Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Julo Marticio, Construction Superintendent Piping-IPMT

Julo Marticio

Construction Superintendent Piping-IPMT·Worley-Abu Dhabi

United Arab Emirates

Bachelor's degree, Bachelor of Science in Mechanical Engineering,

Work experience

Total years of experience: 15 years, 0 months

Construction Superintendent Piping-IPMT

February 2023 - November 2024

Worley-Abu Dhabi

Abu Dhabi, United Arab Emirates

February 2023 - November 2024

Client: Borouge (Abu Dhabi Polymer Company)
Project Budget-$6.2 billion. Abu Dhabi Polymers Company Ltd., (Borouge) is a Joint Venture Company between Abu Dhabi National Oil Company (ADNOC) and Borealis AG (BOREALIS). Complex consists of several process units based around a 1.5 MTPA Gas Cracker with flexibility of propane co-cracking facilities. The primary products from crackers will be Polymer Grade Ethylene, Polymer grade Propylene, Raw C4s and Pygas. The ethylene will feed two high density / linear low density polyethylene (HDPE / LLDPE) plants, butene-1 and hexene-1 plants. Ethane Cracker EU4 will process ethane and propane, to produce polymer grade ethylene product stream as well as other secondary streams. The Ethane Cracker Unit will include C4 Hydrogenation Units and steam production. The feedstocks are taken from ADNOC Gas.
Job Description:
• Responsible for Piping works- Underground & Aboveground for Ethane Cracker Unit, Hydrogeneration Area and Steam Production
• Aboveground Piping SCOPE- 1.2million inch dia (Fabrication & Field Welding) including the package/vendor pipe for VHP Boiler, Furnaces, Cracked Gas Compressor, Ethylene & Propylene & Hydrogen Compressor, Quench Towers, C3/C2 Splitters, Reactor and Dryer.
• Participating in regular on-site CONTRACTOR Progress Meeting, Advance Work Package (AWP) and interface meetings especially from fabrication Sub-CTR, IP Points (Interface) from other packages.
• Provide inputs and close working relationship with Sr. Planning/Scheduler and Construction Manager for planning of three weeks look ahead activity from CONTRACTOR related to piping construction job, in accordance with the overall planning schedule and providing possible bottleneck that will hindrance the progress.
• Monitor the contractor/ subcontractors construction manpower requirements and advise whether additional resources will be required to maintain schedule due to possible lack of progress, material delays or productivity issues and advise Construction Manager on any potential VARIATION to Scope of Work, which may generate cost or time impact.
• Participate in site HSE Walkthrough and Site Quality Audits and coordinate with EPC team to ensure compliance and close out.
• Reviewing, approval and comment on engineering deliverables such as Procedures, Technical Query (TQs) and construction deliverables such as MS (Method Of Statement), MAR (Material Approval Request) and Task Risk Assessment/JSA.
• Close monitoring on the System & Subsystem Priorities inline with the Commissioning team for the 1st Boiler Start-up and Energization of the Substation
• Participating in MC/RFC walk down and PSSR walk down with CONTRACTOR & END-USER and generate punch list.

Company industry:
Petrochemicals & Refined Petroleum Products Manufacture

Construction Supervisor-Piping (PMC)

April 2019 - January 2023

Worley-Abu Dhabi

Abu Dhabi, United Arab Emirates

April 2019 - January 2023

Project Budget-$650 million- Project Worley- Abu Dhabi, Seconded/ Client representative to (Owner/ Operator- ADNOC
Onshore), ADNOC state owned Oil and Gas Company. Major Construction Activities of Civil Infrastructure, Structures,
Roads, Mechanical Equipment foundations, Structural Steel and Buildings activities which includes the main execution of
the Modifications to existing Central Degassing Station & Gatherings Station, as follows One (1) new Production Separator,
Two (2) Slug Catchers, Two (2) new Booster Pumps, Three (3) new MOL pumps, One (1) new Gas Injection Compressor
Train, One (1) new Gas Lift Compressor Train, One (1) Common Glycol Regeneration Unit, One (1) new Water Separation
Tank, One (1) new Water Disposal tank, Three (3) new Pig Traps: 1 Receiver (Oil), 3 Launchers (2 GL, 1 GI), Re-utilizing
existing MOL pumps as Disposal pumps, ITR Building, Overhead Line (OHL) including additional Seven (7) Crude Oil Well
PADS and Flowlines from 56 Wellheads.
Job Description:
• Responsible for Piping works- Underground & Aboveground in Brownfield Area-modification in CDS (Central Degassing
Station and Gathering Station)
• Aboveground Piping SCOPE- 950k inch dia (Fabrication & Field Weld) including the package/vendor pipe for the separator,
slug catcher, MOL, Compressor, Well pads and Flowlines
• Monitor the look ahead work plans to conformance with the overall schedules and Inform/ Alert the Construction Manager
to any slippage activities, delays versus contractual schedule base plan.
• Monitoring and managing inspection of the construction work performed by the EPC Contractor and/or its subcontractors
to verify that such work is performed in compliance with the approved procedures and specifications, and that the
workmanship is in accordance with appropriate standards of quality.
• Reviews construction sites and assists in obtaining the necessary work permits and work authorizations from ADNOC
Operations prior to commence the works executions, adherence by ADNOC standard procedures and HSE policies.
• Provide safety leadership to Contractor/ Sub-Contractor employees, to ensure implementation of health safety and
environment procedures and promote (ADNOC-LSR’s & 100%HSE).
• Responsible for Risk Management (Team Leader) to ensure all risks/opportunities are identified and appropriate controls
and mitigations developed and implemented and SIMOPS coordination.
• Reviewing material approval request (MAR), method statement (MS), As built, Mechanical Completion Dossier.

Company industry:
Oil & Gas

Construction Engineer (Piping/Mechanical)

May 2018 - March 2019

Bilfinger Deutsche Babcock

Abu Dhabi, United Arab Emirates

May 2018 - March 2019

Project Scope
• Integration of a new power block with the existing power plant and supplying steam, power, and utilities to the
refinery. The integrated power plant can supply steam to the refinery from several heat-recovery steam generators.
(HRSGs), improving the availability and operational flexibility of the plant.
• Responsible for Piping works- Aboveground and mechanical equipment- Steam Boiler, Ductings, Pumps, Lube Oil

Company industry:
Oil & Gas

Construction Piping Engineer

March 2017 - May 2018

Consolidated Contractor Company (CCC)

Abu Dhabi, United Arab Emirates

March 2017 - May 2018

Project Scope
• Scope A: Modifications at Umm Shaif Process Plant (USP) Production Facilities at Das Island to process additional oil
production from NASR FFD which will be received at Das Island via 16” Main Oil Line
• Scope B: Installation of a new boiler (Boiler 9), installation of new utility substation, modification of Flares US-3A and US-4

Company industry:
Oil & Gas

Project Engineer

April 2014 - January 2017

Gulf Oil and Gas (GOGAS), UAE

Abu Dhabi, United Arab Emirates

April 2014 - January 2017

Project Scope
• Detailed Engineering, Procurement and Construction of Borouge Iso-Container storage yard to ease container logistic and
to ensure safe handling of hazardous chemicals. The container yard consists of steel frame, covered roof, open side,
standard concrete paving and fire walls to segregate between different critical chemicals. Appropriate lightening and fire
and gas detectors will be provided. The chemicals stored in the container storage are: Isooctane, PAL, Hyper oil, VTMS,
HDTMS, Octadiene, Waste Oil, and Hexane ISO containers.

Company industry:
Petrochemicals & Refined Petroleum Products Manufacture

Construction Piping Engineer

November 2010 - April 2014

Consolidated Contractor Company (CCC), UAE

Abu Dhabi, United Arab Emirates

November 2010 - April 2014

| Full Field Development (SAS Project) | Client: Abu Dhabi Company for Onshore
Operation (ADCO)
Project Scope
• SAS Full Field Development Plan to expand the existing gathering network and degassing plants in Sahil, Asab and Shah
Fields. Reservoir fluid is bulk dewatered, degassed, and partially stabilized crude oil that has been collected at both the
Remote Degassing Station (RDS-1) and the Central Degassing Station (CDS) both at Sahil for processing before being
transferred to the CDS at Asab for blending with various other field fluids and further processing. Recovered gas at Sahil is re
injected through injection wells to increase the reservoir pressure and enhance oil production of the fields.

Company industry:
Oil & Gas

Junior Mechanical Engineer

November 2009 - October 2010

Amalgated Inc. Philippines

Manila, Philippines

November 2009 - October 2010

Maynilad Aguinaldo Pipe Laying Project| Client: Maynilad Water Services,
Incorporation
Project Scope
• Maynilad Water Services, Inc. is spending P450 million for the installation of a 1, 400-millimeter (mm) primary line from the
Las Piñas/Baclaran boundary of Coastal Road to Tirona Highway in Bacoor, Cavite, and a 700-mm primary line from Tirona
Highway to Mambog in Imus, Cavite.

Company industry:
Project & Construction Planning

Education

Saint Louis University

June 2009

June 2009

Bachelor's degree, Bachelor of Science in Mechanical Engineering,

Philippines

Skills

Commissioning
Expert
Commissioning
Expert
Field Engineering
Expert
Field Engineering
Expert
Project Management
Expert
Project Management
Expert
CONSTRUCTION
Expert
CONSTRUCTION
Expert
AWP Advanced Work Package
Expert
AWP Advanced Work Package
Expert
FABRICATION
Expert
FABRICATION
Expert
INSTALLATION
Expert
INSTALLATION
Expert
Hydrotest/Pneumatic/Leak Test
Expert
Hydrotest/Pneumatic/Leak Test
Expert
MANAGEMENT
Expert
MANAGEMENT
Expert
Easy Plant/Easy Plant 3D/Spool Management
Expert
Easy Plant/Easy Plant 3D/Spool Management
Expert
LEADERSHIP
Expert
LEADERSHIP
Expert
Abu Dhabi Marine Operating Company Training (ADMA-OPCO) Standards
Intermediate
Abu Dhabi Marine Operating Company Training (ADMA-OPCO) Standards
Intermediate
Abu Dhabi Company Onshore Company(ADCO)
Intermediate
Abu Dhabi Company Onshore Company(ADCO)
Intermediate
Method Statement/TRA Inspection and Test Plan (ITP) ASME B31.1 Power P
Intermediate
Method Statement/TRA Inspection and Test Plan (ITP) ASME B31.1 Power P
Intermediate
Microsoft Office 2007, 2010
Expert
Microsoft Office 2007, 2010
Expert
Project Management
Intermediate
Project Management
Intermediate
International codes such as ASME/ANSI, ASTM, API and some common International standards & codes for
Intermediate
International codes such as ASME/ANSI, ASTM, API and some common International standards & codes for
Intermediate
Piping
Intermediate
Piping
Intermediate
Engineering, FEED and Detailed Engineering
Intermediate
Engineering, FEED and Detailed Engineering
Intermediate
Construction
Intermediate
Construction
Intermediate
Bid Evaluation- Tender
Intermediate
Bid Evaluation- Tender
Intermediate
HAZOP and Safety Review Meeting Participation
Intermediate
HAZOP and Safety Review Meeting Participation
Intermediate
Lifting Supervisor for Mobile Cranes (
Intermediate
Lifting Supervisor for Mobile Cranes (
Intermediate
Mechanical
Intermediate
Mechanical
Intermediate
ICAPS© /OPERCOM, Adobe Acrobat, Auto CAD, 3D Modeling Naviswor
Intermediate
ICAPS© /OPERCOM, Adobe Acrobat, Auto CAD, 3D Modeling Naviswor
Intermediate
Equipment, Piping Erection and Critical Tie Ins
Intermediate
Equipment, Piping Erection and Critical Tie Ins
Intermediate
Commissioning
Expert
Commissioning
Expert
Field Engineering
Expert
Field Engineering
Expert

Languages

Filipino
Native Speaker
English
Expert

Memberships

Member of Professional Association Philippines Society for Mechanical Engineer (PSME)

Philippines Society for Mechanical Engineer (PSME)

November 2009

International Association of Safety Professional-IASP

Rodech Philippines, 2010

December 2010

Training and Certifications

Certifications
Philippine SOciety For Mechanical Engineer