Maher Anis, Engineering Manager

Maher Anis

Engineering Manager

TBS the bakery shop

Location
Egypt - Cairo
Education
Bachelor's degree, Fine Arts
Experience
17 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 10 Months

Engineering Manager at TBS the bakery shop
  • Egypt - Cairo
  • My current job since January 2015

Responsible/Accountable for all the company brands from the engineering and new opening perspectives.
23 TBS (The Bakery Shop), 2 TBS Way, 12 TBS Franchised by TOTAL Egypt, 6 TFFL (The Four Fat Ladies), 10 Delicious Bakery (Inside supermarkets), 1 Coffee Berry (Imported Franchise).

-Developing/standardizing the shops’ layout due to operation circulation.
-Developing & Enhancing the criteria of the shops due the market needs and changes.
-Managing the Fit out for the franchising model at TOTAL Gas stations.
-Enhancing the CAPEX by localizing the essential elements like display counters.
-Managing and controlling the steps of establishing new branches:
a. Location determination & analysis.
b. Procurement & Tendering.
c. Construction Phase.
d. Handover & Start up by operation team.

-Start with corrective plans to make the branches more efficient for the operation to avoid any bad impacts on operation.
-Applying, managing and controlling preventive and corrective maintenance system through digital communication channel between branches and maintenance team.
-Creating, controlling, and monitoring the budget VS the actual expenses.
-Applying and monitoring AMCs for the sophisticated/critical elements by service providers.
-Zoning the branches due to geographic locations to have technician per zone, also make a rotation plan every three months to have a competitive atmosphere between technicians.

Head of Engineering Department at Arabiata Food & Restaurants Management
  • Egypt - Cairo
  • June 2013 to December 2014

-Developing & enhancing the kitchen layouts due to operation circulation/needs.
-Developing the criteria of the public areas in the restaurants due to the requirements of the local market, also the Middle East market to start the franchise model.
-Supervising/controlling the steps of establishing new branches inside and outside Egypt:
a. Architectural, M.E.P, Equipment packages.
b. Tendering.
c. Implementation process through a fit out contractor.

-Targets have been achieved:
Renovation/Opening of branches:
a. Arabiata - BUE University EL-Sherouk City Egypt, area about 130 m2, duration 35 Days.
b. Arabiata - Heliopolis Club Cairo Egypt, area about 70 m2, duration 28 Days.
c. Arabiata - KORBA Heliopolis Cairo Egypt, area about 250 m2, duration 90 Days.
d. Arabiata - Concord Mall New Cairo Egypt, area about 380 m2, duration 90 Days
e. Arabiata - DOKKI Giza Egypt, area about 200 m2, duration 60 Days.

Share on the initiation process for:
a. Arabiata - HAWALLI Kuwait, area about 250 m2,
b. Arabiata - MOHANDSEEN Giza Egypt, area about 420 m2,
c. Arabiata - CARGO Cairo Airport Egypt, area about 180 m2,
d. Arabiata - Asuit Egypt, area about 250 m2,

Senior Architect / Construction Department at Amer Group; Tropicana
  • Egypt
  • March 2009 to June 2013

Amer Group, Tropicana For Projects, Cairo, Egypt.
Company owns casual dining restaurants.
Senior Architect / Construction Department, March 2009 - June 2013, (4 years, 5 Months)

Responsibilities: 1. Implementing renovation works of the head office building of AMER group in 11 Cleopatra ST. Heliopolis.
2. Designing and implementation of MR.MANSOUR AMER (Chairman) meeting room in the same building.
3. Owner representative at restaurant division (Drawings study, doing the specs sheets for finishing works,
doing the bill of quantities, and following up & supervision on a fit out contractor)
4. Responsible for handling a new chain called SMOOTHIE KING, it is an American Concept for juices and smoothies.

Targets have been achieved: 1. New restaurants openings: a. Chili's Mall Naama Bay-Sharm EL-Sheikh, Egypt.
b. Chili's Mall of Arabia, 6 October City, Egypt.
c. Studio Masr Golf City Mall, Obour City, Egypt.
d. Studio Masr & Halaket EL-Samak, Giza City, Egypt.
e. Studio Masr & Halaket EL-Samak Gleem-Alexandria, Egypt.
f. Studio Masr Naama Bay-Sharm EL-Sheikh, Egypt.
g. Studio Masr Mall of Arabia, 6 October City, Egypt.
h. Studio Masr City Stars, Cairo, Egypt.
i. Halaket EL-Samak Jabal, Ain Sokhna, Egypt.
j. Carino's Zayed Dome, Sheikh Zayed, Egypt.

Site Engineer / Construction Department at Amer Group, Tropi 2
  • Egypt
  • October 2008 to March 2009

Amer Group, Tropi 2 For Projects, Ain Sokhna, Suez, Egypt.
Company owns Real State porjects.
Site Engineer / Construction Department, October 2008 - March 2009, (6 Months)

Targets have been achieved: 1. Responsible for implementing finishing works and handling with the contractor of the electromechanical works ( New style company) in 3 swimming pools of 5750 m2.
First of 2500 m2 mosaic tiles inside the pool containing a drawing of two
Dolphins and GRC topping for the pool. ( Beach type by using stamped concrete)
Second of 3000 m2 mosaic tiles inside the pool containing a drawing of geometrical shapes, GRC
topping for the pool, and two circular stairs using rough surface ceramic.
Third of 250 m2 kids' pool mosaic tiles and GRC topping for the pool.
Also responsible for finishing works of the mechanical rooms for these pools.

2. Responsible for implementing finishing works for the extension of Porto Sokhna mall containing Spa, two
towers of the bridge which connected to the beach passing by the road, and also handling between the marketing department for the shops and the owners.

Architect / Own Business at ARC for designing & contracting
  • Egypt
  • January 2008 to October 2008

ARC for Designing and Contracting, Cairo, Egypt.
Office owns candidates to provide engineering solutions.
Architect / Own Business, January 2008 - October 2008, (10 Months)

Targets have been achieved:
Design Sector

1. Design and preparing the interior drawings for a villa in Sherouk City.
2. Design and preparing the interior drawings for a villa in new Cairo.
3. Design and preparing the interior drawings for 2 flats in maadi.
4. Design and preparing the interior drawings for a flat in Dokki.
Contracting Sector

1. Responsible for implementing finishing and plumbing works for a motel on the desert road Cairo - Alex.
Containing of 3 floors, the Ground one is reception, restaurant, and lobbies, First and Second are 24 rooms
per floor.
2. Responsible for implementing finishing works included plumbing and electrical works for a flat in maadi about 120 m2 area.
3. Responsible for designing and implementing Wooden Islamic salons for a Lebanese business man.

consultant ofiice, 6 October city, Egypt at Primalinza
  • Egypt
  • October 2007 to January 2008

Primalinza consultant ofiice, 6 October city, Egypt.
Consultancy office providing engineering solutions for Banks.
Architect, October 2007 - January 2008, (4 Months)

Targets have been achieved: 1. Design and preparing the drawings of Piraeus Bank, and specially revision for the elevations drawings for all branches.
2. Follow up and supervising on the site work in 6 branches ( 4 in Alexandria, 1 in Tanta, 1 in Menia)
3. Make Evaluations to Piraeus Bank for lands, and buildings related to loans.
4. Re-design and Preparing the drawings of ESPAC store in 6 October city which converted to central
archiving for ISS (Integrated System Solutions company by Ahmed Kafafi)
5. Re-design and preparing the elevations drawings of the National bank for development to Abo dahbi
Islamic bank for 10 branches (2 in Menia, 2 in Mahala kobra, 1 in down town, 2 in Heliopolis, and 2 in
Asiut)
6. Revision of quantity survey and doing the funds for the contractors and doing the specs sheet.

Site Engineer at Amer Group, Tropi
  • Egypt
  • March 2007 to October 2007

Amer Group, Tropi 2 for projects, Ain Sokhna, Suez, Egypt.
Consultancy office providing engineering solutions for Banks.
Site Engineer, March 2007 - October 2007, (8 Months)

Targets have been achieved: 1. Responsible of supervising implementation finishing works in 2 sectors of the middle
tower (Khafra') contains of 11 units per floor in 15 floors (150 Unit)
2. Helper in: planning the finishing works in the Middle tower contains about (564 unit) of different designs,
handling with my colleges and the technical office of Cairo in preparing the shop drawings for the implementation, and handling with the owners of the units for amendment works if applicable or not.

Summer Trainee & Fresh Graduate Architect at Design & Build office
  • Egypt
  • June 2005 to September 2005

Builder Engineering Office, Maadi, Cairo, Egypt.
Design & Build office.
Summer Trainee & Fresh Graduate Architect, June 2005 - September 2005 (3 Months)
June 2006 - March 2007 (9 Months)
1. Design & Preparation of shop drawings for a villa of 2 floors.
2. Supervising implementation finishing of interior work of Samir Fahmy Group office building Maadi.
3. Supervising implementation renovation works of villa in Maadi.
4. Designing and implementation in a day use project in Dina Farms, country club house.


Develop Design Office, Maadi, Cario, Egypt.

Summer Trainee at Consultancy office
  • Egypt - Cairo
  • June 2004 to September 2004

Consultancy office.
Summer Trainee, June 2004 - September 2004, (3 Months)
1. Drafting Shop drawings.
2. Projects presentations.
3. Designing & presentation of a competition project.
4. Presentation & Marketing for a new branch for the company.

Education

Bachelor's degree, Fine Arts
  • at Helwan University
  • July 2006

B.S.C of Architecture Faculty of Fine Arts / Helwan University, 2006

Specialties & Skills

Tendering
Time Management
Fit out
Interior Design
ARCHITECTURAL
AUTO CAD
ENGINEERING DEPARTMENT
FINISHING
SHOP DRAWINGS
SOLUTIONS

Languages

Arabic
Expert
English
Expert

Training and Certifications

GTD (Get Things Done) (Training)
Training Institute:
branqeul
Date Attended:
January 2018
PMP 6th Edition (Training)
Training Institute:
American University in Cairo
Date Attended:
January 2019
Duration:
48 hours

Hobbies

  • fishing
    I'm doing this in matter if relaxing and passion.
  • listening music
    to be able to work, think, and any other thing in an excellent atmosphere.