Technical Support Engineer
Schlumberger - United Arab Emirates
Total years of experience :8 years, 9 Months
REMOTE OPERATIONS ENGINEER, OPERATIONS SUPPORT CENTER : UAE, IRAQ AND OMAN, December 2017 to May 2020 2019 onwards - steered five-month GFE project, including acting as asset coordinator workflow.
2017 - established and implemented remote geoservices in UAE and then Iraq.
Key Accomplishments:
• Coordinated all D&M, MWD, LWD, and GSS for UAE, Iraq, and Oman.
Dubai petroleum Co. Al Rashed Field .
Dubai petroleum Co. Fatih Field HPHT well.
DUBAI PETROLEUM CO. Jalilah bravo Field Batch drilling-offshore jack up Rig.Sep -Present...
- Abu Dhabi Marine Operating Company (ADMA-OPCO), SARB North island, ND-79_May_Sep 2015
- DUBAI PETROLEUM CO. Jalilah bravo Field Batch drilling-offshore jack up Rig.April-May2015.
- GAS ALHOSN SHAH Field Redevelopment well, land rig abu dhabi. Feb-April2015.
- Focal point for ADMA _Geoservices as Schlumberger co. & assist field service supervisor (FSS). Dec2014-Feb2015.
Drilling parameters, Hydrocarbon Logging & Analysis in Real time, Location was on-land; zubair, Rumalia and west qurna with a deviated Multi-well, Clients worked with are BP, ENI, Lukoil, .
Challenges, personal achievements and key skills in the Job:
- Manage & evaluate the geological data obtained by physical examination of drilled cuttings.
-Hydrocarbon (reservoir and source) data, from analysis of drilled gases and mud hydrocarbon content.
- Surface drilling data (including mechanical, hydraulic, and engineering parameters), to help maintain safety, balance formation fluid pressures, optimize the drilling process and control drilling costs.
- Down-hole drilling data; we integrate parameters from other sources, such as logging-while-drilling or electric logs which will complement the information we provide.
- provide the clients with the broadest possible picture to assist in critical decision making.
- Full reports were regularly submitted and the final well reports on time.
In charge of collecting, organizing and checking all documents related to drilling, development, geophysical logging and pumping tests operations... Site Drilling For Services &Well Drilling Company (SDC)_In field
Disi Mudawaraa To Amman Conveyance System Project
The aims are Drilling and completion of 55 production boreholes and 9 piezometer boreholes in order to supply additional water to Amman. The wellfield will produce an annual flow of 100 million cubic meters to be pumped through a pipeline to Amman.
تقديم خدمات مجانيه وتوزيع معونه للمحتاجين والايتام والارامل
Site Investigation & Geological Studies,
Very good
URL removed due to policy violation. Please contact support for further information.