Responsibilities:
• Lead the design review team which consists of qualified engineers in different disciplines (Process, Structure, Mechanical, Electrical, & Instrumentation)
• Performing design review for many aspects of the current project (Structural, Arch., MEP, Roads, etc.)
• Leading design review meetings with Contractor.
• Negotiate with Contractor and make sure that project specifications were implemented.
• Act as Project Manager & Resident Engineer in their absence.
• Act as Commissioning Manager to check all commissioning RFIs
Subject taught
• Building Techniques
• Strength of Materials
• Technical Report Writing A/E
• Basics of Civil Engineering
• Fluid Mechanics
Design build Lusail Palaces
•Qatar National Museum / South Carpark, Kiosks and Landscaping Package
Responsibilities:
•Lead the design review team which consists of qualified engineers in different disciplines (Civil, Structural, Architectural, Mechanical, Electrical, Roads)
•Performing design review for many aspects of the projects (Structural, Arch., MEP, Roads, etc.)
•Attending design meetings.
•Make sure that project specifications were implemented.
•Follow up with design consultants to submit their design within the timeframe.
Project:
Sewage Treatment Plant (104, 500m3/day)/ Doha West, Public Works Authority, Cost $220Mn
Contractors Joint Venture (Suez & Marubeni)
Responsibilities:
• Lead the design review team which consists of qualified engineers in different disciplines (Process, Structure, Mechanical, Electrical, & Instrumentation)
• Performing design review for many aspects of the current project (Structural, Arch., MEP, Roads, etc.)
• Leading design review meetings with Contractor.
• Negotiate with Contractor and make sure that project specifications were implemented.
• Act as Project Manager & Resident Engineer in their absence.
• Act as Commissioning Manager to check all commissioning RFIs
Project:
Pre-stressed Concrete Girder Production Factory, State Company for Implementation of Transport Projects, Ministry of Transportation, Iraq, Cost $10Mn
Responsibilities:
• Prepare Construction Schedules using MS Project & Primavera.
• Prepare Tender Documents.
• Prepare Method Statements.
• Prepare Construction Quality Control (CQC) Plan.
• Prepare HSE Plans.
• Prepare design drawings (site layout, Arch., Structural, Sanitary, Mech., Electrical)
• Prepare shop drawings.
• Follow up with client requirement.
Projects:
1- AL-SADA & AL-GOBOR Water Treatment Plant (2000m3/hr) with 10km ductile transmission lines / Ministry of Municipalities & Public Works / Iraq, Cost $28Mn
2- AL-SALAM & AL-MASOURIYA Water Treatment Plant (4000m3/hr) with 65km ductile transmission lines / Ministry of Municipalities & Public Works / Iraq. Cost $60Mn
3- AL-MUFTIYA Water Treatment Plant (2x1000m3/hr) / State Company for Oil Projects (SCOP) / Ministry of Oil / Iraq, Cost $52Mn.
Duties for project at hand:
• Design review for all design drawings (Civil, Structural, Arch., Hydraulics, Mech. & Electrical)
• Prepare detail drawings (Civil & Arch.)
• Coordinate between clients, main designer, site offices (Structure, Civil, MEP and Arch) to ensure that all drawings are of the latest revision and smooth flow of ongoing activities.
• Prepare construction schedules for each project using MS Project and follow up its implementation.
• Follow up with the client & projects site regarding work execution & implementation.
Duties for projects in submission stage:
• Prepare preliminary design of the project.
• Prepare pre-tender estimate as required during tender process.
• Preparing Tender Document & Request for Proposal (technical and commercial).
• Preparing Contract Documents.
• Preparing Technical Documents.
• Prepare construction schedule for the project.
Construction of Five Star Hotel in Baghdad (B+G+9) / Iraq, total buildup area 35, 000m2, / Summit Hotels Ltd. / BVI. Cost: $110Mn.
•Base Security Upgrade - LSA TALLIL, Southern Iraq / United States Corps of Engineers. Cost $19Mn
•Construct Physical Standards Center -NAMAB - Iraq / United States Corps of Engineers. Cost $3Mn
•Design & Build C4ISR Bunkers Amman, Jordan, (3 underground Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance bunkers located on different sites in Jordan) Middle East Division - US Corps of Engineers. Cost: $21Mn.
•Construction of New Water Treatment Plant (150m3/hr), Construction of New Water Pipe Network (6km) and Rehabilitation of existing Water Treatment Plant in MUSSAIB Technical Institute (North BABIL, Iraq), Cost $1.25Mn
Responsibilities:
•Coordinate with clients and designer and site to smoothen the work flow.
•Guarantee time delivery with agreed quality and budgets.
•Prepare design & material submittals.
•Review MEP drawings and suggest solutions for the execution.
•Prepare price schedule and cash flow of the project.
•Follow up project implementation regarding all activities (construction, material supply, mechanical & electrical installations, HSE reports, etc.).
•Prepare progress reports, submittal schedules.
•Prepare contract documents.
•Prepare HSE Plans.
Rehabilitation of 47 sewage pumping stations.
•Rehabilitation of water treatment plant.
•Rehabilitation of buildings & Hospitals.
•Capacity building projects: Sewing training courses, sculpturing training courses, computer training courses, artistic painting workshop, etc.
Responsibilities:
All projects were managed using MS-Project & Data Base System & Excel Sheets:
•Assessment stage: Project scope & description, Site visit, Risk management plan, Identify limitations, Client requirements, Prepare preliminary schedule, Justification of the project, Project sustainability, Prepare bill of quantity, Market survey for pricing, Number of workers needed, Project budget, Project work plan, Prepare invitations to contractors, Prepare summary of contactors prices, Analyzing contracts including (request for approval, contracts, hand over site, additional work approval, request for payment, etc.)
•Implementation stage: Liaise with UNDP, Monitoring project activities (site visit & photos), Day-to-day follow up of the project to ensure that they meet timelines, preparing timely payment requests, prepare weekly & monthly reports.
NAHRAWAN pumping station: supply and install pumping station with concrete ground storage tank 500m3 with 6km PVC transmission line
•AL-UMMA Garage: Stone Facade for the garage
•Different small size supply projects mostly mechanical equipment.
•Design Water Treatment Plants.
•Design Water Tanks (Steel & Concrete).
•Design Multi-Storey Buildings.
•Supervision of rehabilitation of DAR ESELAM INVESTMENT BANK branches in Iraq.
•Assessment for Primary Healthcare Centers in Baghdad / Iraq, the assessment includes site survey, water and sewer pipes location, electrical feed line, soil investigation report, road condition.
•Design Hospital Sanitary & Medical Air Systems.
•Prepare Construction Schedules using MS Project.
Managing & supervising the lab.
•Supervise samples analysis.
•Ensure that all tests were carried out according to international standards (ASTM, BS)
•Preparing site investigation reports.
•Maintain time, training, calibration, QC and testing records.
•Train lab technicians and assistants on the correct use of lab equipment
•Assure quality system in the lab.
•Make sure their employees follow industry standards and safety regulations for handling and disposing of test samples.
•Comply and analyzes test information to determine operating efficiency of processes and equipment and to diagnose problems and malfunctions.
•Ensure laboratory practices meet or exceed company policy and industry standards.
Subjects taught:
•Project Management & Engineering Economy
•Fluid Mechanics
•Sanitary Engineering
•Ground Water Hydraulics
•Programming
•Auto CAD
•Numerical Analysis
•Supervising M. Sc. Thesis “Different Types of Water Conveyance System” (AL-FATIH University - Tripoli)
•Supervising graduation projects in Civil Engineering Department “Pipe Network Analysis”, “Fire Fighting Network Analysis”, “Rain Water Networks”, and “Water Conveyance System (110 km)”.
Designer and Supervisor
•Design 2 pipes in (RUJBAN and JADO) with pumping stations, for the benefit for the local municipality.
•EXTERNAL LECTURER
Company: Irrigation and Drainage Engineering Department, College of Engineering
Subjects taught for M. Sc. courses:
Ground Water Hydraulics.
Digital Solution of Engineering Problems.
Responsibilities:
• Analyzing and developing computer software program for project management. The program handles all company’s projects, easy to use input interface, many output reports including progress rate of each project, summary reports, cash payment and resource allocation (human, vehicle and material).
• Analyzing and developing computer software program for company’s vehicles including coding, plate No., chases No. engine No. etc. trace and check for replacement of tires and batteries.
• Consulting of other engineering software, human resource software, account software, store software, salaries software.
Prepare design drawings & follow up for:
•Water pipe networks.
•Sewerage networks.
•Steel and concrete water tanks.
•Building plumbing.
Concrete Buildings, Steel Buildings, Villas, Pipe line, Pumping Stations, etc.
Responsibilities:
•Follow up projects implementation regarding all activities (construction, material supply, mechanical & electrical installations, etc.).
•Site Supervision.
First on my class