Project Engineer-Piping
Alucor Ltd
Total years of experience :12 years, 6 Months
• Result-oriented professional with over 7 years of experience in Mechanical Piping, Erection, assisting for commissioning, Installation of static &rotary equipment’s, Client Relationship Management, Material Requisition and Team Management
• Currently associated with ALUCOR Ltd as Project Engineer in Al Taweela Alumina Refinery Project
• Expertise in construction of piping fabrication as per the drawing and follow the orientation
• Pivotal in managing entire structural construction with erection, resource planning, team building, co-ordination with internal/ external departments and arrange client inspections
• Skilled in pipe spool erection and installation of manual and control valve’s
• Swift execution of time bounded projects with competent cross-functional skills within the cost parameters
• Proficient in material management as per client specification
• Efficient organizer, motivator, team player and a decisive leader with the skill to motivate teams to excel and win
Ensuring that all the Fire Fighting installation is carried out with specifications, statutory requirements, laws, rules, regulations and other contractual requirements.. With due regards to safety, operability and maintainability
Responsibilities:
• Managing projects from conception, pre-production through to completion.
• Providing technical support to the project team.
• Discuss with client and management for requirement gathering and creating the specification documents
• BOQ preparations of mini projects.
• Preparation of quotations, variations, substantiations and running bills of concerned projects.
• Responsible for overseeing the review, initiation and execution of contracts.
• Responsible for the coordination of workers in different sites.
• Managing project budgets and keeping costs down.
• Keeping track of As built documents for smooth handover of the project.
• Attending the client meeting, representing the firm.
• Ensuring safety and quality as per company standards.
• Preparation of daily, weekly and monthly reports.
I have done all piping in Gas plant inlcluding under ground piping(GRE), Chilled water piping, Vessel piping, pump room connections, fire fighting piping .
Project:SGD project-Abu dhabi
Responsibilities:
• Coordinate other issues with our Site Construction Manager, Technical Engineer, Document Controller, QA/QC, QS and Procurement.
• Coordinates work with Drafters, Designers.
• Ensuring all materials used and work performed are as per specifications;
• Overseeing the selection and requisition of materials;
• Liaising with the local authority to ensure compliance with local construction regulations and bylaws;
• Day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors;
• Overseeing quality control, health and safety matters on site;
• Preparing reports as required;
• Resolving any unexpected technical difficulties, and other problems that may arise.
• Ensures that all site works are done according to all applicable quality standards.
• Ensuring use of latest approved shop drawings for construction at project sites.
• Ensuring inspection of material received at site after receipt
Maintenance of pipe lines in various machines
• Carried out scheduled maintenance, shut down& break down maintenance.
• Conducted repeat repair analysis by why-why method
4 year Bachelor Engineering degree ,specialized in Mechanical Engineering from the well reputed university of India successfully completed in the year of 2010.