Navin Bajracharya, MEP Project Manager

Navin Bajracharya

MEP Project Manager

Allied vision electromechanical works

Location
United Arab Emirates - Sharjah
Education
Master's degree, Hydro–Technical construction
Experience
22 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :22 years, 9 Months

MEP Project Manager at Allied vision electromechanical works
  • United Arab Emirates - Dubai
  • September 2021 to October 2021

Worked for Expo 2020 couple of projects when crucial stage for handing over. Specially worked in Russian pavilion where following activities were mainly focused.
CCTV, WIFI, Access control, BMS, Fire Alaram, HVAC, .

MEP Project Manager at Emirates Falcon Electromechanical Company - Efeco
  • United Arab Emirates - Dubai
  • May 2018 to April 2020

Worked as MEP project manager in the uae most prestigious and iconic project Expo 2020 UAE pavilion. Project is falcon shape structure with wings can be operate open and close. Overall value of the project is near to 500 mln upon completion and 150mln for MEP only.

Senior MEP Construction Manager at Arabtec CCC JV
  • Kazakhstan
  • April 2014 to May 2018

Working as Sr. Construction Manager -MEP Since April, 2014 by Arabtec-CCC-JV (D&B Contractor) for the Abu Dhabi Plaza being constructed in the Capital City of Kazakhstan. The $1.6 billion mixed-use Commercial scheme which consist 382m High Central Asia's tallest tower. The project is scheduled for completion by the end of 2019.

MEP Project Manager at Catic the Chinese CompanyNovotel and Ibis Hotel Abu Dhabi-Sheikh Ahmed Bin Saif Bin Mohd Al Nahyan
  • United Arab Emirates - Abu Dhabi
  • May 2009 to March 2014

 Plan and monitor the construction progress, and provide periodic progress report.
 Liaise with clients at each stage of the work to ensure proper compliance with all technical aspects of the contract
 Review all engineering design drawings of the project before passing them for implementation.
 Review all the variation work and to comply as per the contract clauses.
 Review all the material submittals and to ensure it comply as per specification.
 To monitor all discipline and to coordinate with civil with all respect.
 Reviewed method statement and ITP
 Tracking and resolutions of non-conformances
 Discuss and resolve daily site problems with site teams.
 Ensure proper output in terms on quality and quantity of work, with safe working methods
 Supervise the implementation of health and safety procedures
 Ensure the premises are maintained to company standards

MEP client Representative at Dubai world trade centre
  • United Arab Emirates - Dubai
  • April 2008 to May 2009

 Review quality plan, , tracking and resolutions of non-conformances, assisting in drawing up a Project Execution Plan. Monitoring the output of the design consultant against their program and ensure all deliverables are met.
 Reviewed method statement and ITP Site supervisions, Ensure the Contractor’s compliance with the Contract Documents. Inspect all workmanship and material. Coordination with main and all sub-contractors. Documentation management of files, correspondence, records and designated forms. These records include all reports on work force, equipment, progress, safety, etc. Preparation of the daily, weekly and monthlyReports.Ensure activities, meeting, reviews, rectification measures, and accident reports are included in the Monthly Progress Report. Inspect safety conditions and inform the Contractor of construction safety violations and follow up action to be taken.

MEP Project Manager at Falcon Electro-Mechanical Construction Co. LLC in Dubai
  • United Arab Emirates - Dubai
  • July 2005 to April 2008

 Plan and monitor the construction progress, and provide periodic progress report
 Liaise with clients at each stage of the work to ensure proper compliance with all technical aspects of the contract
 Review all engineering design drawings of the project before passing them for implementation
 To monitor all discipline and to coordinate with civil with all respect.
 Assisting for procurement and commercial issues
 Reviewed method statement and ITP
 Tracking and resolutions of non-conformances
 Plan & mobilize the permanent material required for the proper completion of work on schedule
 Plan for the mobilization & demobilization of the personnel, equipment, & material from one project to another
 Discuss and resolve daily site problems with site teams.
 Ensure proper output in terms on quality and quantity of work, with safe working methods
 Supervise the implementation of health and safety procedures
 Ensure the premises are maintained to company standards

Senior Qty. surveyor at Saudi Archirodon
  • Saudi Arabia - Jeddah
  • May 2004 to May 2005

 The main responsibilities are preparation of quantities related to all kind of civil works and MEP works
 Submission of valuation to the client and submission of monthly report.
 Estimating the Value for Additional Work i.e. giving the Cost Analysis for the related

SR. Incharge For MEP Services at Micro tech M & E Limited
  • Nepal
  • September 2001 to May 2004

 Plan and monitor the construction progress, and provide periodic progress report
 Liaise with clients at each stage of the work to ensure proper compliance with all technical aspects of the contract
 Review all engineering design drawings of the project before passing them for implementation
 To monitor all discipline and to coordinate with civil with all respect.
 Assisting for procurement and commercial issues
 Supervision and Designing Pneumatic System Fire Fighting System, Rain Water Pipes, Drainage System, Storm Water Collection System, Sanitary.
 Testing and Commissioning of main Pumps and Jockey Pumps for Sprinkler, Hydrant and Pneumatic System.
 Preparing and Submitting of As Built Drawings and Operation Manual for Client, bill of quantities, progress report, Final close out documents
 Dealing with Consultant with all respects.

Project Incharge ( Plumbing& Fire Fighting) at Hitachi Plant- Binapuri Consortium
  • Nepal
  • September 1997 to September 2001

 Plan and monitor the construction progress, and provide periodic progress report
 Liaise with clients at each stage of the work to ensure proper compliance with all technical aspects of the contract
 Review all engineering design drawings of the project before passing them for implementation
 To monitor all discipline and to coordinate with civil with all respect.
 Assisting for procurement and commercial issues
 Supervision and Designing Pneumatic System , Fire Fighting System, Rain Water Pipes, Drainage System, Storm Water Collection System, Sanitary, Boiler System, Swimming Pool and Filtration Management and System corresponding with the Dosing System, LPG (Liquid Petroleum Gas) System
 Testing and Commissioning of main Pumps and Jockey Pumps for Sprinkler, Hydrant and Pneumatic System.
 Preparing and Submitting of As Built Drawings and Operation Manual for Client, bill of quantities, progress report, Final close out documents
 Dealing with Consultant with all respect.

Education

Master's degree, Hydro–Technical construction
  • at State Academy of water Management.
  • July 1997

Award with red diploma and get offer to continue for Phd.

Specialties & Skills

Leadership
Decision Making Skills
Ms word ,excell
Coordination

Languages

English
Expert
Hindi
Intermediate
Russian
Expert
Ukrainian
Intermediate

Memberships

- Member of Nepal Engineering Council – Kathmandu ,Nepal
  • membership only
  • December 1998
Member of Nepal Engineering Association
  • membership only
  • January 2000