Total Years of Experience: 15 Years, 10 Months
September 2017
To October 2020
Contracts Administrator| Senior Estimator
at ARC (The Australian Reinforcing Company)
Location :
Australia
Responsibilities
• Liaise, build relationships with clients and internal teams on projects including commercial, residential, civil construction ranging from $170k-$2M jobs
• Read, analyze and interpret drawings, take off the steel quantities and Bill of Quantities (BOQ)
• Prepare the estimated quote based on Bill of Quantities for submitting in the tender
• Liaise with Procurement, assess with new/special items in the estimating system database as required for inclusions in tender documentation.
• Manage and tracking tonnage of steel requirement with the estimated quantities and if there is any possibility to cross it the estimation, raise the flag and inform the customer upfront so that any further confusion will not raise
• Check the actual tonnage and deal with the back charge came from the customer
• Inspect sites and meeting as required
Achievements
• Developed a reinforcement estimation and schedule for Melbourne Park Redevelopment Project that saved an estimated $8000 by using site data, rather than following the typical detail and specifications
• Achieved a 15% increase in efficiency in the handling and delivery of materials to a remote location having collaborated with internal stakeholders based on the client’s list of priorities
• Liaise, build relationships with clients and internal teams on projects including commercial, residential, civil construction ranging from $170k-$2M jobs
• Read, analyze and interpret drawings, take off the steel quantities and Bill of Quantities (BOQ)
• Prepare the estimated quote based on Bill of Quantities for submitting in the tender
• Liaise with Procurement, assess with new/special items in the estimating system database as required for inclusions in tender documentation.
• Manage and tracking tonnage of steel requirement with the estimated quantities and if there is any possibility to cross it the estimation, raise the flag and inform the customer upfront so that any further confusion will not raise
• Check the actual tonnage and deal with the back charge came from the customer
• Inspect sites and meeting as required
Achievements
• Developed a reinforcement estimation and schedule for Melbourne Park Redevelopment Project that saved an estimated $8000 by using site data, rather than following the typical detail and specifications
• Achieved a 15% increase in efficiency in the handling and delivery of materials to a remote location having collaborated with internal stakeholders based on the client’s list of priorities
August 2016
To September 2017
Contracts Administrator|Estimator
at Bestbar Reinforcement Pty Ltd
Location :
Australia
Responsibilities
• Liaise, build relationships with clients and internal teams on projects including commercial, residential, civil construction ranging from $100k-$1.5M jobs
• Read, analyze and interpret drawings, take off the steel quantities and Bill of Quantities (BOQ)
• Prepare the estimated quote based on Bill of Quantities for submitting in the tender
• Liaise with Procurement, assess with new/special items in the estimating system database as required for inclusions in tender documentation.
• Manage and tracking tonnage of steel requirement with the estimated quantities and if there is any possibility to cross it the estimation, raise the flag and inform the customer upfront so that any further
• confusion will not raise
• Check the actual tonnage and deal with the back charge came from the customer
• Inspect sites and meeting as required
Achievements
• Developed a reinforcement estimation and schedule for Eastwood site an estimated $6000 by using site data, rather than following the typical detail and specifications
• Achieved a 10% increase in efficiency in the handling and delivery of materials to a busy location having collaborated with internal stakeholders based on the client’s list of priorities
• Liaise, build relationships with clients and internal teams on projects including commercial, residential, civil construction ranging from $100k-$1.5M jobs
• Read, analyze and interpret drawings, take off the steel quantities and Bill of Quantities (BOQ)
• Prepare the estimated quote based on Bill of Quantities for submitting in the tender
• Liaise with Procurement, assess with new/special items in the estimating system database as required for inclusions in tender documentation.
• Manage and tracking tonnage of steel requirement with the estimated quantities and if there is any possibility to cross it the estimation, raise the flag and inform the customer upfront so that any further
• confusion will not raise
• Check the actual tonnage and deal with the back charge came from the customer
• Inspect sites and meeting as required
Achievements
• Developed a reinforcement estimation and schedule for Eastwood site an estimated $6000 by using site data, rather than following the typical detail and specifications
• Achieved a 10% increase in efficiency in the handling and delivery of materials to a busy location having collaborated with internal stakeholders based on the client’s list of priorities
January 2016
To August 2016
Junior Contracts Administrator|Estimator
at Datumn Group Construction Pty Ltd
Location :
Australia
Responsibilities
• Checked all architectural and engineering drawings, specifications, conditions of contract, schedule and other tender related documents to estimate quantity
• Performed take offs for preparing the bill of quantities (BOQ)
• Checked all architectural and engineering drawings, specifications, conditions of contract, schedule and other tender related documents to estimate quantity
• Performed take offs for preparing the bill of quantities (BOQ)
January 2010
To December 2015
Senior Contracts Administrator|Estimator
at Bharti Airtel
Location :
Bangladesh
Responsibilities
• Read, analyze and interpret drawings, take off the required material quantities as per the specifications, standards so that customer can aware of the standard options, sizes, reflecting current pricing and specifications and these can available for the production estimation team/procurement for order preparation
• Administered master register for controlling all project documentation
• Prepared project expenditure reports, administered requests for information (RFI’s) and assisted with head contracts, progress claims, delay claims and managed external variations
• Reviewed and assessed subcontractor claims and creditor invoices
• Prepared payment schedules
• Developed construction programs and updates, tracked against site progress, implemented change controls, updated variations and communicated with client to get approvals
• Identified alternate solutions and performed value engineering to optimize time and cost by maintaining required quality
• Prepared cost forecasts and completed cost planning and budgeting as well as maintained the project budget to accurately report on monthly performance
Achievements
• Prepare around 800 telecommunication construction sites’ Bill of Quantities (standard type like Greenfield, roof top, share sites) for tender submission and process and claim for billing after completion of projects.
• Bill of Quantity preparation, check, and cost control for G+7 MSC building which is $7.5M project includes negotiation with contractors/suppliers, working closely with Procurement department
• Read, analyze and interpret drawings, take off the required material quantities as per the specifications, standards so that customer can aware of the standard options, sizes, reflecting current pricing and specifications and these can available for the production estimation team/procurement for order preparation
• Administered master register for controlling all project documentation
• Prepared project expenditure reports, administered requests for information (RFI’s) and assisted with head contracts, progress claims, delay claims and managed external variations
• Reviewed and assessed subcontractor claims and creditor invoices
• Prepared payment schedules
• Developed construction programs and updates, tracked against site progress, implemented change controls, updated variations and communicated with client to get approvals
• Identified alternate solutions and performed value engineering to optimize time and cost by maintaining required quality
• Prepared cost forecasts and completed cost planning and budgeting as well as maintained the project budget to accurately report on monthly performance
Achievements
• Prepare around 800 telecommunication construction sites’ Bill of Quantities (standard type like Greenfield, roof top, share sites) for tender submission and process and claim for billing after completion of projects.
• Bill of Quantity preparation, check, and cost control for G+7 MSC building which is $7.5M project includes negotiation with contractors/suppliers, working closely with Procurement department
April 2006
To December 2009
Contracts Administrator|Estimator
at Warid Telecom
Location :
Bangladesh
Responsibilities
• Read, analyze and interpret drawings, take off the required material quantities as per the specifications, standards so that customer can aware of the standard options, sizes, reflecting current pricing and specifications and these can available for the production estimation team/procurement for order preparation
• Administered master register for controlling all project documentation
• Reviewed and assessed subcontractor claims and creditor invoices
• Prepared payment schedules
Achievements
• Prepare around 300 telecommunication construction sites’ Bill of Quantities (standard type like Greenfield, roof top, share sites) for tender submission and process and claim for billing after completion of projects.
• Bill of Quantity preparation, check, and cost control for G+2 Remote BSC site building which is $4M project includes negotiation with contractors/suppliers, working closely with Procurement department
• Read, analyze and interpret drawings, take off the required material quantities as per the specifications, standards so that customer can aware of the standard options, sizes, reflecting current pricing and specifications and these can available for the production estimation team/procurement for order preparation
• Administered master register for controlling all project documentation
• Reviewed and assessed subcontractor claims and creditor invoices
• Prepared payment schedules
Achievements
• Prepare around 300 telecommunication construction sites’ Bill of Quantities (standard type like Greenfield, roof top, share sites) for tender submission and process and claim for billing after completion of projects.
• Bill of Quantity preparation, check, and cost control for G+2 Remote BSC site building which is $4M project includes negotiation with contractors/suppliers, working closely with Procurement department
January 2005
To March 2006
Junior Contracts Administrator|Estimator
at OrasInvest (BD) Limited
Location :
Bangladesh
Responsibilities
• Estimated material and resource requirements from the design
• Prepared project scope, determined tender processes, prepared tender documents
• Prepared proposals, gathered pre-contract data and assisted with administering contracts
• Prepared estimates in building projects based on work activity and in work packages to use for the planning, organizing and scheduling of work
• Estimated material and resource requirements from the design
• Prepared project scope, determined tender processes, prepared tender documents
• Prepared proposals, gathered pre-contract data and assisted with administering contracts
• Prepared estimates in building projects based on work activity and in work packages to use for the planning, organizing and scheduling of work
Share on Facebook
Share on Twitter
Share Via Email