Work Experience

Total years of experience :33 years, 10 Months

Resident Engineer (Utilities) at Ch2m Hill Halcrow
  • Qatar - Doha
  • My current job since October 2016

Recognized as a savvy leader with strength in engineering business process, accelerating colleague’s strength and building powerful team that can conquer any obstacles and natural leadership talents to steer team. Perform difficult and complex field engineering assignments involving the development, execution, supervision, design and coordination of all technical aspects of a construction project. Well aware in using state of the art methods of construction, competent in sorting out site problems, shooting out troubles which may cause time loss and work delays. Ability to manage a project from conception through final construction supervises and monitors project progress including coordination with the Clients, Contractors, design teams, construction coordination and site visits. Preparing the study reports for the maintenance projects based on the data collected from the field. Familiar with the PCI calculations (Pavement Condition Index) and to prepare the cost estimates for work orders

Manage, implement and support during logistic planning during pre-construction period, develop communication protocol between contractor, sub-contractor and Client, review of initial plans (Health safety and Environmental plan, quality plan etc.), expedite in responding contractor (RFI’s), review of contractors plan for site organization, coordinating with local authorities as required, implement construction method, interface between contractor working in close proximity, establishing procedures for timely submission of shop drawing and samples to be reviewed and approved, conduct regular meeting with the employer, contractor, sub-contractor and other concerned authorities for overall coordination to ensure to the extent reasonably possible timely completion. Review all the Client instructions before issue to the Contractor, preparing a list of outstanding works and providing the same to the Contractor, Obtaining a written undertaking from the Contractor to complete any outstanding work during the Defects Liability Period.

Senior Resident Engineer/Resident Engineer infrastructure at Dorsch Qatar
  • Qatar - Doha
  • December 2012 to September 2016

Recognized as a savvy leader with strength in engineering business process, accelerating colleague’s strength and building powerful team that can conquer any obstacles and natural leadership talents to steer team. Perform difficult and complex field engineering assignments involving the development, execution, supervision, design and coordination of all technical aspects of a construction project. Well aware in using state of the art methods of construction, competent in sorting out site problems, shooting out troubles which may cause time loss and work delays. Ability to manage a project from conception through final construction supervises and monitors project progress including coordination with the Clients, Contractors, design teams, construction coordination and site visits. Preparing the study reports for the maintenance projects based on the data collected from the field. Familiar with the PCI calculations (Pavement Condition Index) and to prepare the cost estimates for work orders

Manage, implement and support during logistic planning during pre-construction period, develop communication protocol between contractor, sub-contractor and Client, review of initial plans (Health safety and Environmental plan, quality plan etc.), expedite in responding contractor (RFI’s), review of contractors plan for site organization, coordinating with local authorities as required, implement construction method, interface between contractor working in close proximity, establishing procedures for timely submission of shop drawing and samples to be reviewed and approved, conduct regular meeting with the employer, contractor, sub-contractor and other concerned authorities for overall coordination to ensure to the extent reasonably possible timely completion. Review all the Client instructions before issue to the Contractor, preparing a list of outstanding works and providing the same to the Contractor, Obtaining a written undertaking from the Contractor to complete any outstanding work during the Defects Liability Period.

Civil Engineer at 2012 Parsons Overseas limited
  • United Arab Emirates - Dubai
  • February 2012 to November 2012

Project: Improvements of Al Dhaid Interchange, King Abdul Aziz Interchange and University Interchange. T113/2010
Project Scope: This project is located along the Emirates road beginning at Sharjah Ajman interchange and continues toward the direction of Dubai. It is consisted of improvement of three major interchanges, Al Dhaid interchange, university interchange and king Abdul Aziz interchange. Apart of the major structural works the followings work are also included in the project scope. Widening of Emirates road to maintain a minimum five lanes in each direction, improvements to the existing services roads construction of drainage line including the pumping station and four drainage ponds within the existing loops of Kong Abdul Aziz Interchange
Client: Ministry of Public Works Dubai
Value: AED 430 Millions

Assistant Resident Engineer at Island Link Golf Course and Yacht Club Road
  • United Arab Emirates
  • November 2008 to December 2009

Installation of irrigation main line (10 km) consisted of HDPE pipes of sizes varies 225 mm diameter to 800 mm diameter and 60 km length of lateral lines of size 63 mm to 100 mm with sprinkler system.
•A drainage network provided for greens, tees, bunkers & fairways. Solid pipes, perforated pipes and catch basins have been incorporated
•Landscaping, stabilizing of soil, hydro seeding & Cart paths & access Paths construction.
•Installation of 2 nos. Steel water tanks of capacity one million gallons each
•Asphalt pavements/Interlock pavements for parking and access roads to Golf course as well as for Club House and Marina Yacht club access roads together with soft and hard landscaping
•Hauling of dredged material 1.4 million m3 and to form the sub grade according to the required contours

Senior Resident Engineer at 2016 Dorsch Qatar
  • December 2012 to January 2009

Lusail Plaza, Infrastructure, LRT stations and Landscaping
Client: Lusail Real Estate Development Company (LREDC) Qatar
Value: QR 4.3 Billion

Project: Design and Construction CP07 Hub Offices Complex
Project Scope: This project is consisting of combined CP7 hub office facilities for the contractors LREDC (Lusail Real Estate Development Company and LREDC Representative Offices). Major works comprises Roads with signalized junctions & covered parking facilities, Office Buildings, Structures, Potable Water & Fire Fighting Works, Irrigation, Foul Sewer Storm Water Drainage, HVAC, Fire Suppression System, Telecommunications, Gas Works, Street Lighting soft / hard landscaping and installation of hoardings and gates, Laboratory, Mini Market, Mosque and Kitchen and Canteen
Value: QR 240 Million

Project: Primary infrastructure Works for Water Front Residential & Al Khareej Towers - CP06B
Project Scope: This project is one of the phases of Lusail City which is consisting of 17 Districts and having 37 km2 areas. Major works comprises of Roads Highway Structures, Potable Water & Fire Fighting Works, Irrigation Foul Sewer Storm Water Drainage, Telecommunications, Gas Works, District Cooling, Street Lighting Etc
Value: QR-280 Million
Responsibilities as noted above .
•Responsible to handle design issues/discrepancies and takes an appropriate action on Contractor’s RFI’s (Technical queries)
•Responsible for execution and supervision of works in accordance to the project specifications under safe conditions.
•To handle the interface issues at the interface of the other projects.
•Review and approval of submittals (shop drawings, as-built drawings, prequalification documents of sub-contractors, method statement etc.).
•Drafting of contractual letters in accordance to the Contract requirements.
•Responsible for monitoring project progress in order to complete the project on time with cost control.
•Review of progress, safety and quality control reports. Responsible for conducting and attending weekly progress meetings and coordination meetings Liaison with the Client, local Authorities and other Stakeholders
•Maintain daily diary.
•Attending the coordination, interface & Authority Approval meetings.

Assistant Resident Engineer at Halcrow International Partnerships
  • United Arab Emirates
  • September 2006 to October 2008

Project: Expansion of ADIA (Abu Dhabi International Airport) contract NRTW -1008-CN NEW 2 K runway
Project Scope: The project was to prepare the site of the new runway and associated taxiways. Earthworks comprising approximately 5.6 million m3 of cut and approximately 4.4 million m3 of fill and other associated works asphalt 1.5 million tones, Air ground lights ducts, 133 km and 2500 AGL chambers.
Client: SCADIA (Supervision Committee of Abu Dhabi International Airport)
Value: AED 1 Billion, 44 Million & 800, 000.

Assistant Resident Engineer at pvt Ltd
  • United Arab Emirates
  • October 2004 to August 2006

Project: Maintenance and Construction Supervision of Roads/Bridges at various locations (North Region) Abu Dhabi (298/2004)
Project Scope: This project was consisted of Construction of road to Heritage club at Taweela Construction of dual carriage way of H.H.Sheikh Khalifa palace road (8 Km) and surface water drainage. Reconstruction of dual carriage way of AL Jurf palace road (15.3Km) construction of parking and surface water drainage at Samha (East) mosque and Seih Shueb food control station. Asphalt reinstatement to slow lane along with outer shoulder

Assistant Resident Engineer at pvt Ltd
  • United Arab Emirates
  • October 2002 to August 2006

Project: Maintenance and Construction Supervision of Roads/Bridges at Various Locations (western region) Abu Dhabi
Project Scope: Improvement of dual carriage way of Mazaira Hameem road (40 Km) Construction of road leads to Lewa hospital including helipad. Widening and reconstructing of dual carriage way of Mazaria Aradha road. Construction of U turn and Balloons (40 No) at Mazaira Hameem road
Client: Ministry of Public Works Abu Dhabi
Value: AED 140 Million

Civil inspector at Parsons (Deleuw Cather Overseas Limited)
  • United Arab Emirates
  • September 2001 to August 2002

Project: Ras Al Khor Interchange (R790\\1 Dubai)
Project Scope: Clover leaf interchanges with 4 directional Ramps and loops. Construction for Back Road consisted of 4 lanes on both bounds. Adding one more lane for Ras Al Khor road construction of double face barriers at Centre median of Ras Al Khor road Project also includes construction of road ways signage and pavement marking, street lighting irrigation ducts and protection to the existing services such as DEWA, WD, DEWA ED, Etisalat, Sewerage, storm water Drainage and Irrigation
Client: Dubai Municipality (RTA)
Value: AED 47 Millions

Civil inspector at Parsons (Deleuw Cather Overseas Limited)
  • United Arab Emirates
  • September 2000 to August 2001

Project: Dubai Ring Road Phase-1 (R577/4)
Project Scope: It was the post tensioned box girder bridge with 4 spans on pile foundation reinforced soil wall panels covered with one abutment while the other one was with stone pitching. Construction of Strom water drainage line in length of 12 Km .AC pipe of Dai 1.2m diameter has been utilized. Sewerage (10 km length of GRP pipe (0.7m diameter max.) including construction of man holes Rigid pavement -500 m length of rigid pavement was constructed, asphalt pavements, Upgrading of roads to dual carriage way. Nad Al Hamar road, MC 1, MC2, MC3 and 601 roads. These roads were consisted of AC\\DBM base course and wearing Course and Signalized junctions, up grading of Al Aweer road from 2 lanes to 3 lanes
Client: Dubai Municipality (RTA)
Value: AED 40 Millions

Assistant Resident Engineer at 2012 Dorsch Holding GmbH
  • United Arab Emirates
  • January 2010 to January 2001

Project: Dubai Fujairah Freeway Contract-3
Project Scope: This project consists of new East/West 3 lanes freeway linking Fujairah with Northern Emirates and Dubai via mountainous area. It is having 16 km length along with the five utilities bridges.
Client: Ministry of Public Works Dubai
Value: AED 424 Millions

Civil Inspector at Parsons (Deleuw Cather Overseas Limited)
  • United Arab Emirates
  • November 1998 to August 2000

Project: Roads in Jebel Ali Industrial area R593, Dubai
Project Scope: Supervision of major collector, industrial and local roads which were consisted of sub base, wet mix and asphalt concrete layers, protection to existing gas lines services and construction of utilities
Client: Dubai Municipality (RTA)
Value: AED 85 Million

Road Inspector at Zaabeel Consulting Engineers
  • United Arab Emirates
  • July 1997 to October 1998

Project: Used cars exhibition centre Dubai (PJ 1094)
Project Scope: This project was consisted of 120 showrooms along with the infra-structure works. Project comprises of Steel structure works, road works, drainage/sewerage, land capping curb stones.
Client: Dubai Municipality (RTA)
Value: AED 56 Millions

Project Director at Ministry of Local Governments and Rural Developmen
  • Pakistan
  • January 1994 to May 1997

Project: Farm to Market Roads and School at Various Locations in Sahiwal District

Assistant Director at Ministry of Communication of Pakistan (National Highway Authority)
  • Pakistan
  • November 1991 to April 1994

Project: Farm to Market Roads and School at Various Locations

Civil Engineer at Ministry of Local Governments and Rural Developmen
  • Pakistan
  • June 1989 to October 1991

Project: Construction of Roads, Schools, and Culverts and Inter lock pavements

Site Engineer at Sh. Fazal Hussain and Co
  • Pakistan
  • April 1988 to May 1989

Project: Construction of Bridge Over River Jhelum Pakistan
Project Scope: The Bridge has 940m length with 20m spans, each span 47m long. Super structure was consisting of post tensioned beams resting on 1.8m diameter cast in situ piles.

Resident Engineer at Utilities) (CH2M- Halcrow)
  • United Arab Emirates
  • to
Senior Resident Engineer at Dorsch Qatar-Lusail
  • to
Resident Engineer at Infrastructure Dorsch Qatar-Lusail
  • to
Civil Engineer at PARSONS
  • United Arab Emirates
  • to
Assistant Resident Engineer at DORSCH
  • United Arab Emirates
  • to
Assistant Resident Engineer at RAMBOLE MIDDLE EAST
  • United Arab Emirates
  • to
Assistant Resident Engineer at HALCROW
  • United Arab Emirates
  • to
Assistant Resident Engineer
  • United Arab Emirates
  • to
Project Director at LG & RD Pak
  • to
Assistant Director at National Highway Authority Pak
  • to

OF CAPABILITIES.

Recognized as a savvy leader with strength in engineering business process, accelerating colleague’s strength and building powerful team that can conquer any obstacles and natural leadership talents to steer team. Perform difficult and complex field engineering assignments involving the development, execution, supervision, design and coordination of all technical aspects of a construction project. Well aware in using state of the art methods of construction, competent in sorting out site problems, shooting out troubles which may cause time loss and work delays. Ability to manage a project from conception through final construction supervises and monitors project progress including coordination with the Clients, Contractors, design teams, construction coordination and site visits. Preparing the study reports for the maintenance projects based on the data collected from the field. Familiar with the PCI calculations (Pavement Condition Index) and to prepare the cost estimates for work orders

Manage, implement and support during logistic planning during pre-construction period, develop communication protocol between contractor, sub-contractor and Client, review of initial plans (Health safety and Environmental plan, quality plan etc.), expedite in responding contractor (RFI’s), review of contractors plan for site organization, coordinating with local authorities as required, implement construction method, interface between contractor working in close proximity, establishing procedures for timely submission of shop drawing and samples to be reviewed and approved, conduct regular meeting with the employer, contractor, sub-contractor and other concerned authorities for overall coordination to ensure to the extent reasonably possible timely completion. Review all the Client instructions before issue to the Contractor, preparing a list of outstanding works and providing the same to the Contractor, Obtaining a written undertaking from the Contractor to complete any outstanding work during the Defects Liability Period.

at Ras Al Khore
  • United Arab Emirates
  • to

29 years’ experience with capability of executing, supervising, monitoring, managing of Civil Engineering projects from start to finish specially, Roads, Highways, Retaining walls, Utilities (Wet & Dry) such as Storm Water drainage, Foul Sewer, Potable water, Etisalat / Qtel work, QAF, ITS, Irrigation network, Water storage Tanks, Street lighting, Electrical duct banks, Traffic signals & signs, Overhead gantries, Hard & Soft landscaping & Road Maintenance, also have experience in Aviation Industries for construction and supervision of Airport which meet CAT-IIIB operational requirement as per ICAO/GCAA.

During my experience I have handled some of the remarkable projects as listed below,

•Construction of Expressway East Corridor P011 (Package 2) Qatar.
•Lusail Plaza, Infrastructure, LRT stations and Landscaping (Qatar)
•Improvements of Al Dhaid Interchange, King Abdul Aziz Interchange and University Interchange. T113/2010

and at AGL
  • to

I have been assigned for responsibilities of construction supervision, shop drawings, method statements, and progress updates, records, monitoring and handling the technical queries of the following activities.

• Earthworks (Cut & Fill) 5.6 million m3 of cut and 4.4 million m3 of fill
•Granular sub base /Aggregate road base
•Asphalt pavements (Normal/Polymer PMB) and related tests 1.5 million tons asphalt
•Witnessing the friction test & surface Texture depth

Client at Ministry of Public Works
  • United Arab Emirates
  • to

Education

Bachelor's degree, Civil Engineering
  • at University of Engineering and TechnologyMinistry of Higher
  • January 1988

courses: I.T. SKILLS: MS Office AutoCAD PROFESSIONAL MEMBERSHIP: •MMUP Registration (Grade-A) •Member of Professional Institute (Pakistan Engineering Council –PEC), since Jan 1988, valid member ship. •Equivalency certificate

Specialties & Skills

BRIDGES
CUSTOMER RELATIONS
DATABASE MANAGEMENT SYSTEM
DIRECTING
MARKETING
MICROSOFT WORKS
PROGRESS
SUPERVISORY SKILLS
UTILITIES

Languages

English
Expert
Urdu
Expert

Training and Certifications

PMP (Certificate)
Date Attended:
December 2023