Emad Samy Abdl Lateef, Planning Manager

Emad Samy Abdl Lateef

Planning Manager

Arabtec

Location
Egypt - Cairo
Education
Bachelor's degree, Civil Engineering, Structural department
Experience
18 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :18 years, 8 Months

Planning Manager at Arabtec
  • Qatar - Doha
  • July 2015 to April 2016

• Attend the progress & Planning meetings with Consultant & Client representatives.
• Preparing progress analysis reports.
• Developing construction Look-ahead so as to control the construction progress.
• Compiling and Following up progress on site & updating the construction program.
• Developing detailed construction schedules that include all trades, structural, ME and finishing activities as well as the utilities.
• Developing Resources & Cost loaded detailed baseline programs.
• Developing Manpower histograms.
• Developing Engineering & Material procurement schedule.
• Preparing S-curves and Cash flow charts.
• Preparing Time Impact analysis for claims Support.
• Prepare Recovery plans and Revised programs.
• Analyzing Progress with Earned value performance measurement method.
• Prepare cost control reports (Earned Value P.M.)
• Monitor the daily/weekly construction plan.
• Preparing Daily/weekly/Monthly reports (Time & Cost).

Project Controls Manager at Hill International
  • Saudi Arabia
  • April 2012 to January 2015

Preparing progress analysis reports.
Developing construction Look-ahead so as to control the construction progress.
Compiling and Following up progress on site & updating the construction program.
Developing detailed construction schedules that include all trades, structural, ME and finishing activities as well as the utilities.
Developing Resources & Cost loaded detailed baseline programs.
Developing Manpower histograms.
Developing Engineering & Material procurement schedule.
Preparing S-curves and Cash flow charts.
Preparing Time Impact analysis for claims Support.
Prepare Recovery plans and Revised programs.
Analyzing Progress with Earned value performance measurement method.
Prepare cost control reports (Earned Value P.M.)
Monitor the daily/weekly construction plan.
Preparing Daily/weekly/Monthly reports (Time & Cost).
Analysis of scheduling discrepancies for argumentation.

Planning Manager at ATKINS/ F+G In
  • Saudi Arabia
  • January 2011 to August 2012

Developing detailed construction schedules that include all trades, structural, ME and finishing activities as well as the utilities.
Developing Resources & Cost loaded detailed baseline programs.
Developing construction Look-ahead so as to control the construction progress.
Compiling and Following up progress on site & updating the construction program.
Developing Manpower histograms.
Developing Engineering & Material procurement schedule.
Preparing S-curves and Cash flow charts.
Preparing Time Impact analysis for claims Support.
Prepare Recovery plans and Revised programs.
Analyzing Progress with Earned value performance measurement method.
Prepare cost control reports (Earned Value P.M.)
Monitor the daily/weekly construction plan.
Preparing Daily/weekly/Monthly reports (Time & Cost).
Analysis of scheduling discrepancies for argumentation.
Preparing progress analysis reports.

Planning Manager at MAK & Sons (Kharafi Group)
  • United Arab Emirates - Dubai
  • May 2007 to December 2009

Developing Tender Programs.
Developing detailed construction schedules that include all planning, structural, ME and finishing activities.
Developing Resources & Cost loaded detailed baseline programs.
Developing construction Lookaheads so as to control the construction progress.
Compiling and Following up progress on site & updating the construction program.
Developing Manpower histograms.
Developing Engineering & Material procurement schedule.
Preparing S-curves and Cash flow charts.
Preparing Time Impact analysis for claims Support.
Prepare Recovery plans and Revised programs.
Analysing Progress with Earned value performance measurment method.
Monitor the daily/weekly construction plan.
Control the daily construction process of the subcontractors.
Preparing Daily/weekly/Monthly reports for the Engineer.
Analysis of scheduling discrepancies for argumentation.
Preparing progress analysis reports.
Holding planning meetings with all involved subcontractors to follow up the progress on site and to adress and resolve the outstanding issues if there any.

Planning Manager at Port Ghalib Resorts (AL Kharafi Group)
  • April 2005 to December 2006

on a Core Project which consists of many areas like:
1- Harbour Master Building
Diving Village
3 Hotels (5 stars) + Casino
Corniche Area
International Conference Center
Roads Network & Utilities
External works including landscape and water features
My duties involved :
Claims analysis and evaluation (Time impact analysis).
Issuing all the correspondences with regards to the planning, following up the progress and the claims as well.
Preparing detailed (Design, Procurement and Construction) schedule for the running Projects.
Preparing the Master Schedule for the overall area.
Involved developing a detailed analysis of the programme data on Primavera software including resources and costs and rejecting them where necessary and requiring the programmes to be resubmitted with advised corrections made.

I also undertook the responsibility to monitor the Contractor’s progress
against these programmes and make monthly reports for the owner stating the progress as well as giving other information.

Holding planning meetings with subcontractors and section managers.

Following up progress and updating the detailed schedules .

Issuing performance reports during the construction phase.

Issuing the monthly progress reports for the management and the client as well.

I assisted in preparing and reviewing the Consulting Engineer’s progress Payments.

Senior Planning Engineer at Port Ghalib / Costain Int.
  • Egypt - Cairo
  • April 2004 to April 2005

Working on a Core Project which consists of many areas like:
Harbour Master Building
Diving Village
3 Hotels (5 stars) + Casino
Corniche Area
Roads Network & Utilities
The work was designed by international designers and constructed by internationl Contractors
My duties involved :
Preparing detailed (Design, Procurement and Construction) schedule for each Project.
Preparing the Master Schedule for the overall area (Marina Village) & surrounding Roads.


Reviewing the programmes submitted by the contractors for approval.

Involved making a detailed analysis of the programme data on Primavera software including resources and costs and rejecting them where necessary and requiring the programmes to be resubmitted with advised corrections made.

I also undertook the responsibility to monitor the Contractor’s progress against these programmes and make monthly reports for the owner stating the progress as well as giving other information.

Holding planning meetings with contractors and section managers.

Following up progress and updating the detailed schedules .

Issuing the monthly progress reports.

I assisted in preparing and reviewing the Consulting Engineer’s progress Payments.

Sr. Planning Engineer at TURNER PROJACS INTERNATIONAL
  • June 2001 to April 2004

Currently working on a Marina Village which consists of many areas like:
Harbour Master Building
Diving Village
Souk & Entertaiment Islands
3 Hotels (5 stars) + Casino
The work was designed by international designers and constructed by internationl Contractors
My duties involved :
Preparing detailed (Design, Procurement and Construction) schedule for each Project.
Preparing the Master Schedule for the overall area (Marina Village).

Assisting in the preparation of Tender Documents.

reviewing the programmes submitted by the contractors for approval.

Involved making a detailed analysis of the programme data on Primavera software including resources and costs and rejecting them where necessary and requiring the programmes to be resubmitted with advised corrections made.

I also undertook the responsibility to monitor the Contractor’s progress against these programmes and make monthly reports for the owner stating the progress as well as giving other information.

I assisted in preparing and reviewing the Consulting Engineer’s progress Payments.

Engineer at BECHTEL INT. Co. , Ltd
  • February 2000 to February 2001

Currently working on an International Marina on the Red Sea Coast to take over 1000 boats, Power Generation Plant, Sewage treatment plant and Water desalination plant.
The work was designed by international designers and constructed by internationl Contractors
My duties involved reviewing the programmes submitted by the contractors for approval
Involved making a detailed analysis of the programme data on Primavera software including resources and costs and rejecting them where necessary and requiring the programmes to be resubmitted with advised corrections made.
I also undertook the responsibility to monitor the Contractor’s progress against these programmes and make monthly reports for the owner stating the progress as well as giving other information.
I assisted in preparing and reviewing the Consulting Engineer’s progress Payments.

Construction Management at EMAK Marsa Alam for Tourist Development and Urban Investmen
  • Egypt
  • November 1998 to January 2000

Work included: Coordinating work of Consultants, Engineers, Architects,
Urban planners, site investigators and environmental aspects.

Overseeing Marsa Alam airport design and proposal for new international airport - runway, terminal building, utilities and facilities.
Overseeing and reviewing concept design for Port Ghalib Int. Marina \{Sogreah Consultancy (France)\}
Preparing request for proposal and contracts for marina design and supervision, and for urban planning and landscaping design for
new resorts (EDAW Consultancy)

Planning /Scheduling Engineer : (Marsa Alam Int. Airport)
Liasing with consultants; general meetings; correspondences... etc
Supervising and coordinating Bechtel’s work for both the marina and urban planning.

supervision Engineer at EgyptAir
  • Egypt
  • November 1996 to November 1998

Work included: Extension of Sharm El Sheik Airport, Tax free building, and Transportation Garage (concrete arched frames

Design Engineer at Crown Home Consultancy
  • Egypt
  • May 1998 to November 1998

Infrastructure design of tourist villages in Sharm El Sheik,
Hurghada, and El Ain El Sokhna, and preparing tender documents.

Geotechnical Engineer at Rehab City Project
  • Egypt
  • November 1996 to April 1998
Design Engineer at Dr. Hassan Osman Consultancy
  • Egypt
  • May 1996 to October 1996

Work included: Design of several types of structures

supervision Engineer
  • Egypt
  • September 1995 to September 1996

Work included: transformer factory (Concrete Frames), huge
transformers foundations.

Education

Bachelor's degree, Civil Engineering, Structural department
  • at Ain Shams UniversityAin Shams University
  • May 1995

courses: Completed the preparatory course for the PMP (Project Management Professional). PMP aspirant.

Specialties & Skills

Claims Administration
Project Control
Primavera P6
Schedule Analysis
Reporting
Project Controls
P6 V8.3
Earned Value PM
4D Simulation
XER analysis

Languages

Arabic
Expert
English
Expert

Memberships

PMI/COS
  • 2006
  • June 2006

Hobbies

  • 3D Modelling, Visualization & BIM