Putla Dayasagar, Manager

Putla Dayasagar

Manager

Otis

Location
India - Hyderabad
Education
High school or equivalent,
Experience
26 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :26 years, 1 Months

Manager at Otis
  • United Arab Emirates
  • My current job since April 2017

Team size: 25
Domain: Engineering

Project Manager at UNITED TECHNOLOGIES CORPORATION
  • United Arab Emirates
  • My current job since January 2005
Specialist at OTIS
  • United Arab Emirates
  • June 2006 to June 2018

Jobsite details:
This site is 55 floor high rise building with Single observation desk having elevators
with speed of 5m/s. Having 18 elevator units.
Problems: Resolved all the below issues at jobsite
• Unable to update or send ELD screen messages
• New messages in ELD display which is available in Car does not new messages
• Unable to delete existing tenant information
• ICSS Software not compatible with elevator management software
Client Name:

Mgr at PBCom Bank
  • Philippines
  • May 2001 to May 2017

Jobsite details:
This site is 123 floor high rise building with double deck observation decks and
Single observation desk having elevators with speed of 10m/s, having a Glass floor
on 121st floor. Having 17 elevator groups and 4 escalator groups.
Problems: Resolved all the below issues at jobsite
• Unable to register calls in Double Deck for 121st floor
• Rear opening in Real Time screen when actually Front door are answered
• Floor serviceability issues on Real time display and actual layout in building
• Double deck elevator not serving desired deck (lower & upper deck) calls
• Elevator Software not compatible with elevator controller software
Client

Specialist at EMS
  • United Arab Emirates
  • April 2014 to March 2014

Team size: 20
Domain: Engineering

Quality Lead at Empire Estate
  • February 2012 to March 2012

Team size: 16
Domain: Engineering
EMS (Elevator Management System) is client application installed at
customer end. This tool is embedded with hardware equipment used to monitor
the elevators which are operated at the customer site, the elevator
configurations such as increasing or decreasing the elevators can be performed
with the help of this tool. The existing tool supports upto 8 cars and the new
feature included upto 12 cars, other features like secured floor or secured car
access can be controlled; all elevators installed at the customer can be
monitored and controlled thru EMS.
Roles &
Responsibilities
1. Handle all stages from requirements to software release.
2. Configure Hardware setup with EMS software.
3. Configuring hardware boards with service tools.
4. Programming the EEPROMS and ICSS boards.
5. Assisting the development team in configuring the hardware/software setups.
6. Supporting EMS Users with the issues faced with EMS software/hardware.
7. Conduct Test readiness review.
8. Software/Hardware builds deployment.
9. Gathering software requirement for new enhancements.
10. Analyzing the software requirements specification.
11. Assist development team in Unit/Integration testing to meet the system test
build date.
12. Responsible for planning all test efforts.
13. Reviewing of test cases developed by test team members.
14. Responsible to complete system as per planned schedule.
15. Responsible for delivery of the software release at customer site.
16. Assist users to setup new configurations in EMS.
17. Responsible to analyze the issues/defects detected at customer
environment.
18. Responsible in finding the root causes analysis.
19. Responsible for understanding of processes and implementation of
processes for future growth.
20. Handling Team Management w.r.t to handling issues/queries on overall
project and process thru SDLC & STLC.
21. Handling risk mitigation throughout the project life cycle.

Quality Lead at OTIS
  • United Arab Emirates
  • June 2008 to January 2010

Team size: 10
Domain: Engineering
OtisPlan+ is web based elevator simulation system. This tool simulates the
traffic and provides best configuration of elevators for particular building.
This is multi-lingual web project globally used by

Quality Lead at EMS
  • United Arab Emirates
  • February 2010 to January 2010

Team size: 12
Domain: Engineering

Sr
  • March 2007 to May 2008

Quality Eng.
Team size: 6
Simulation Optimization is web based elevator simulation system. This
tool simulates the best solution within the given configuration of the
building with the respective group parameters.
Roles &
Responsibilities
1 Understand the software requirement specifications.
2 Responsible for writing test cases for software requirements.
3 Performed build acceptance testing.
4 Involved in finding root cause analysis.
5 Involved in test cases review.
6 Log defects in Test director while performing system testing.
7 Responsible for performing functional, regression testing.
8 Executing test cases in quality center.
9 Verifying the Testing process to see if any gaps are present and plan to
overcome the gaps.
10 Mapping the testing process to test activities done during testing phase.

Engineer at OTIS
  • United Arab Emirates
  • November 2005 to February 2007

OtisPlan+ is web based elevator simulation system. This tool simulates the
traffic and provides best configuration of elevators for particular building. This is
multi-lingual web project globally used by

Technician Trainee at Bharat Heavy Electricals Ltd
  • India
  • January 1998 to January 1999
Service Engineer
  • United Arab Emirates
  • January 1996 to January 1998
Property
  • to

Invention
Disclosures
8 Invention Disclosures submitted on Elevator domain
ONE Invention filed as “TRADE SECRET” (1
st
Trade Secret for the BU)
THREE Inventions filed as “PATENTS”
TWO Inventions are awaiting for “Final-Ranking” and
TWO Inventions marked as “Do Not File”
Software Process
Software Process
1. Created Organization common level testing process.
2. Experience in maintaining the processes and its documentation.
3. Leading the role for maintaining/improving development & testing process.
4. Good experience in finding the gaps in processes and mapping to the
standard process to fill up the gaps if any.

Specialist at EMS
  • United Arab Emirates
  • to

Participants:
Service, Sales &
Software, Dev teams
Factory details:
This site is 40 floor high rise building with super double desk elevator with speed of
5m/s. Having 3 elevator units.
Training conducted on topics:
• Elevator management system features usage training
• Configuring of elevators and escalators in elevator management system
• Setting up service on

Education

High school or equivalent,
  • January 2010

Technical Education & Schooling 2018 -

Master's degree, Electronics and Instrumentation
  • at ICFAIJNT University
  • January 2006

pursuing from

Bachelor's degree, Electronics and Instrumentation
  • at ICFAIJNT University
  • January 2006

pursuing from

High school or equivalent, Elec & Comm
  • at State Board of Technical
  • January 1998

-

Specialties & Skills

Client Care
Project Delivery
Root Cause Analysis
Technical Support
Project Management
. NETOS
AUTOMATION TOOLS
CONTROL
CUSTOMER RELATIONS
FEATURES
PC SOFTWARE