- Documented more than 15 Construction Method Statements for tendering discipline.
- Researched on New Technologies based on organization needs resulted in more than 10 formal written packages.
- Designed and Conducted Knowledge Management system in organization and more than 6 projects.
- Proposed and Consulted on New Construction Systems Deployments in projects like BIM, Lean Construction.
- Managed more than 10 Research and Development projects in the corporation.
- Conducted more than 30 Engineering contracts.
- Prepared conditions and clauses and the draft documents needed for engineering consultant contracts.
- Reviewed and corrected the statements of consultants.
- Estimated and computed bill of quantity and material take-off of the works.
- Monitored the contractor’s progress and performance to ensure goods and services conform to the contract requirements.
- Authorized payments consistency with the contract terms.
- Resolved disputes in a timely manner.
- Monitored contractor activities on a specified frequency to identify problem areas.
- Established control of correspondence, data, and reports.
- Identified potential problems and solutions.
- Coordinated the contracts for handing out the deliverable aims, finalization, and termination.
- Issued more than 10 fundamental primary introduction report.
Civil works Design for power plant
- Intake Structure hydraulic and structural design.
- Water distribution system design.
- Designing open channels for water conveyance (cooling water systems).
- architectural design and alignments for site plan.
- road and pavement design.
Member of Technical office and Project control in Kamandan Dam Project
- Project management and scheduling in technical office.
- Estimation and analysis of materials.
- Shop drawing and shop designing.
- method statements preparation.
- machinery management in clay inner construction.
- Construction of Tabarakabad Dam, Member of Technical office, Quchan, Iran, 2002 for 5 month
- Construction of Roodasht Water Conduction Canal, Roodasht (South of Isfahan), 2004 to 2005
- Project Manager's Assistant, Roodasht Water Conduction Canal, Isfahan, Iran, 2005-2006
Thesis: Develop A Budget Allocation Model for Quality Costs in EPC Mass Housing Projects Supervisors: Dr. M. Gholhaki, Dr. A. Niusha, and Dr. A. De Marco.