  • My current job since July 2017

The project name is District Cooling Plant DCP-02.
-The project budget is (65, 000, 000) DHs
-The owner of project is EMAAR.
-work in structural work, Water Proofing, Finish work, infrastructure work (water
supply network- sanitation facilities network- Rainwater drainage network).

project manager at Wade El Nil
  • May 2009 to July 2010

in structural work, infrastructure work (water supply network- sanitation
facilities network- Rainwater drainage network), block work, finishing work, water
proofing work, plumbing work& marble

project manager assistant at AL ZAMALEK contractures.gen.com
  • United Arab Emirates
  • January 2007 to May 2009

The project name is HOREIZON Towers.
-The project budget is (430, 200, 000) D.HS
-The owner of project is SHEIKH HUMID BIN RASHED AL NOAIMI.
-work in structural work, block work, finishing work, water proofing work,
plumbing work, marble work, firefighting fire alarm system, false ceiling,
certain wall, Air condition system, sauna, swimming pools& Jacuzzi pools
finishing

Resident engineer at AL
  • United Arab Emirates
  • September 2006 to January 2007

contractures.gen.com in project contain from

site engineer
  • April 2005 to September 2006

the (R.C box culverts Canales AND Bridges on pile capes for
MINISTRY Of Water resources& Irrigation.)
-The project consists of bridge on pile caps on the El hebiel drain, Luxor.
-The project budget is (200, 000) LE.
-The project consists of R.C box culverts of Mettawa canal.
-The project budget is (650, 000) L.E

site engineer at Mars
  • United Arab Emirates
  • January 2004 to January 2005

The project consists of 4 R.C. frame Building contain of (4
base) -The project budget is (5, 000, 000) LE.
-work in structural work, infrastructure work (water supply network- sanitation
facilities network- Rainwater drainage network- Transmission lines and power
supply parts- Networks of telephone lines, signal lines and early warning lines-
Waste disposal facilities and dumps), block work, finishing work, plumbing work,
firefighting, fire alarm system, Air condition system.

engineer
  • September 2003 to January 2004

on the executive in the different field in (THE

at CONSTRUCTION AND services Home
  • Egypt
  • June 2002 to October 2002

Training in The general Arab contractures.com in project contain from
(g+2base+12 floors).
Name of project: The police rest Hotel
Place of project

Education

Bachelor's degree, civil engineering
  • at South Valley University
  • June 2003

in

Specialties & Skills

ساب 2000
AutoCAD
Microsoft Excel
BRIDGES
BUDGETING
FRAMING
NETWORKING
PLUMBING
POWER SUPPLIES
PROOFING
TELEPHONE SKILLS

Languages

Arabic
Expert
English
Expert
French
Expert