Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Vijay Pitchai, SENIOR PIPING /PIPELINE ENGINEER

Vijay Pitchai

SENIOR PIPING /PIPELINE ENGINEER·SAUDI ARAMCO SMP Contractor

Saudi Arabia

Master's degree, general management

Work experience

Total years of experience: 18 years, 6 months

SENIOR PIPING /PIPELINE ENGINEER

December 2018 - Present

SAUDI ARAMCO SMP Contractor

Eastern Province, Saudi Arabia

December 2018 - Present

of skids including metering skids, chemical injection skids, CRYO, DEHY skids etc.
•Construction engineering support relating to preparation of as-built drawings, equipment handover packages, pipe hydro-test packs, construction check sheets, punch list closure etc.
•Review plant 3D model from design, accessibility, Maintainability and constructability perspective.
•Pipe wall thickness calculation for internal and external pressure conditions, branch reinforcement calculations
• Check adequate flexibility of non-critical lines using Nomo-graphs, simplified procedures
•Prepare the required Man-hour estimate for the project scope, scheduling and monitoring
•Inter-disciplinary check/coordination involving piping, civil, mechanical, structural and E&I teams

Company industry:
Oil & Gas
Job role:
Engineering

ENGINEERING SPECIALIST

February 2015 - November 2015

BARRY WEHMILLER INTERNATIONAL

India

February 2015 - November 2015

Company industry:
IT Services
Job role:
Engineering

PROJECT LEADER

May 2008 - May 2011

WIPRO TECHNOLOGIES (ON DEPUTATION TO SIMON CARVES)

India

May 2008 - May 2011

Study input drawings/documents like plot plan, P&ID, equipment layouts, support schedules, project Manuals etc.
•Handle pipe routing, equipment modeling, support modeling, pipe rack routing etc.
•Review 3D model and extract required GA drawings, isometrics and BOM per project requirement

•PROJECT-2 : Low Density Polyethylene Plant(LDPE

Job role:
Information Technology

SENIOR DESIGN ENGINEER

September 2006 - September 2007

SANDVIK ASIA Ltd

United Arab Emirates

September 2006 - September 2007

PROJECT-1 : Prototype development of Rotary Drill

Company industry:
Industrial Production
Job role:
Engineering

DESIGN ENGINEER

November 2005 - June 2006

INGERSOLL RAND INTERNATIONAL INDIA LTD

United Arab Emirates

November 2005 - June 2006

PROJECT-1 : Product improvement in Hydraulic Excavators
•Location : Bangalore
•Client : Bobcat Excavators
Responsibilities:
•Design of hydraulic piping assemblies
•Creation of spool drawings for fabrication purpose

Company industry:
General Engineering Consultancy
Job role:
Engineering

ASSISTANT ENGINEER

August 2000 - November 2005

BHARAT EARTH MOVERS LTD Kolar Gold Fields

Bengaluru, India

August 2000 - November 2005

PROJECT-1 : Prototype Development of 160 ton Hydraulic Excavator
•Location : Kolar Gold Fields, Karnataka
•Client : Bharat Earth Movers Ltd
Responsibilities:
•Design of piping systems for travel and lifting attachments of equipment and follow-up in shop floor for timely fabrication
•Evaluate critical functional parameters of Excavator like bucket digging forces & arm crowding forces in response to tender requirement for specific configuration
•Release of engineering change notice & drawing release advice as part of design review and in response to requests from production department
•Deputed to shop floor regularly to oversee & expedite production during peak order schedules, coordinate with inspection teams

•PROJECT-2 : Process Improvement on 30 ton Hydraulic Excavator
•Location : Kolar Gold Fields, Karnataka
•Client : Bharat Earth Movers Ltd
Responsibilities:
•Design of piping systems for travel and lifting attachments of equipment and follow-up in shop floor for timely fabrication
•Calculate developed length of pipes used in various piping assemblies and consolidate BOQ for procurement purpose
•Prepare bill of materials of piping assemblies

•PROJECT-3 : Value Engineering on Heavy duty Bucket for Granite Mining application
•Location : Kolar Gold Fields, Karnataka
•Client : Bharat Earth Movers Ltd
Responsibilities:
•Introduce bolt-on type design of tooth Point, which eliminated problem of replacing entire Bucket in case of damages
•Introduce additional reinforcement gussets on buckets for improved strength
•Modeling & generation of component & assembly drawings, quality check as per checklist

Company industry:
Oil & Gas
Job role:
Administration

Education

XLRI, Jamshedpur

April 2012

April 2012

Master's degree, general management

India

GPA (percentage): 70%

GPA (percentage): 70%

Regional engineering collegeNIT

January 2000

January 2000

Bachelor's degree, mechanical engineering

United Arab Emirates

Skills

Piping
Expert
Piping
Expert
Materials
Expert
Materials
Expert
Stress Analysis
Expert
Stress Analysis
Expert
Design
Expert
Design
Expert
Engineering
Expert
Engineering
Expert
Caesar II
Expert
Caesar II
Expert
Cadworx
Expert
Cadworx
Expert
MS Office
Expert
MS Office
Expert
AUTOCAD
Expert
AUTOCAD
Expert
CAD
Expert
CAD
Expert

Languages

English

Expert

Tamil

Native Speaker

Hindi

Expert

Kannada

Intermediate

Hobbies and interests

Watching football, Following current affairs, Social media