MOHAMMAD KHATIBUR RAHMAN, Project Manager

MOHAMMAD KHATIBUR RAHMAN

Project Manager

Drake & Scull international PJSC

Location
United Arab Emirates
Education
Master's degree, Electrical
Experience
30 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :30 years, 10 Months

Project Manager at Drake & Scull international PJSC
  • United Arab Emirates - Dubai
  • My current job since July 2008

 Managing Project Finance such as billings & payments to maintain positive Project Cash Flow.
 Developing and maintaining Project installation schedule.
 Strong Liaison with Consultants, Suppliers, Clients and Project team .
 Produce detailed overall Staff / labor requirements for the project.
 Monitor Material Procurement activities for the project.
 Managing coordination of all MEP Installations with civil works.
 Ensure that the project quality system properly and efficiently satisfies the requirements of the Contract.
 Ensure that the client is properly billed and those payments are received in a timely manner for the project.
 Issuing the Variations according to the changes made by Consultant / Client.
 Assist and coordinate the selection of the key staff required to fill both Technical and Administrative posts.
 To manage projects within budget, set time schedules, authorities’ requirements and company’s procedures.
 Coordinates between Engineer and Consultant during construction phase.
 Reviews design systems, materials, construction methods, equipment, etc. to ensure quality.
 Analyse all project costs with a view of facilitating the completion of the projects at minimum cost and within budget limit.
 Monitors and directs, in collaboration with Project Management Team all site activities to ensure objectives are accomplished within the prescribed time frame and budget parameters.
 Prepares reports for corrective actions if project becomes behind schedule or overspends budget, and presents to General Management with recovery plan.
 Assess and reviews the project Key Performance Indicators to determine accurate status of project, making tactical decisions for allocating resources, and assigning staff requirements, to maintain project on target.
 Payment follow ups.
 Preparing final cost / close out reports upon handing over Projects.

Electrical Package Manager at Drake & Scull international PJSC
  • United Arab Emirates - Dubai
  • January 2007 to June 2008

entailed in the area of design, supervision and execution of electrical projects for buildings and industrial sectors.
 Collection of basic details and design of preliminary electrical distribution schemes for the complete plan for L.V. system
 Involved in Compressed Air system, Centralized Laboratory water system and Medical gas system.
 Coordinate with other system supplier such as AV system, Project Monitor and Digital signage system with lighting control & HVAC system.
 Based on the approved scheme, preparation of detail electrical layout / schematic diagram for low voltage distribution, power control cabling, interior / external lighting, lightning protection, earthing system.
 Involved in the installation of transformer, HT breaker and associated HV / LV cabling between substations to LV room for DEWA pocket substation.
 Design and preparation of shop drawing for lighting & power, F.A System, telephone block wiring, low current system such as P.A system, CCTV, MATV / SMATV, intercom system etc.
 Supervision, execution & maintenance for Fire Alarm system as well as Fire Suppression system.
 Conversant with computerized fire alarm system with graphic computer as command.

Senior Project Engineer at Drake & Scull international PJSC
  • United Arab Emirates - Dubai
  • November 2002 to December 2006

 Responsibility entailed in the area of design, supervision and execution of electrical projects for buildings and industrial sectors.
 Collection of basic details and design of preliminary electrical distribution schemes for the complete plan for L.V. system
 Involved in Compressed Air system, Centralized Laboratory water system and Medical gas system.
 Coordinate with other system supplier such as AV system, Project Monitor and Digital signage system with lighting control & HVAC system.
 Based on the approved scheme, preparation of detail electrical layout / schematic diagram for low voltage distribution, power control cabling, interior / external lighting, lightning protection, earthing system.
 Involved in the installation of transformer, HT breaker and associated HV / LV cabling between substations to LV room for DEWA pocket substation.
 Design and preparation of shop drawing for lighting & power, F.A System, telephone block wiring, low current system such as P.A system, CCTV, MATV / SMATV, intercom system etc.
 Supervision, execution & maintenance for Fire Alarm system as well as Fire Suppression system.
 Conversant with computerized fire alarm system with graphic computer as command.
 Design and preparation of central battery system for emergency lighting control as per civil defense requirements.
 Conversant with communicating & non communicating Control & BMS system of different manufacturer such as Staefa-control, Honey-Well, Tour & Anderson and Johnson & control etc.
 Instrumental in installation conducting, wiring and other related works for intelligent control system covering application such as lighting control, dimming control and HVAC control based on automated control devices such as timer, occupancy detector, low voltage programmable switches, infrared remote control, photo cell connected to light sensor.
 Coordinate with the system supplier such as Nurse Call system and Bed head light.
 Preparation of drawing schedule, material procurement schedule, progress report and other related works with the project for weekly/fortnightly submission for the smooth execution of work.
 Material planning and follow up for the procurement for the same including quality assurance and control.

Senior Electrical Engineer at Al Ittihad Electromechanical co.
  • United Arab Emirates - Dubai
  • September 1997 to November 2002

 Responsibility entailed in the area of design, supervision and execution of electrical projects for buildings and industrial sectors.
 Collection of basic details and design of preliminary electrical distribution schemes for the complete plan for L.V. system
 Based on the approved scheme, preparation of detail electrical layout / schematic diagram for low voltage distribution, power control cabling, interior / external lighting, lightning protection, earthing system.
 Involved in the installation of transformer, HT breaker and associated HV / LV cabling between substations to LV room for DEWA pocket substation.
 Design and preparation of shop drawing for lighting & power, F.A System, telephone block wiring, low current system such as P.A system, CCTV, MATV / SMATV, intercom system etc.
 Supervision, execution & maintenance for Fire Alarm system as well as Fire Suppression system.
 Conversant with computerized fire alarm system with graphic computer as command.
 Design and preparation of central battery system for emergency lighting control as per civil defense requirements.
 Conversant with communicating & non communicating Control & BMS system of different manufacturer such as Staefa-control, Honey-Well, Tour & Anderson etc.
 Instrumental in installation conducting, wiring and other related works for intelligent control system covering application such as lighting control, dimming control and HVAC control based on automated control devices such as timer, occupancy detector, low voltage programmable switches, infrared remote control, photo cell connected to light sensor.
 Preparation of drawing schedule, material procurement schedule, progress report and other related works with the project for weekly/fortnightly submission for the smooth execution of work.
 Material planning and follow up for the procurement for the same including quality assurance and control.

Electrical Engineer at Middle East and Gulf Dynamic Switch Gear Co Ltd
  • United Arab Emirates
  • February 1996 to August 1997

Estimation and design of LV-Custom build motor control centre, feeder pillar, lighting Panel and automatic control systems.
Supervision & execution of electrical works as per Drawings.
Conceptualized proposal for the preparation and submission of different system.
Co-ordination with production, planning and material management to execute the projects within stipulated time period.
Monitoring the projects execution in laison with various principle products and allied interest.
Follow up of projects with consultants and contractors.

Electrical Engineer at ACMEMfg. Pvt Ltd
  • India
  • July 1993 to January 1996

Design, supervision and execution of electrical works at site per the shop drawing
Installation, supervision and execution of LV-panels, Control Panels of EOT, HOT & Gantry Cranes, protective and control relays, cable laying, earthing system etc.
Project planning, preparation of shop drawing and approval of same consultant.
Mobilization of sub-contractor and manpower required for the execution.
Preparation of the measurement sheet and monthly running bill.
Preparation of job status report, work progress report, material status report for the smooth execution of work.
Evaluation of technical & commercial aspect of tender.

Education

Master's degree, Electrical
  • at Aligarh Muslim University
  • May 1993

Optimization Technique, Identification and control, Micro based computer system design, Process control. Digital instrumentation, Computer Engineering.

Bachelor's degree, Electrical
  • at Aligarh Muslim University
  • June 1988

Specialties & Skills

CABLEADO
CONSULTING
ENGINEERING
GRAPHIC DESIGN
LIGHTING
MECHANICAL
MICROSOFT WORKS
PROGRESS
PROJECT PLANNING
PROPOSAL WRITING

Languages

English
Expert
Hindi
Native Speaker
Urdu
Native Speaker
Arabic
Beginner