Senior Solar O&M Engineer
Sharaf DG Energy LLC
Total years of experience :8 years, 10 Months
Projects:
1. 1.529MW rooftop Solar Power Plant at Retail Logistics DWC.
2. 827 KW Solar Power Plant at Dubai Holding Headquarters Um Seqeim, Dubai.
3. 508.8KW Solar Power Plant at Steinweg Sharaf JAFZA.
4. 217.8KW Solar Power Plant at Hadeed Trading JAFZA.
5. 2.544 MW Solar Power plant at Zabeel Park and Emirates Towers, Dubai
6. 500Villas DEWA project each 4.29KW in Dubai, UAE.
7. 100KW Solar Power Plant at Time Square Center Um Sqeim, Dubai
8. 40KW Dubai Space Station Solar Power Plant in Khawaneej, Dubai.
Projects:
1. 3.8MW Solar Power Plant at DFC(Dubai Festival City) mall, Dubai, UAE
(UAE’s largest rooftop solar Power Plant)
2. 250KW Solar Power Plant at Transworld in Jebel Ali, Dubai, UAE
3. 50KW solar Power Plant for Villa at Emirates Hills, Dubai UAE
Responsibilities:
1. Installation and Monitoring of On-Grid, Off-Grid Solar System.
2. Testing and Commissioning of On-Grid Solar power plants.
3. Preparation of Drawings and proposals.
4. Site Inspection.
5. Installation of Main Distribution Boards (MDB’s) and Sub Main Distribution Boards (SMDB’s).
Responsibilities:
1. To Prepare Solar System Proposals.
2. To lead the team of technicians to complete the project effectively.
3. Installation and Maintenance of Solar System.
4. Installation of Main Distribution Boards, (MDB’s), Sub Main Distribution Boards (SMDB’s), and Final Distribution Boards (FDB’s).
A) Monitoring of Grid Station
Monitoring of grid station yard and Equipment which is as follow:
1) Power Transformer 2) Lightening Arrestor
3) SF6 Breakers 4) CT and PT 5) Bus Bar
6) VCB Trollys 7) Capacitors 8) Grounding System
B) Controling and Monitoring of Power Transformers
1) Monitorng of power transformer from Control Pannel as well as physical monitorng.
2) Monitoring of Alarms like CB Mech Fail, SF6 Trip Lockout, Oil Pressure High, Excessive Tempersture, T/F Buchhloz, Cooling System Fail etc.
3) Monitoring of Relays like Diff Trip, Oil Temp trip, Buchhloz Trip, O/C and E/F Trip etc.
C) Important Tests Monitoring
Monitoring of Important test of Transformer and Circuit Breakers which are as follow:
1) T.T.R test 2) C.E.S Test 3) C & DF Test 4) Meggar Test 5) On Time Test 6) Tripping time test 7) Oil Test
Responsibilities:
1. Installation and Supervision of Solar System, Inverters and Batteries of the Telecom Sites.
2. Power Monitoring
3. Monitoring of Power Alarms at NOC.
Technical mill surveys for trouble-shooting.
Technical Surveys of Power Plant.
Familiarity with Invertors and Driver circuits of Machines.
I got the silver medal for the 2nd position.