Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

Maged Rezkalla

Technical Manager (Acting Operation Manager)

Mace Group

Location:
Qatar - Doha
Education:
High school or equivalent, Electrical Power and Machines Engineering
Experience:
26 years, 8 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  26 Years, 8 Months   

July 2019 To Present

Technical Manager (Acting Operation Manager)

at Mace Group
Location : Qatar - Doha
Leadership and management of Hard services and soft services as per IFM-SLA and meet client satisfactions, monthly Audit, Reports, KPI, Payments, Lifecycle, Assets Managements.
• Overseeing and coordinating planning and reaction to 'Mechanical and electrical technical service' delivery for buildings, facilities and equipment across the client’s estate.
• Study, propose and apply Energy Saving which save up to QAR 1.5 million per year.
• Undertaking regular client meetings and team meetings (Technical, Soft services, and Security).
• Performance management of the FM service contractors for various hard services disciplines.
• Formulating develop and implement maintenance strategies (PPM and reactive).
• Developing and maintain technical/operational standards and quality assurance processes.
• Providing technical input into the development of the 'CAFM' system and 'FSI GO' mobility.
• Propose, prepare specs and related sketches for minor projects, including technical review, value engineering and inspect the execution of work till completion certificate.
March 2018 To Present

MEP Manger

at Design Management Group – DMG
Location : Qatar - Doha
Lead MEP teams (Seniors and Inspectors) to achieve the target performance and improve KPI index (Quality and Time)
Ensures that the MEP drawings are coordinated and in line with other discipline design drawings of the project prior proceeding with work to meet design and operator requirements as well.
Review bi-weekly Project Time Schedule (MEP activities) and Dashboard to ensure the construction activities within time frame and highlighting the critical activities and proper recovery plan if required
Review and approve all IPC and VO compared to Contract documents
Reviews and gives approvals for all electrical related submissions shop drawings, method statements, MEP coordination drawing, material approval and all related executed site work.
Coordinate all work for proper installation, HVAC systems, AHU’s, FCU’s, chillers, Chilled water pumps to meet project requirements and approved ACMV as per QCDD.
Ensure that BMS interface with all required system and recommended others if not mentioned in IFC specs for proper operation and avoiding lots of faults due to the unique project environment
May 2012 To March 2018

Sr. Elec. Engineer

at Arab Engineering Bureau – AEB
Location : Qatar - Doha
Reviews and gives approvals for all electrical related submissions shop drawings, MEP coordination drawing, material approval request, Method statement of installation, Testing and commissioning submittal, As-Built drawings and OEM manuals.
Verifies that materials, manufactured goods, machinery, equipment, etc. Supplied to the job site are in line with projects specification, local authorities requirements and granted approvals.
Directing Electrical Engineers/Inspectors team
Achieve the executed work to get authorities approval, Kahramaa substation, Transformer rooms and HV installation.
Coordinate all work for proper installation, HVAC systems, AHU’s, FCU’s, chillers, Chilled water pumps to meet project requirements and approved ACMV as per QCDD.
Service Tunnel installation supervision (Kahramaa substation, HV cables installation/trenches/tunnel ventilation and Jet Fans work.
Liaising with CS team, Client, PM, FM and contractors, when required
Review and recheck all maintenance process as a facility management after handling the project for one year warrantee.
October 2010 To May 2012

Sr. MEP Engineer

at Egyptian Consultant House (MZECH)
Location : Egypt - Cairo
Ensures that the MEP drawings are coordinated and in line with other discipline design drawings of the project prior proceeding with work and to highlight to the PM of any discrepancies for necessary actions.
Coordinate and review on time all electrical shop drawings, material submittals, WMS, RFI and close-out documents.
Reporting to PM included site progress, performance, LOGs and delay Directing MEP team to solve problems with alternative solutions at minimal cost /time impact.
Liaising with CS team, Client, PM and contractors, when required
October 2009 To October 2010

Electrical Manager

at Al-Shafar General Contracting - ASGC
Location : Egypt - Alexandria
Management and coordination the electrical work (executed by sub-contractors) for 254 Villas,
Prepare, Review shop drawings /coordination drawings and materials submittals prior to consultant approval
Preparing the RFI, technical issue, materials required, cost control, progress report and payments certificates
Reporting to the GM daily/weekly progress/technical/payment/VO
Prepare / Reviews all electrical related shop drawings, coordination drawings, material submittals and WMS prior consultant submission.
Verifies materials, manufactured goods, machinery, equipment, etc.
Supplied to the job site are in line with projects specification, local authorities’ requirements and granted approvals.
Directing Electrical Engineers/Inspectors team and assisting in solving site problems in alternative solutions.
Providing interpretations and clarifications to RFI’s upon client/contractor requested.
October 2006 To October 2009

Sr. Elec. Engineer

at Dimensions Engineering Consultant(DEC)
Location : United Arab Emirates - Dubai
Review Design drawings before tendering stage to avoid any conflict or uncoordinated to meet Authorities’ regulation, DEWA substation
review and approve the work shop drawings and materials submittals for various projects including the follow-up and supervision of the site works according to the design drawings, specifications, standards (BS, NFPA, EN, IEE….) and authorities’ regulations (DEWA, JAFZA, Etisalate, Du and Tecom) for Dubai Projects’ and EDD (for Bahrain Projects), As following:
Twin Towers (JAL Hotel “2B+G+55+4Mech”, MUT “B+G+45+3Mech” & 2No. Parking each 2B+10), Project Cost 750M Dhs.
KG Tower in Dubai Marine, (2B+G+19), 100M Dhs, Residential
Fortune Tower in JLT, (4B+G+34+Mech), 120M Dhs, Offices
New Dubai Gate Tower in JLT, (6B+G+39+DF), 180MDhs, Residential
Fortune Executive in JLT, (4B+G+34+Mech), 120M Dhs, Offices
134 Villa (Discovery Garden), Nakheel
Barsha Complex (2 Buildings “2B+G+12+HC+RF”)
Seasons Community in JV (4 plots)
Q.Sami Tower in Business Bay (4B+G+3P+28+HC)
Landmark City View in Bahrain (G+5P+16+HC+RF)
Reef Island, Bahrain (3 Buildings”2B+G+6+RF)
October 2005 To November 2006

Sr. Projects Eng.

at Tarsheed Consultant Office (NECE)
Location : Egypt - Cairo
Review, supervision and monitor site work of Port Ghalib District Cooling Plant (7200TOR), 160 Million LE cost (Kharafi National at Marsa Alam).
MEP Design review for Power Station of New AUC Project "Co-generation Power Station 8MVA".
Reports preparing for various factories which will modified or renovated with the cooperation of FEI sectors “Federation of Egyptian Industries” such as ECO “Environmental Compliance Office” and IMC “Industrial Modernization Center” based on surveying reports.
September 2002 To October 2005

MEP Maintenance Engineer

at Misr Invest. Co. Misr Bank Group
Location : Egypt - Cairo
Facility management and maintenance of the bank Tower.
Achieve the bank requirements, improvement and developments, as this Tower consider the Heart of Misr Bank and Routers News Agent.
Supervision and follow-up for preventive maintenance achieved by the responsible companies Agents, like Generators "4Nos. Cummins - 720Kva", Chillers "3Nos. Carrier X500 TOR", 14Nos. Of Express Elevators (UK), Central UPS System "4*120Kva" and FA System.
Responsible and follow-up for the renovation of old systems (i.e. FA system, Busbars, Panels, ...etc.)
Replacing of 3 busduct risers 1250A/IP42 by 1250A/IP56 for 25 floor
Replacing 18 no's. Of ACB/MCCB ranges from 1200A to 5000A
Creation of central alarms panel which collect most of systems for 30 floors tower, collecting from cooling tower water tank, chillers, pumps, lift stations, domestic water tanks, etc.
Install new P/A system in conference room in 24th Floor.
Maintenance of Systems by Banks technicians like domestic water/ hot water / chilled water /condenser water pumps, boilers, suction and extract fans, electrical doors, firefighting pumps and AHU’s.
August 1999 To September 2002

Acting Facility Manager.

at Sol Y Mar for Hotels& Resorts
Location : Egypt - Sharm el Sheikh
I was promoted from Maintenance Engineer to Acting Chief Engineer (Acting Facility Manager) for Various Hotels/resorts based on SolYMar.
Hotel/resort preventive maintenance as per annual plan, reporting to Area Chief Engineer
Finishing the 100 Rooms, 32 Chalets and Time-Share 45 Villas for Hotels Opening by the maintenance staff and outsourcing technicians.
Leading the maintenance staff for repairing the emergency cases of breakdown and achieving preventive maintenance schedules
Manag all required materials, spare parts, stock control in stores and tools for maintenance plan that's according hotels/resort budget.
Operate and maintain Hotel/resorts system and equipment like Gen-sets, Boilers, Chillers, Pumps, Fans Fire Alarm, Public Address, PABX, MATV, Swimming Pools Pumps, sewage station blowers, Water Booster Sys., SPA machines, Kitchen and Laundry Equipment.
Water treatment of swimming pool, hot water and chilled water sys.
Testing and commissioning of various Systems for soft-opining also the Grantee Certifications according contracts per each Contractor.
May 2001 To September 2002

Sr. Elec. Engineer

at ORASCOM Construction Industries "OCI"
Location : Egypt - Cairo
Responsible for electrical installation works, other discipline coordination, team supervision and monitoring to the MEP Manager.
Installation of the electrical work according to approved shop drawings with accommodate of Master Time Schedule of the project.
Installation of LV networks cables, trays, busbars, LV Boards, MV switch-gear, Transformers and ELV like, FA, PA, MATV and PABX.
Installation of Domestic Water Station, Boilers, Fire Fighting and Swimming Pool pumps rooms
June 1998 To August 1999

Elec. Engineer

at ORASCOM Projects& Tourism Developments
Location : Egypt - Hurghada
Finishing the 100 Rooms, 32 Chalets and Time-Share 45 Villas for Hotels
Opening by the maintenance staff and outsourcing technicians.
Leading the maintenance staff for repairing the emergency cases of
breakdown and achieving preventive maintenance schedules
Manage all required materials, spare parts, stock control in stores and
tools for maintenance plan that's according hotels/resort budget.
Operate and maintain Hotel/resorts system and equipments like Gensets,

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
May 1996

High school or equivalent, Electrical Power and Machines Engineering

at Cairo University
Location : Egypt - Cairo
Grade: 64 out of 100
Electrical Engineering

Specialties & Skills

MICROSOFT OFFICE

QUARK XPRESS

SUPERVISORY SKILLS

CUSTOMER RELATIONS

DIMENSIONS

DIRECTING

MACHINERY

Electrical Engineering

Technical Coordination

Problem Solving

Electrical Maintenance

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

Arabic

Expert

English

Expert

French

Expert

Loading
Loading...
Loading...