Ronald Rosell, ELECTRICAL COMMISSIONING ENGINEER

Ronald Rosell

ELECTRICAL COMMISSIONING ENGINEER

satorp

Location
Philippines
Education
Bachelor's degree, Electrical Engineering
Experience
26 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :26 years, 10 Months

ELECTRICAL COMMISSIONING ENGINEER at satorp
  • Saudi Arabia - Jubail
  • My current job since January 2012

➢ ELECTRICAL COMMISSIONING ENGINEER
Project: JERP-SATORP Jubail 2 Industrial City KSA
Jan 2012 to present
-Reviewed of Electrical pre-commissioning and commissioning procedures using TOTAL and Saudi Aramco Standards
-Witnessed Testing activities of Power Transformer (34.5/13.8/4.4/0.5 kV), HV/LV switchgear in all Substation, Lighting System, UPS and Battery (Gutor), Motors solo run and Cathodic protection.
-Reviewed of RFC and RFSU dossier using OPERCOM standard.
-Full Knowledge of Integrated Commissioning and Progress System (ICAPS)
-Approved ICAPS Electrical Test Sheets.
-Troubleshoots any problems that may arise in energized system using Load flow and approved ETAPS and protection studies.
-Witnessed no load test of 4.16 kV HV and LV motors
-Attended meeting as directed by commissioning manager
-Full knowledge of Total and Aramco Standard particular on Electrical System
-Full participation for Company safety standard
-Reviewed of applicable drawings and standards
-Responsible for Energization of subsystems under handover
-Witnessed walkdown on particular subsystem as part of pre-commissioning and commissioning.

ELECTRICAL ENGINEER at SIEMENS
  • Oman
  • June 2011 to December 2011

➢ ELECTRICAL ENGINEER
Project: Independent Power Plant (Barka 3)
June 2011 to Jan 2012
Siemens & GS Consortium

-Reviewed design drawings of 230 kV cable ductbank and trenches of power plant and supervised installation up to commissioning stage.
-Reviewed of design of combined cycle of Gas turbine Electrical System particular Insulated phase busduct (IPB) and 20kV /230kV step-up transformer (Hyusong) in Power plant.
-Reviewed of cable design sizing, voltage drop and revised if necessary
-Created Cable pulling card and presented to be used in the field.
-Reviewed of switchgear drawings and its protection scheme
-Design Cable boxes as required at site
-Made Method statement on each electrical installation and safety precautionary measures.
-Reviewed of cable tray Installation and routings
-Involved in preparation of Electrical commissioning stage
-Reviewed of construction and commissioning schedule
-Commissioned of power transformer, switchgear and UPS.
-Witnessed HV and LV motor no load test run.

ELECTRICAL COMMISSIONING ENGINEER at SPIE Oil & Gas UAE
  • United Arab Emirates - Abu Dhabi
  • March 2010 to January 2011

➢ March 2010 to Jan 2011: SNC/LAVALIN-SPIE Oil & Gas UAE
Project: Emirates Aluminium Smelter Complex (EMAL)
ELECTRICAL COMMISSIONING ENGINEER
Duties & Responsibilities: -Do Pre-operation verification of FTA-1-4 electrical/Instrument testing for electric valves, motors, breakers start-up in MCC and I/O Inputs for Allen Bradley modules using proper testing tools based on IEC standards and vendor documentation drawings.
-Check correct wiring layout related to latest vendor data and drawings.
-Do insulation resistance test of LV cables for motors and lightings.
-Start-up of all crane equipments in Furnish Tending assembly of aluminium smelter complex.
-Arranged manpower for critical jobs to be undertaken in FTA cranes
-Close-out disciplined deficiencies to meet milestones of the project.
-Carried out functional test of Instrument and controls of Furnace tending assembly cranes.
-Carried out test of HV and LV switchgear.

Electrical Engineer at CBI-TOYO JV
  • Singapore
  • February 2009 to November 2009

➢ February 1, 2009 to Nov 30, 2009: CBI-TOYO JV/Pulau Ular Singapore
Electrical Engineer
Project to Date: Shell ECC Process Area
Duties & Responsibilities: -Supervised underground and above ground cable pulling in trenches, substations and cable racks from 35KV, 6.6kV to 220V cables adhering to section drawings and plan layouts with latest revision.
-Supervised grounding installation in the plant and substation.
-Supervised lighting and power system installation and termination based on approved and latest drawings in the process area.
-Coordinated to implementation contractors (IC) regarding their Electrical activities and monitored work progress in accordance to their submitted work schedule.
-Do Testing of 6.6 kV switchgear -high potential test and insulation resistance test
-Do high potential and insulation resistance test of medium voltage and low voltage cable using specified voltage as per standard practice.
-Explained to subcontractor their responsibilities & scope of work that matters to their extent of work if conflict arises.
-Arranged electrical walkthrough schedule to the clients and QC for turn-over.
-Do tool box talk before work commences to prevent zero injuries thereby reaching 35 Million manhours without lose time injury.
-Monitored equipment/materials availability at the warehouse.
-Kept daily activity progress records & logs any problems that may exist for immediate action.
-Ensured electrical safety practices at site to meet zero injuries.
-Organised Shell or client electrical walkthrough and close-out punch items.
-Revised electrical drawings that may affect operations in the plant.
-Pre-commissioned 6.6 kV/400V Motors and Lightings in the plant after contruction completed.

Electrical Commissioning Supervisor at CTSD Limited
  • Russian Federation
  • January 2008 to January 2009

➢ Jan 27, 2008 to Jan 2009: CTSD Limited/Sakhalin Russia
Electrical Commissioning Supervisor
Project Completed: Shell OET/LNG EPC Plant - Sakhalin Russia
Duties & Responsibilities: -Supervised design of underground and above ground cables in process area.
- Do Functional test of 35kV/6.6 kV transformer (ABB) in utility area
-Gen-set testing of all cables incoming and outgoing
-Supervised and checked termination of all LV cables inside MCC before energization
-Supervised commissioning team for proper cable pulling and termination of CCTV system, PA/GA system and Telephone System including testing.
-Monitored solo run of motors, make reports and troubleshoot any problems that may arise.
-Attended coordination meeting with other discipline for matters to be clarified.
-Explained to subcontractor their responsibilities & scope of work that matters to their extent of work if conflict arises.
-Monitored equipment/materials availability at the warehouse.
-Kept daily activity progress records & logs any problems that may exist for immediate action in commissioning field and report to my immediate superior.
-Ensured safety practices for power start-up at site.
-Monitored commissioning work to make sure commissioning team complies with aspects of work in accordance with quality construction drawings & HSE requirements.
-Informed Group leader any electrical technical problems that may arise at site to avoid conflict in work schedule.
-Prepared electrical draft sketches if some modification works has to be done at site.

Electrical QA/QC Inspector at Kentech Sakhalin Technical Services
  • Russian Federation
  • September 2006 to December 2007

➢ Sept 2006 ~ Dec. 2007: Kentech Sakhalin Technical Services/Russia
Electrical QA/QC Inspector
Duties & Responsibilities: -Write Quality Control Record (QCR) for HV (33KV/6.6 kV) /LV (400/200V) cables, equipment, motors by referring to ITP for the daily Inspection of the day
-Attended daily inspection together with CTSD and SEIC company
-Inspected cables after termination and instructed laboratory personnel for testing
-Updated Quality Control Record (QCR) report daily
-Make sure that the inspected electrical works have been completed and no punchlist to be made before presenting to client.
-Inspected switchgear and panel installation including testing.
-Inspected HV cable termination in Utility, OET, Jetty, Process Area and substations.
-Made punchlist for submitted RFI's from construction.

(a) Senior Electrical Designer at Chiyoda Corporation/Pasig City Philippines
  • Philippines
  • January 2006 to September 2006

➢ Jan 2006 ~Sept. 2006: Chiyoda Corporation/Pasig City Philippines
Assigned in Local and Abroad and with following position: a) Senior Electrical Designer
Project Involved: RGX TRAIN-6 & 7/ RGX-WWT
Duties & Responsibilities: -Do design calculations for lighting illumination, cable sizing and voltage drop, cable tray sizing, and HV and LV duct bank / cable trench configuration and section layouts.
-Prepared preliminary design drawings for single line diagram, lighting, power, earthing, substation, cable tray and hazardous area classification based on the latest design standards.
-Do material take-off for lighting layout, power wiring, cable tray and earthing layout and prepared bill of materials.
-Checked and reviewed deliverable drawings for quality and accuracy of electrical design based on international codes and standards.
-Smart Plant Review (SPR) of the electrical equipment Location.
-In-charge of Chiyoda General Project; RGX-WWT and MTO
-Checking CAD works made by Junior Designer
-Coordinated directly with the foreign client and other design disciplines regarding project design matters and issues.
-Prepared weekly and monthly reports detailing the project design status, progress and consumed man-hour
-Scoping and preparing of design deliverables for oil and gas production electrical facilities through development of cost, time and resource sheets.
-Provide site support and technical assistance for the entire project life cycle, of construction, hook-up and commissioning of the electrical facilities in all work and site environments.
-Interface with vendors to review technical submissions and manage equipment interfaces.
-Work to review existing electrical systems for adequacy of design. Perform detailed design of electrical modifications, as required.

(b) Electrical Site Supervisor (Qatar at CHIYODA
  • Qatar
  • November 2002 to December 2005

➢ Nov. 2002 ~Dec. 2005: CHIYODA, MITSUI & SNAMPROGETTI (CMS&A) /Qatar
b) Electrical Site Supervisor (Qatar)
(Ras Gas Process Train-3/4/5, Helium 1-2-3-4, Train-5) & Al-Kaleej Gas Plant /AKG-1 (Exxon Mobil company)
Duties & Responsibilities: -Supervised underground and above ground HV and LV cable pulling and stub-up using cable pulling card by measuring actual length compared to estimated length from section layouts and routing plans.
-Supervised UPS and battery installation in FAR area including battery checked discharge and charging test. Report any damaged of batteries and recommend for replacement.
-Supervised proper Installation of switchgear, power transformers, busducts, Harmonic filters and Low voltage MCC inside substation.
-Arranged electrical work schedule-installation/termination and implement in the field inorder to reach milestones of the project.
-Responsible for proper glanding, termination and testing of all cables in process area from 6.6kV to 440V-230V.
-Supervised and verify all components & checked ductor test of Medium and low voltage switchgear and MCC (Siemens, Toshiba and ABB) equipment and Busduct (LG Busduct, Toshiba) before start-up and energization.
-Monitor solo run of Motors, make reports and troubleshoots any problems that may arise.
-Checked Insulation Resistance Test of cables and transformers based on QC test result and acceptance value and report any damaged cables-replaced if necessary to my superior for proper action.
-Review and attended high-potential test of all Medium Voltage Cables and motors.
-Commissioning of lighting system in process area.
-Supervised and verify all parts and system of 33KV/6.6KV Transformer (ABB, Pauwels, Toshiba & ASI Robicon), before oil filling and purification after proceeding testing which includes meggering, vector group test and function test.
-Do energization of electrical Heat Tracing.
-Established and prepared a monitoring system in excel format for the progress of the plant project related to electrical works.
-Do Energization of Cathodic Protection in plant after all testing completed
-Report to my superior the daily progress of electrical commissioning in the plant.
-Arranged necessary electrical materials for the project completion that were not been taken into consideration during the design stage.
-Coordinated area of concern to all disciplines in meetings and discussed on how to solve the relevant issues of the week.
-Arranged for closing electrical punchlist items made by client.
-Work to ensure that the client's Management of Change policy is maintained and that all work is carried out in accordance with departmental procedures.
-Participated in interface meetings with design, construction and operations.

Design Engineer at C&E Philippines/Pasig City Philippines
  • Philippines
  • March 2002 to November 2002

➢ Mar. 2002 ~Nov. 2002: C&E Philippines/Pasig City Philippines
c) Design Engineer
Duties & Responsibilities: -Provided electrical engineering detailed design of LNG Process Train-3 Ras Gas Onshore expansion project in Qatar
-Made calculation design for power cables, MTO of Power Cables and Earthing system.
-Prepared marked up drawings for power wiring.
-Prepared design of earthing system and stub-up.
-Made material take-off (MTO) using Company standards for power, earthing, stub-up and lighting system.

QC Phil at People's Asia Pacific Construction Corporation
  • Philippines
  • January 2001 to March 2002

➢ Jan .2001~March 2002: People's Asia Pacific Construction Corporation/QC Phil.
Design Engineer
Project Involved: Rehabilitation of Caliraya-Botocan Hydro-power plant)
Duties & Responsibilities: -Made complete design and calculation of cable tray for Hydro power plant project
-Made complete design and calculation of lighting system of power plant.
-Made complete design and calculation of the overhead transmission of the plant
-Made Design of substation system: grounding system, cable schedule and electrical distribution arrangement

Design and Estimate Engineer at Sumisetsu Philippines/Makati City Philippines
  • Philippines
  • February 2000 to January 2001

➢ Feb 2000 ~Jan. 2001: Sumisetsu Philippines/Makati City Philippines
Design and Estimate Engineer
Project Involved: Texas Instrument, Industrial Bldg both local & international project.
Duties & Responsibilities: -Made design of several electrical industrial project by preparing drawings, single line diagram, load computation, layout design of lighting, power, telephone system, paging system, clean room system and fire alarm or CCTV system
-Made detailed electrical estimation & cost estimation of project and discussed it to our client and proceeded for bidding evaluation.Won projects were transffered to construction department.
-Prepared plans, specifications, cost estimates and budgets for electrical construction projects.
-Checked and reviewed electrical plans done by subordinate electrical engineers and those submitted by electrical contractors

Design Engineer at Audion Electric Company/Quezon City Philippines
  • Philippines
  • December 1997 to February 2000

➢ Dec 1997~Feb 2000: Audion Electric Company/Quezon City Philippines
Project Involved: 26-storey bldg (Torre Lorenzo), 42-storey bldg (Mega Plaza), 48-storey bldg. (Pasong Tamo Tower), De la Salle University School bldg. & various high rise buildings.
Design Engineer
Duties & Responsibilities: -Design and cost estimation of high rise building project by providing complete electrical system for electrical load computation, power and lighting system layout, single line diagram, CCTV system, Telephone system, & Fire Alarm system.
-Made detailed breakdown estimates of electrical system including cost for bidding and construction of the projects.
-Supervised the completion of 42-storey building by applying standards (PEC and NEC) of proper installation, wiring and power-up of the project.
-Checked and reviewed electrical plans done by subordinate electrical engineers and those submitted by electrical contractors.
-Acted as project inspector insuring that the electrical works are in accordance with the approved plans and specifications.
-Evaluated and assessed the on-going projects and report to management the project status.

Electrical Engineer at Transient Electric Company/Quezon City
  • Philippines
  • November 1997 to December 1997

➢ Nov. 1997~Dec 1997:Transient Electric Company/Quezon City, Philippines
Electrical Engineer
Project Involved: WYETH Philippines industrial building.
Duties & Responsibilities: -Checked and analysed electrical plans, specifications and shop drawings.
-Design of Lighting, power system & communication system including bid estimates.

Electrician at Distajo Engineering Firm/ Roxas City Philippines
  • Philippines
  • June 1996 to March 1997

➢ June 1996~March 1997: Distajo Engineering Firm/ Roxas City Philippines
Electrician (Part time and on the job training)
Duties & Responsibilities: -Works as an electrician: doing roughing-ins, cable laying and termination for various housing units.

Education

Bachelor's degree, Electrical Engineering
  • at University of CPC
  • March 1997

1992-1997 University of CPC

High school or equivalent, Mathematics
  • at Colegio dela Purisima Concepcion
  • March 1992

1988-1992 Colegio dela Purisima Concepcion Secondary

High school or equivalent, English
  • at Manuel Arnaldo Memorial School
  • April 1988

1982-1988 Manuel Arnaldo Memorial School Elementary

Specialties & Skills

Languages

English
Intermediate
Tagalog
Expert

Memberships

IIEE
  • Active
  • October 1997

Training and Certifications

Certificate of Supervisory (Certificate)
Date Attended:
February 2009
Valid Until:
February 2009