Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Thank you. Your report has been submitted and will be reviewed shortly.
Prashant Ingole, Commissioning Manager

Prashant Ingole

Commissioning Manager ·GS CME

United Arab Emirates

High school or equivalent, Chemical Engineering

Work experience

Total years of experience: 20 years, 9 months

Commissioning Manager

August 2022 - Present

GS CME

Abu Dhabi, United Arab Emirates

August 2022 - Present

 Team Lead for a group of Engineers and Operators for Abu Dhabi Closure Project Abu Dhabi.
 Abu Dhabi Refinery consist of CDU, NHT, DHT, CCR, SRU & LPG plants to be decommissioned/ Decontaminate safely

Company industry:
Oil & Gas
Job role:
Chemical Engineering

Senior Commissioning Specialist

November 2017 - September 2021

SPIE Oil & Gas (KNPC Kuwait)

November 2017 - September 2021

for a group of Engineers and Operators for Commissioning, Operations and Technical Services of Hydrogen Production Unit, Compression Unit & saturate Gas Plant under Clean Fuels Project of KNPC MAB refinery having a capacity 19016 Kg/ Hr. (206900 Nm3/Hr.) X 3 Trains, Licensor Haldor Topsoe
•Acting as a Company support to sort-out contractual clauses with EPC & PMC for disputed items and activities during project execution
•Guiding the team to carry out walk downs, pre-commissioning activities, inspections, dry-outs, catalyst loading, etc, in a systematic and safe way
•Preparing commissioning & start-up plans and micro planning activities related to CSU with respect to resource availability, support groups availability & alignment, manpower availability etc.,
•Trouble shoot and resolve technical issues encountered during project execution stages, commissioning & start-ups and operations to attain steady state operations.
•Developing documents that would help in CSU & Operations, like Operating Manual, SOP, CSU procedures, Mock Drill Scenario, Emergency Handling Cards, Checklists, Blind Lists, etc.
•Reviewing of technical project related documents and suggesting technical modifications as per requirement
•Suggesting modifications, related to deficiencies and lacunae in design, construction and that envisaged during commissioning and start-ups
•Liaising with EPC, PMC and Vendors as company representative to chalk and execute project related aspects to ensure a smooth and safe commissioning and subsequent operation
•Developing reports, presentations and plans for project related matters
•Tracking of project progress and analyzing delays
•Commissioned Hydrogen & all allied Plants safely & successfully.

Process Specialist - SPIE Oil and Gas Services for KNPC

Job role:
Engineering

Sr. Operator

February 2014 - October 2015

Sadara Chemical Company

Saudi Arabia

February 2014 - October 2015

Handled Ethane cracker project
•Participation in PSSR, Facility Audits, HAZOP, risk assessments, inherent safety, CFSD
•Preparation of Operations Manual, SOPs, checks list and Training Manual and give presentation to Operation team and trained them

Petrorabigh Refinery, Saudi Arabia Mar 07 - Dec 13

Operation Engineer (Shift Supervisor)
•Handled Vacuum Gas Oil Hydrotreater (Axen) (75Kg/cm2g, 380 Deg C) Diesel Hydrotreater (UOP), Hydrogen Plant, Merox (LPG, Naphtha sweetening), Amine Treating Unit (ATU), High Pressure Amine Absorber, Low Pressure Amine Absorber, Stripper, Naphtha Stabilizer and Fractionator.
Key Deliverables
Roles and Responsibilities
•As a part of optimization study, prepare technical reports and recommend with or without debottlenecking optimum process condition to get maximum utilization of resources.
•Performing process studies and implements the recommendations to improve plant configurations, reduce operating cost, plant flexibility, product yield, equipment reliability and quality standard.
•Preparation of budget scheduled, system identified & marked up and test pack for precommissioning and commissioning
•Highlighting deviations and recommending corrective actions
•Analysis of failures & making recommendations to avoid the recurrence
•Ensuring all modifications via change management procedure are implement with HAZOP compliance and PSSR
•Predictive, Preventive and Planned Maintenance procedures including Condition Monitoring and Plant Health Services
•Interact with Quality Assurance for quality issues; strictly ensure compliance with Company’s ISO Quality procedures

Company industry:
Petrochemicals & Refined Petroleum Products Manufacture
Job role:
Management

Senior Engineer

April 2006 - March 2007

Nirma Ltd

India

April 2006 - March 2007

Process

Highlights
•Instructed Panel Engineers, Field Engineers as well as Field Operators on specific operations.
•Functioned as Chief Emergency Controller in case of emergencies.
•Handled the entire process entailing Hydrogenation, Kerosene Hydrotreating, Dehydrogenation, Adsorption (Molex, PEP), Reforming and Hydrogen Plant

Company industry:
Petrochemicals & Refined Petroleum Products Manufacture
Job role:
Engineering

Senior Engineer

August 2001 - March 2006

Finolex Industries Ltd

India

August 2001 - March 2006

Instrumental in commissioning start up of SPVC plant.
•Successfully handled the commissioning of Reactors, Distillation Column, Dryer, Compressors, Blowers as well as all types of Pumps.
•Accomplished streamlining of new plant along with it’s optimization in record time.
•Distinction of receiving appreciation & award for safe and successful commissioning of plant by the Chairman

Company industry:
Petrochemicals & Refined Petroleum Products Manufacture
Job role:
Engineering

Shift Engineer

July 1997 - July 2001

Garware Chemicals Ltd

India

July 1997 - July 2001

Instrumental in commissioning and starting up of DMT plant.
•Successfully handled different operations such as Oxidation reaction (Highly exothermic), High pressure Esterification reaction (29 Kg/Cm2, 260°C), vacuum distillation and crystallization.
•Induced several modifications for attaining savings in cost

Company industry:
Industrial Production
Job role:
Engineering

Trainee Chemical Engineer

February 1996 - June 1997

Chemox Chemical Industries Ltd

India

February 1996 - June 1997

Other Highlights
•Successful in achieving cost savings achieve by proper operation of fire heater.

Company industry:
Construction & Building
Job role:
Chemical Engineering

Education

PMP

May 2022

May 2022

High school or equivalent, Chemical Engineering

India

courses: •NEBOSH International Technical Certificate in Oil and Gas Operational Safety. •IOSH Managing Safely

College of Engineering & Technology

January 1995

January 1995

Bachelor's degree, Chemical Technology

India

. (

Shri Datta Meghe Polytechnic

January 1992

January 1992

Bachelor's degree, Chemical Engineering

India

in

Skills

production supervisor on chemical industrys

Expert

Operation

Expert

Refineries

Expert

Petrochemical

Expert

C

Expert

OPTIMIZATION

Expert

BUDGETING

Expert

CSU

Expert

FAT

Expert

HUMAN RESOURCES

Expert

IDS

Expert

LOGIC

Expert

MECHANICAL

Expert

OIL PAINTING

Expert

production supervisor on chemical industrys

Expert

Operation

Expert

Refineries

Expert

Petrochemical

Expert

Languages

English

Expert