Safiueddin Abdulhady Elsayed Mohamed Safiueddin, senior structural engineer

Safiueddin Abdulhady Elsayed Mohamed Safiueddin

senior structural engineer

SAUDI OGER LTD

Location
Saudi Arabia - Riyadh
Education
Master's degree, civil engineering -structural department
Experience
28 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :28 years, 9 Months

senior structural engineer at SAUDI OGER LTD
  • Saudi Arabia - Jeddah
  • April 2008 to January 2017

Leading a technical team, to manage all activities related to the construction documents and to facilitate the work on site.
The work includes also coordination with the international consultants, reviewing shop drawings, materials submittals and following the site needs and progress

1-Reviewing all the design and shop drawings of reinforced concrete and steel structure

2-Technical support for solving all site problems during construction phase for both of steel structure and reinforced concrete.

3-Check all the fabricated (dimensions - numbering) items in the factory before dispatching to site and reviewing the quantities with the material order.

4 -Achieve the structural studying of as built existing building to modify the building usage and MEP requirements and prepare the design drawings and calculation sheet for the modified elements.

5- prepare method statements for applying different methods to repair reinforced concrete such as (flat slabs - columns - beams).
6-Prepare design drawings and structure calculation sheets to assure the safety of building after completing the renovation activities.
7- leading team members to prepare BOQ of KAP-01 of MOI of Saudi kingdom and required drawings of poly lines to facilitate Quantity surveying

area construction manager at SIAC
  • Egypt - Cairo
  • May 2007 to March 2008

Responsibility: construction manager (B) - area manager \nMain activities : Construction of phase (І) of Southern Vally cement Factory at Beni Swif -upper Egypt, which contain cement mill, 3 cement silos with total height 60 ms, clinker silos, packing plant building and Electrical Substation generation buildings, belt conveyor, . Position: Area manager with responsibility of construction, management, cost analysis, time schedule, and shop drawings details, prepare of bar bending scheduale

site engineer - project engineer -project manager - projects manager at EGYCO - ElNasr for Building & construction
  • Egypt
  • May 1988 to April 2007

Projects
1- Period from (May 2006 to April 2007)
projects manager of Sewage projects of northern villages of Tanta -Gharbeia - EGYPT.
2- Period from (June 2005 to May 2006)
project manager of The trial project for Egyptian village (Fesha Sleem - Tanta Gharbeia -Egypt).
3-Peiod from (Sep. 1998 to May 2005)
project manager of Ganzour sewage project: the project consists of
a- sewage treatment plant consists of inlet structure, grit removal, Aeration tank, settling tanks including raft foundation under deep well dewatering system, concentration tank, chlorine tank, drying beds, pipe connection between the units of plant, internal pump station, bypass and drainage lines, channels, and piping connection between tanks, all protection against leakage of water.
b- Two lift pump stations.
c- Ductile iron forced pipes 300 mm &500 mm.
4-Period from (Dec. 1994 to Aug.1998)
Consultant supervisor Resident engineer: Consultant Company (Gulf Group for consulting engineering) - Damam - Eastern area - Saudi Arabia Al-Hasa sewage plant, lift stations and main forced pipes: the main plant consists of inlet structure, grit removal, 4 Aeration tank, 8 settling tanks and their foundation, sludge pump station, internal pump station, dewatering building, polymer building, administration building, drainage line, piping net connection between tanks, chlorine tank and drying beds. the job responsibility including supervising of Earth moving, construction of the previous structure, all protection against leakage and chemical attack, piping connection between tanks. the aeration tanks were designed including expansion and contraction Joint, but settling tank were designed including construction joint.
5-Period from (May. 1994 to Dec.1994)
project Manager of sewer network pipelines in Queessna -Menufyia-EGYPT
a- Four lift pump stations
b- Ductile iron forced pipes 300 mm & 500 mm
c- sewer pipe lines and manholes of 42 km for different diameter (175 - 900) mm
5-Period from (June. 1993 to April.1994)
project Manager of Sheben El koom sewage project, . Contractor Company: Construction and remolded of forced pipe line and sanitary infrastructural. Concrete Repair for lift station No: 4 and its super structure building. Concrete floor slab for internal roads and facilities.
6- Period Oct. 1992 - May 1993
Resident Site Engineer: (ELNSR for building and constructions) - El-Gabal El-Asfar sewage plant:
7- Period May 1991 - Oct. 1992.
project Manager of sewage plants of Queessna -Menufyia-EGYPT
a- Earth moving.
b- The fence of the plant consists of reinforced concrete Retaining wall up to 7ms height and masonry wall,
c- sewage treatment plant(10000 m3) consists of inlet structure, grit removal, Aeration tank, settling tanks including raft foundation under deep well dewatering system, concentration tank, chlorine tank, drying beds, pipe connection between the units of plant, internal pump station, by-pass and drainage lines, channels, and piping connection between tanks, all protection against leakage of water.
8-Period April 1991 - may 1991
Site engineer: (ELNSR for building and constructions)Sheben El-koum sewer lines net
9- Period Dec. 1990 - April 1991.
Site Engineer: (ELNSR for building and constructions) - El-Gabal El-Asfar sewage plant: preparing the site, apply leveling of site, remove the old building and build the offices and required utilities(patch plant, bridges to facilitate access to site .
10- Period May 1988 - Dec. 1990.
site engineer at Sheben El koum sewage project, : (ELNSR for building and constructions)
Sheben El-koum sewage plant : fence of the project consists of brick wall with repeated unit 13.25 ms, Earth moving, supervising and Construction of inlet structure, grit removal, 4 primary settling tanks and their distributor unit, 4 high trickling tank and their distributor unit, 2 concentration tanks, drying beds, and the internal roads .

Education

Master's degree, civil engineering -structural department
  • at Faculty of Engineering -Menoufiya University, Egypt, 2005.
  • March 2005

M.Sc. thesis supervised by: Prof. Dr. Abdul-Fattah Yousef (Professors of Geotechnical Engineering-Faculty of Engineering-Menufyia University) and Dr. Basuony El-Garhy (Associated Professors of Geotechnical Engineering-Faculty of Engineering- Menufyia University). • During my work towards my M.Sc. Degree from October 1998 to 2005, I passed successfully seven graduate courses (Advanced Steel structure, theory of plasticity, Finite element analysis, advanced testing of products and Structures, Special reinforced concrete structures, Underground structures, and Advanced Soil mechanics. • I carried out a thesis entitled “Settlement Analysis of Free-Standing Piled Raft Foundations".

Bachelor's degree, Civil Engineering
  • at Engineering College-Alexandria UNI.
  • June 1985

i have general civil engineering from Alexandria university and the project in marine port engineering .

Specialties & Skills

Construction Methods
Engineering Drawings
Construction Drawings
On site Support
Civil Engineering
construction and site managements
TEKLA -Structural detailing program

Languages

English
Intermediate
Arabic
Expert

Memberships

EGYPTIAN Engineering syndicate of Civil Engineers
  • • Member of EGYPTIAN Engineering syndicate of Civil Engineers
  • July 1985
SAUDI COUNCIL OF ENGINEERING
  • 114802 - Consultant
  • February 2013

Training and Certifications

Diploma of Buissness Adminstraiton , Faculty of commerce, Tanta University, Egypt, 2006. (Certificate)
Date Attended:
September 2006
Valid Until:
September 2020
CONTRACT MANAGEMENT - FIDIC (Training)
Training Institute:
HRPCentre- Human Resource Professional Training Centre
Date Attended:
January 2016
Duration:
30 hours
Training Program of LEED MODULE (Training)
Training Institute:
Saudi Oger -Centeral Region
Date Attended:
November 2014
Duration:
8 hours
SCAFOLDING SAFETY COURSE 29 CFR 1926.450 OSHA (Training)
Training Institute:
SIAC -INdusterial Construction &Engineering
Date Attended:
December 2007
Duration:
8 hours
Tekla Structure -V15.00 (Training)
Training Institute:
Advnced Training
Date Attended:
December 2009
Duration:
42 hours
\Tekla structure -V15.00 Steel Basic Training (Training)
Training Institute:
Tekla
Date Attended:
November 2009
Duration:
42 hours
Ready to PMP exam (Certificate)
Date Attended:
January 2010
Valid Until:
March 2010

Hobbies

  • Reading :travelling