Project Engineer (Electrical)
SECUTRONIC
Total years of experience :12 years, 1 Months
A brief overview of major responsibilities associated therewith is as follows:
• Developing plans for each engineering assignment detailing scope, nature and timing of the activities;
• Effective planning and co-ordination to complete assignments in order to meet stringent deadlines by identifying customer requirements, including supervision, training and motivation of team members;
• Fulfilling requirements necessitated by the client / customer to provide highest level of security against any type of threat;
• Confirm systems’ and components’ capabilities by designing testing methods;
• Solving and configuring technical system level issues in devices;
• Assures quality by performing periodic preventive maintenance along with corrective maintenance of industrial security systems of Saudi Aramco;
• Coordinating with different project stakeholders and having direct and effective liaison with the client;
• Keeps equipment operational by following manufacturer’s instructions and established procedures;
• Prepare periodic reports by collecting, analyzing and summarizing information and trends; and
• Contributes to team effort by accomplishing results as needed.
To operate Distributed Temperature Sensing (DTS) system i.e. using a double ended fiber optic cable to interpret the surrounding temperature and the fiber length.
To operate Uniconn, a device which is used to interpret the downhole temperature and pressure with the help of NLQG gauges with the quartz crystal operated.
To perform technical reception of packers (used in oil wells for extracting oil) and gauges to mark them with the "OK" certification.
To maintain the workshop manual (all service tools) of a department (completions in my case) presenting in a hard coded laminated form filed with graphical designing helping any one to find what he / she needs.
Scored CGPA of 3.21 / 4.00