Duties/Responsibilities: Department: Mechanical Duties/Responsibilities: PROJECT NAME: First Track Project (Brown Field Project) : Design, Engineering, Procurement, Supply, Installation, Commissioning & Testing of Two (2) Nos. Glycol Dehydration Type Gas Process Plant (75 MMSCFD capacity each) at two different locations including Four (4) separate 6 inch Nominal dia. Gas Gathering Pipelines (approximate length of one no. 2500 meter, one no.1000 meter and two nos. 500 meter each) and associated facilities on Turn-Key Basis at Titas Gas Field, Brahmanbaria, Bangladesh by Pietro Fiorentini SpA, Italy Responsibility : civil design/engineering & civil construction of generator buildings, piling works, equipment/ tower/skids/tank foundations, road, walkways, pavement, fencing, surface drainage system; construction of 4 (four) pipelines from wellheads to two process plants including roads & khal crossing and all other associated works; erection/installation of skids/vessels & equipment; field interconnecting piping works; tank construction; NDT of all field welding works; electrical/instrumentation works; testing & commissioning assistance and construction/installation of other functionally required auxiliaries viz, power generating facilities, yard lighting facilities, fire fighting & hydrant system, fire detection system etc. Test run of both plants successfully completed. PROJECT NAME: Titas 17 & 18 Project(Green Field Project) : Design, Engineering, Procurement, Supply, Installation, Testing & Commissioning of 1x75 MMSCFD capacity Glycol Dehydration Type Gas Process Plant and Gas Gathering Pipe Lines with Associated Facilities on Turnkey Basis at Titas Gas Field, Brahmanbaria, Bangladesh under Bangladesh Gas Fields Company Ltd (BGFCL) by Pietro Fiorentini SpA, Italy Responsibility : civil design/engineering & civil construction of operation, workshop & generator buildings, piling works, equipment/tower/skids/tank foundations, road, walkways, pavement, fencing, surface drainage system; construction of 2x3500 meter high pressure cross country gas pipelines i/c river crossing by HDD method & all other associated works; erection/installation of skids/vessels & equipment; field interconnecting piping works; tank construction; NDT of all field welding works; electrical/instrumentation works; testing & commissioning assistance and construction/ installation of other functionally required auxiliaries viz, power generating facilities, yard lighting facilities, fire fighting & hydrant systems, fire detection system etc. Present Condition: Successfully completed all works with test run of the plant and handed over to BGFCL. PAC issued and one year warranty of the plant was completed on 11 October 2014.
On this plant I personally solved one major problem. As this is green field project, plant getting shutdown when there was any lighting with thunder storm. Though we installed all lightening protection system that design and supplied by Italy, we were unable to continuous running on time of rain with lightning and thunder storm. I personally installed earthling system at four different point with 40 mm dia and 60 feet length(deep) GI pipe on different place and connected with grounding grid. One point is near to Flare and other three points are on process plant area. After that plant never stopped for any raining time with or without lightning and thunder storm. Additional Activities on SUNNEX : Participating on Government Tender process on several power plant projects(Combine Cycle and coal base power plants)
- Company industry:
- Mechanical Engineering