مجموع سنوات الخبرة :29 years, 2 أشهر

Area Manager في Atkins
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ يناير 2015

Manage the Supervision Staff of the company and also, Clients Demands of the following projects:
1- Al Habtoor Polo Club & Resort - handed over 2018
2- Al Habtoor Residence Project - closing out process
3- Akoya by Damac - handed over 2018
4- Five Jumeirah Tower at JVC Dubai tower by SKAI - handed over 2019
5- Dubai South Mall by Emmar- closing out process
6- Villanova by DUbai Properties- ongoing
7- Remraam 3 clusters by Dubai Properties closing out process
8- Kifaf Phase 2 Residential Tower by Wasl- ongoing
9- Movenpick Hotel By AMI RAK- ongoing
10- Mangrove Hotel By Secure RAK- ongoing

Project Director في Atkins
  • الإمارات العربية المتحدة - أبو ظبي
  • نوفمبر 2013 إلى أغسطس 2014

World Trading Center-Project Close-out Stage

Project Director في Faithful+Gould
  • الإمارات العربية المتحدة - أبو ظبي
  • سبتمبر 2013 إلى أكتوبر 2013

Construction of the Fairmont Hotel & Serviced Apartment in Abu Dhabi located at Marina area with AED1.1 Billion project value.

Senior Projects Manager في Development Investment Projects Funds - www.dip.jo
  • الأردن - عمان
  • يونيو 2007 إلى يوليو 2008

Construction of prestigious significant resort at Dead sea provided with 13 private bungalows in addition of four types of swimming pools, children's park and four different types of restaurants; the Project value is USD42M, where I have established the management and engineering consulting core and manage day-to-day operational aspects of the project, including the entire scope of works.

Senior Project Manager في National Childrens Museum - www.farisandfaris.com
  • الأردن - عمان
  • أكتوبر 2004 إلى مايو 2007

The Project value was USD15M, and I was employed by The Office of Her Majesty Queen Rania Al-Abdullah, of Jordan to manage the entire construction of the National Children's Museum; the only brilliant museum for children's in the Middle East Region, where the project has been shortlisted of being best of five projects nominates of having Agha Ghan Award.

Owner في NCCB
  • العراق - بغداد
  • ديسمبر 2003 إلى سبتمبر 2004

Design/Build for NRCT Bunker ‘C’, including Concrete Pads, Re-install Concrete Barriers, Manufacture & Install Massive Gates. Works involved treatment of Nuclear Polluted Soil, the work was supervised by FlUOR DANIAL US Company.
The project value was USD250K

Site Manager في Contrack International
  • العراق - بغداد
  • سبتمبر 2003 إلى نوفمبر 2003

Design/Build for NRCT banker B including;Traffic, fencing, lighting, gates, security system and the motion detection with total value of USD980K and also, the work was supervised by FLUOR DANIAL U.S. Company

Chief Executive Director في European Tobbaco-Baku - www.eurotobacco.com
  • أذربيجان
  • أبريل 2001 إلى أبريل 2003

Task: Overall Management of European Tobacco-Baku, Azerbaijan

➢ I was appointed by the same group to be a head of the Management team to study and analyze execution process of tobacco plant in Serbia-Chachak; the project value was USD100M

Senior Project Manager في European Tobacco-baku- www.eurotobacco.com
  • أذربيجان
  • أغسطس 1999 إلى مارس 2001

The scope was to renovating, rehabilitating and launching almost 100, 000 s.q.m. with the sum of USD50M as total investment, and the extra-ordinary challenge was to having finished the first phase of the project with only 142 days, and to be opened formally for production on the 2nd of February 2000.

Commercial Manager في European Tobacco-Dubai
  • الإمارات العربية المتحدة - دبي
  • يونيو 1997 إلى يوليو 1999

Establish and over all management of European Tobacco - U.A.E.

Senior Projects Manager في Nael Al Attia Contracting Establishment - www.nace.jo
  • الأردن - عمان
  • أغسطس 1993 إلى مايو 1997

Renovation and Construction of Royal Palaces at three different Governorates; Amman, Aqaba and Al Rajif with total value of USD2.3M such as:
• Construction of Guest House in Aqaba;
• Full renovation of the Main House in Aqaba;
• Construction of the Recreation Hall including; indoor swimming pool, Jacuzzi and steam-room in Amman;
• Renovation works for the Main Houses in Amman and Alrajif.

Construction Manager في Ministry of Industry
  • العراق - بغداد
  • يوليو 1992 إلى يناير 1993

Construction of main roads culverts at Petrochemical Plant Project with total value of USD170K

Construction Manager في Ministry of Industry
  • العراق - بغداد
  • سبتمبر 1991 إلى يونيو 1992

Industrial Sites Restoration with total value of USD230K

Resident Site Engineer في Bechtel - www.bechtel.com
  • العراق - بغداد
  • يونيو 1989 إلى أغسطس 1990

The construction of Administration Complex at Petrochemical Plant Project (PC2) with total value of USD7M

Site Engineer في Crystal Decoration Bureau
  • العراق - بغداد
  • أغسطس 1985 إلى فبراير 1987

Construction of Mosque at Baghdad with total value of USD250K

الخلفية التعليمية

بكالوريوس, B.Sc. Degree in Building and Construction Engineering Sciences
  • في University of Technology
  • أغسطس 1985

I studied 4 years, design of concrete, engineering economic and planning, soil, roads, fluids, field surveying, mechanics, design of steel structures, materials strength, statistics, computer/Java, plumbing, laboratories and factories.

Specialties & Skills

Risk Management
Primavera
Civil Engineering
Construction Management
Microsoft Office
Primavera Software
Microsoft office software
Project Management Courses
Project Risk Management
Construction Management - Contracting
Consultant Services
Project Management - Development

اللغات

الانجليزية
متمرّس
العربية
اللغة الأم

العضويات

Jordanian Engineers Association
  • Civil Engineer
  • March 2003
Iraqis Engineers Union
  • Civil Engineer
  • June 1985

التدريب و الشهادات

Course Attendant Certificate (الشهادة)
تاريخ الدورة:
December 2012
صالحة لغاية:
December 2012
Excellant Grade Completion Certificate (الشهادة)
تاريخ الدورة:
July 2003
صالحة لغاية:
August 2003
Course Attendant Certificate (الشهادة)
تاريخ الدورة:
March 2007
صالحة لغاية:
March 2007
Course Attendant Certificate (الشهادة)
تاريخ الدورة:
March 2003
صالحة لغاية:
March 2003
Course Attendant Certificate (الشهادة)
تاريخ الدورة:
August 2003
صالحة لغاية:
August 2003

الهوايات

  • Basketball
    Previous professional player in Al Karkh Club - Baghdad