Preparation & submission of Client bill with material consumption statement mainly cement, steel, structural items, aggregate, boulder, etc.
Subcontractor work order, monthly R/A bill preparation & journal voucher creation in ERP system.
Rate analysis of different measurement works under B.O.Q. items for Subcontractors’ work done, monthly quantity reconciliation -P.R.W. work done vs. Client submitted.
Detail study of site drawings of different structures and quantity take off for reinforcement, formwork and concrete.
Preparation of monthly requirement statement of major construction materials i.e. cement, reinforcement, aggregate, admixture, structural steel, boulder, G.I. wire net, etc. & material reconciliation.
Preparation of D.P.R., M.P.R., Labour report, Organization chart, Cost budget, Subcontractors’ liability statement, monthly utilization statement of major plant & machineries including its effect on monthly sale value etc.
I’ve prepared Detail Costing Report of a financial year (profit & loss statement) and C.T.C. for B.O.Q. items.
Revised estimate & Supplementary Tender for different item of works including financial implication cum probable excess quantity statement for supplementary tender to the original tender for this project under client’s supervision.
Monthly quantity & sales planning vs. achievement report, Monthly statement of Staging and Shuttering materials.
Site supervision of -
✓ Prestressed R.C.C. bridge structure & its components (consisting of 8.65m dia. & 30.15m depth 21no’s well foundation, pier shaft, pier cap, box girder, in-situ deck slab)
✓ Earthen guide bund for river bank protection (including boulder sausage work at launching apron, C.C.block pitching at river side slope of bund, turfing at country side slope of bund, spreading & consolidating of R.B.M. at top of bund)
✓ 750 mm dia. & 25 m depth R.C.C. cast-in-situ bored Pile Foundation Bridge.
✓ Fabrication work of Steel Cutting edge for well foundation, steel shuttering board, M.S. liner, etc.
✓ Construction of Coal, Container & Multipurpose berth (almost 1 km long Jetty under Adani Hazira Port on the Arabian sea) - 1.2m dia. & 30 m depth R.C.C. cast-in-situ bored pile foundation, R.C.C. cast-in-situ primary and secondary beams, Precast & in-situ R.C.C. deck slab, Wearing course (screed concrete), Approach road (with pile foundation & in-situ deck slab), Precast fender block & staircase for tug berth, etc.
Detailed study of site drawings of different structures and quantity take off for reinforcement, formwork and concrete & prepare material requirement statement.
Rate analysis of subco. activities, preparation of work order, subcontractor billing and creation of journal voucher in ERP.
Familiar with Integrity & Dynamic Load test of Pile, soil test like plasticity index, liquidity index, hydrometer analysis, modified proctor, CBR, bearing capacity of soil, aggregate test like sieve analysis, water absorption, flakiness, elongation index, cement test like consistency test (initial & final setting time, etc.), soundness test, compressive strength test, bitumen test like penetration test, softening point test, specific gravity of bitumen, ductility, flash and fire point, Concrete mix design & preparation of report, Field Density Test with Calcium Carbide Method, Sand Replacement Method and Core
Cutting Method.