CIVIL SITE ENGINEER
AL MUSAIRIE NATIONAL GEN.TRAD & CONT.CO JULY
Total years of experience :4 years, 3 Months
(MAIN CONTRACTOR - HANWHA)
PROJECT DETAILS: HALON PHASE OUT PROJECT AT MAA REFINERY
Handled (excavation, cable pulling, sand filling, tiles laying.
Duck bank installation, back filling, compaction, route mark fixing,
Mac Foundation installation.)
Interconnection pipe rack foundation ( pedestals, footing)
•Utilities pipe rack ( pedestals, footing)
•Disentrainment basin with box culvert and valve pit
•72’’ pipe valve pit
•OWL, CLS man hole.
•Excavation of OWS pipe line, fire fighting water line, CLS pipe line
•Electrical duck bank.
•Instrumentation duck bank.
•Grouting work
•Local pipe support, T- support, pipe sleeper foundation.
•Paving work
•Excavation, rebar work, formwork, concreting work, dewatering work.
•Pipe trench, cable trench
•Structural support, pre engineering structure and valve pit structure.
•KARTHIKEYAN BUILDERS IN TIRUPPUR MAY 2010 - AUG 2011.
6. DESIGNATION: CIVIL SITE ENGINEER
PROJECT: COMMERCIAL AND RESIDENTIAL BUILDING WORK
AND PIPE LINE. (Building construction, pipe line
CLIENT - KNPC
PROJECT DETAILS: MAINTENANCE PROJECT AT MAB REFINERY.
Replacement of IRT Pipe line, Replacement of temporary elevator foundation, Replacement of 12’’ HP Pipeline.
Handled (manual excavation, civil structure work, box culvert, retaining wall, reinforcement work, form work, foundation, demolition and installation of foundation, electrical & instrument cable trench, duck bank concreting & installation, pre cast concrete work, concrete repairing & painting work and etc.
• GULF WIND GEN.TRAD & CONT.CO
2. DESIGNATION: CIVIL SITE ENGINEER (2015 APIRL- JUNE 2016)
(MAIN CONTRACTOR - KCCEC.)
PROJECT DETAILS: MAINTENANCE PROJECT AT MAA REFINERY.
Handled (building maintenance, water proof tiles
Removing and fixing, interlock tiles fixing, concrete repairing work)