process involved
Pre-honing(accuracy±0.0025mm), Profile grinding(accuracy 0.001m), Finished lapping (accuracy0.0005mm), ultrasonic cleaning, Plunger vane grinding(accuracy0.001mm), Plunger groove grinding (accuracy0.001mm), finish match grinding (accuracy0.0005mm)
Responsibilities
The inputs will be given in form of Customer mounting dimension, Master Tooling gauge & drawings.
•Finished component measuring with the accuracy of 0.1µm by using special gauges as per input drawing and recorded in the monitoring chart
•Visual inspection by Techno scope
•Functional parameters- Pneumatic clearance of the Plunger and Barrel assembly by special equipment (Rota measurement)
•Measuring dimensions of fuel control grooves in element plunger- Fuel stop groove, Control helix, Timer groove, Fuel starting groove
•Process audit for manufacturing line
Technician-Barrier Auditor
Experience in GD&T measurement
GD&T measument for Various automotive component
Measurement of various component of fuel injection pump(Inline pump, Common rail diesel injection(CRDI) pump, Locomotive injection pump). In this components measuring of Roundness, Straightness, Parallelism, Concentricity, Total run out, conicity, surface finish
Responsibilities
The inputs will be given in form of specified drawing
Finished component measuring with the accuracy of 0.01µm by using special fine measuring instrument - MMQ400 (Making from Mahar- Germany)
•Verification of fine measuring instrument accuracy with in 0.01µm by using of proof cylinder and recorded the accuracy control chart
• Verification of Laboratory temperature and humidity and recorded in control chart
•Measure the specified GD&T of component
•Verify the measurement as per the Bosch standard
•Maintained the laboratory record as per Bosch standard
GD&T measument for Various automotive component
Measurement of various component of fuel injection pump(Inline pump, Common rail diesel injection(CRDI) pump, Locomotive injection pump). In this components measuring of Roundness, Straightness, Parallelism, Concentricity, Total run out, conicity, surface finish
Responsibilities
The inputs will be given in form of specified drawing
Finished component measuring with the accuracy of 0.01µm by using special fine measuring instrument - MMQ400 (Making from Mahar- Germany)
•Verification of fine measuring instrument accuracy with in 0.01µm by using of proof cylinder and recorded the accuracy control chart
• Verification of Laboratory temperature and humidity and recorded in control chart
•Measure the specified GD&T of component
•Verify the measurement as per the Bosch standard
•Maintained the laboratory record as per Bosch standard
Technician
Title
Location
Organised by
1
Fire fighting and safety
BOSCH
Bosch HRL
2
Product liability
BOSCH
Bosch vocational centre
3
Statistical Process Control(SPC)
BOSCH
Bosch vocational centre
4
5’S’ Program
BOSCH
Bosch vocational centre
5
Continues improvement process(CIP)
BOSCH
Bosch vocational centre
6
Environment Management System(EMS)
BOSCH
Bosch vocational centre
Location
Organised by
1
Fire fighting and safety
BOSCH
Bosch HRL
2
Product liability
BOSCH
Bosch vocational centre
3
Statistical Process Control(SPC)
BOSCH
Bosch vocational centre
4
5’S’ Program
BOSCH
Bosch vocational centre
5
Continues improvement process(CIP)
BOSCH
Bosch vocational centre
6
Environment Management System(EMS)
BOSCH
Bosch vocational centre
Share on Facebook
Share on Twitter
Share Via Email