Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Muhammad Huzaifa Tariq, Electrical Design Engineer

Muhammad Huzaifa Tariq

Electrical Design Engineer·JGC GULF INTERNATIONAL

Saudi Arabia

Master's degree, MS Enginnering Managment

Work experience

Total years of experience: 7 years, 11 months

Electrical Design Engineer

April 2024 - Present

JGC GULF INTERNATIONAL

Khobar, Saudi Arabia

April 2024 - Present

I am responsible for the Electrical Design Deliverables for the EPC Project DPCU for Aramco.

Company industry:
Electrical Engineering
Job role:
Electrical Engineering

Electrical Design Engineer

July 2018 - Present

Descon

Lahore, Pakistan

July 2018 - Present

As an electrical design enginner, my responsibility is to prepare and review the following documents

•Preparation of Electrical Load List, Single Line Diagram, Cable sizing calculations, Cable Schedule, Generator & Transformer sizing, Sizing & selection of LV/MV Switchgear, & UPS.

•Electrical Design basis, Grounding Philosophy, Lighting Philosophy, constructional layouts
Power, Lighting and Grounding layouts, Substation layouts, and Cable trench/tray layouts.

•Hazardous Area Classification Design, Preparation of design of Heat Trace System, Review of vendor design for Telecom & CCTV & Plant SCADA System.

•Preparation of DCR and DCR planner and indicate the milestones as agreed with client.

•Preparation of Engineering schedule aligning with EPC Project schedule.

•Execution of all project phases as per defined specifications and timelines

• Technical Review of Electrical Interconnections and Schematic Diagrams

• Data Sheet, Material Requisite Technical Bid evolution of Electrical Equipment

•∆MTO/BOQ Estimation and Proposal write-up.

•Capable of working with different Models of ETAP such as (Load Flow, Short Circuit, Motor Starting, & Transient Analysis, Relay cordination)

•Lighting Lux Level Calculations for both outdoor and indoor lighting using DIALUX.

• Preparation of RFQ, TBE and VDOC review of electrical equipment.

Project details
1. AkAZOBLE

The Project scope is to provide EPC turn key solution for AkzoNobel Plant in order to enhance plant capacity
from 25ML to 75ML that is going to relocate from Lahore to Faisalabad. DESCON has been awarded Project
to Design and Build (EPC) New Moon Paints & Coatings Plant. Electrical scope included to Design (Detail
Engineering Deliverables & Studies), Procurement & Support for Installation of Electrical equipment like
Power generation, Transformers MV/LV Switchgear, UPS system etc.

2. ICI PAKISTAN (Soda Ash) - 60 KTPA LIGHT ASH EXPANSION IN COMBINATION WITH 75KTPA
ICI PAKISTAN (DOL), who wants to further increase capacity of their existing Soda Ash plant in Khewra,
Pakistan. As a part of Electrical Design team, prepared Electrical Detailed Engineering works not limited to
Load list, SLD, System studies (LF, SC & MS), Power Layouts, Cable sizing calculation, Cable Tray Layouts,
Grounding & lighting calculation using DIALUX.

3. TASNEE - COOLING WATER GRP LINES REPLACEMENT PROJECT
The scope of this project was to develop Front-End-Engineering Design (FEED I) package for replacing GRP
(Glass Reinforced Plastic) to CS (Carbon Steel) in SEPC (Saudi Ethylene & Polyethylene Company.) CW
network. This project also covers the Load Flow, Short Circuit and Motor Starting studies that are carried out
to determine the adequacy check after the replacements of lines and verify the appropriate MV & LV power
cable sizes to be used for FEED after relocation of five Nos. of existing CW circulation pumps, existing vital
cooling water pump, and 02 existing Chemical dosing skids.

4. SABIC (Ar-Razi) - MV CABLE REPLACEMENT
Ar-Razi, an Affiliate of SABIC had a fault in one of their MV Cables feeding Power from Central Substation -
IV (CSS-IV) to Local Substation - IV (LSS-IV). The cable has since been isolated and out of service. Ar-Razi
intended to install new MV Power Cable on an alternate route on Cable Trays from CSS-IV to LSS-IV.
DESCON services are engaged to develop the Front-End Engineering Design for the project.

5. SABIC (Petrokemya) - SALT BOOSTER PUMP
Complete DEED Package was developed and prepared all necessary engineering documents, specifications
and procedures related to the Design, Procurement, Installation, Testing and Commissioning of all Electrical
equipment proposed for the Power Supply of Booster Pump and its auxiliaries.

Company industry:
1344
Job role:
Electrical Engineering

Education

Universty of Engineering and Technology lahore

July 2022

July 2022

Master's degree, MS Enginnering Managment

Pakistan

University Of Lahore C.G PA

January 2019

January 2019

Bachelor's degree, Electrical Engineering

Pakistan

GPA (point): 3.15 out of 4

GPA (point): 3.15 out of 4

Specialization in Power with Final year project in System Studies of a Refinery using System studies and done it's economic dispatch.

Punjab College

January 2014

January 2014

High school or equivalent,

Pakistan

.C. 1-II (

Punjab College

January 2012

January 2012

High school or equivalent,

Pakistan

courses: DPS Model Town GRADE –A

Skills

ADOBE PHOTOSHOP
Beginner
ADOBE PHOTOSHOP
Beginner
AUTOCAD
Beginner
AUTOCAD
Beginner
BUSINESS DEVELOPMENT
Beginner
BUSINESS DEVELOPMENT
Beginner
CABLING
Beginner
CABLING
Beginner
COMPETITIVE
Beginner
COMPETITIVE
Beginner
CONVERSION
Beginner
CONVERSION
Beginner
DC
Beginner
DC
Beginner
ELECTRONICS
Beginner
ELECTRONICS
Beginner
INVENTORY MANAGEMENT
Beginner
INVENTORY MANAGEMENT
Beginner
MARKETING
Beginner
MARKETING
Beginner
System Studies Using ETAP
Expert
System Studies Using ETAP
Expert
Lighting Lux level Calculation
Expert
Lighting Lux level Calculation
Expert

Languages

Arabic

Beginner

English

Expert

Urdu

Native Speaker

Memberships

Pakistan Enginnering Council

Registered Enginner.

January 2019

Training and Certifications

Training
IOT and Home Automation using PLC and HDMI
INOVATIVE
Jan 2021

Hobbies and interests

Interest in Arabic Language

I have very much interest in learning Arabic language it's grammar and prhases so that I may understand QURAN easily.