Kenya-Nairobi as Plant Manager (Workshop In charge)
Intex Construction Co Ltd
Total years of experience :14 years, 8 Months
Since May '2008 Intex Construction Co Ltd, Kenya-Nairobi as Plant Manager (Workshop In charge)
Notable Accomplishments
• Pivotal in managing maintenance of
➢ Heavy vehicles like Tata and Ashok Leyland tippers and Trailers, Articulated dump trucks (Caterpillars) Astra trucks Volvo FM-400 trucks and dumpers Cat-350E and Water tankers Handling light vehicles like Ford rangers and Isuzu and Nissan and Mitsubishi, Mahindra Boleros,
➢ Construction equipments like Concrete works Concrete pump make Greeves Cottonand, Schwingh Stetter Batching Plant, Transit Mixtures, Concrete Mixtures make Universal RM440, Self loaded Concrete mixtures make Davino, vibrators, bar bending machine, bar cutting machines make Sparton and Universal
➢ Earthwork machineries Bull dozers crawler type (Caterpillar D8 to D6 series dozers)
➢ Crawler Type Hydraulic Excavators (Hyndai305L and caterpillars CAT330L and 305L AND L&T PC-200, PC 90, PC 71)
➢ Vibration Rollers (Sany, Bomag, Ingersoll-Rand)
➢ Motor Graders (Caterpillars 14G, 140G, 140H, 12G and SANY make)
➢ Soil Stabilization Machineries (Bomag MPH-100, Caterpillar)
➢ Asphalt machineries like Bitumen Distributors and Pavers (Blauknox make) and PTR (Pneumatic Tyred Rollers make Dynapac C 30) and Chip spreaders and Steel Rollers
➢ 10MT-225MT cranes.
➢ Builders hoists of Erecting and Installation.
➢ Tower Cranes Static and Mobile (Zoomlion, Raymandi, Alpha, Ace Cranes) Batching Plants (Cp 30 Swing Stetter, Maxomix)
➢ Concrete Pumps (350D-swing stetter, HBT40c-Sany, BP 1800)
➢ Panel Boards, Site Lighting, Pumps and Motors
➢ Generators like Cummins 125 KVA, 82.5 KVA, and 62.5 KVA and KOEL SL 90 engines.
• Successfully implemented
➢ operational maintenance technics
➢ Implemented break down maintenance technique
• Efficiently introduced store maintenance system, documentation of fuel averages and consumption of fuel for all equipments monitoring.
• Received appreciation for the
➢ Erection of batching plant in 4-days
➢ Static tower crane (Zoomlion) Erection in 5-days completed
June, 2005-July, 2008:JMC-PORJECTSIndiaLtd., Hyderabad as a DY. Manager worked in High-raised (12stair buildings division (WIPRO, TCS, Reddy Labs Projects) worked in plant and machinery department as a regional head of the department maintained concrete machines and batching plants-cp 30, tower cranes static and mobile
April2004-June2005:GJ-Fernandez Construction. Co Ltd, Hyderabad as Sr. Mechanical Engineer (500MW Thermal power plant-Vijayawada Thermal power station phase III) worked in workshop division machinery maintenance like earth works machinery, concrete machinery and fabrication machines and works
May2002-March2004: Alfawzani Estd, Saudi Arabia-Riyad as Mechanical Engineer road construction company handled heavy equipments maintenance like Excavators PC-200 and PC 71 L&T KOMATSU, Bulldozers -Caterpillars, Road Rollers & Tippers.
Sept '98 to Apr '02 Gland Chemicals Private Limited as Maintenance In charge for Electrical and Mechanical
Notable Accomplishments
• Handled maintenance of
➢ Utilities like Boilers, Chilling Plants, Compressors, Nitrogen Plant, Cooling Towers, Rotating Equipments like Reactors, Centrifuges, Dryers and GLRs and their Gear Boxes.
➢ Panel Board maintenance and all Synchronous Motors.
➢ Generator Maintenance.
➢ Effluent Treatment Plant (ETP) and Waste Water Treatment Plant.
➢ Water Treatment Plant (DM Water and RO water)
• Managed formulation of equipment with capsules filling machines.
• Pivotal in handling
➢ Distillation columns solvent recovery plant (SRP) water distillation equipments.
➢ Plumbing work (pipe lines, fittings and design) and fabrication techniques.
• Successfully managed 3 project works in Synthetic drug plant and Effluent Treatment Plant (ETP), Heparin plant.
Previous Experience
Heat power Engineering in Mechanical Engineering