تنوير احمد نياذي, Senior Sub-Engineer

تنوير احمد نياذي

Senior Sub-Engineer

Pakistan Steel Mills Corp. Pvt. Ltd.

البلد
باكستان - كراتشي
التعليم
دبلوم, Electrical
الخبرات
42 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :42 years, 9 أشهر

Senior Sub-Engineer في Pakistan Steel Mills Corp. Pvt. Ltd.
  • باكستان - كراتشي
  • أشغل هذه الوظيفة منذ أكتوبر 1986

Ensuring the smooth and uninterrupted process.
Rectify any fault occurred during the operation of the plan in the minimal time.
Keep all the automation system, instruments and equipment well calibrated to ensure the best quality of the product and an uninterrupted operation.
Liaises with the sub-contractors in the installation / revamping of the plant.

CEO (Self-employed) في Project Management Training & Consultant
  • باكستان - كراتشي
  • أشغل هذه الوظيفة منذ سبتمبر 2017

Project Management, Primavera P6, Earned Value Measurement System (NASI/AEI EVMS 748) and Delay Analysis, face-to-face, classroom, corporate and In-house Trainings.
Supervision of civil projects, planning consultancy and marketing.

Sr. Planning Engineer في Actco General Contracting, Dubai
  • الإمارات العربية المتحدة - دبي
  • سبتمبر 2016 إلى يوليو 2017

Developed the construction master plan and the planning packed to submit for approval to the Client. That included with the baseline programme, programme filters (critical path, WBS dictionary, cost assumption, resources pool and procurement schedule etc.), Project Cash Flow, Resources Histogram and Logistics plan.
Weekly update presentation to the client at each weekly meeting.
Weekly, Bi-weekly and monthly tabular and graphical reports.
Lead and guide the planning team.

Sr. Planning Engineer في J&P (Joannou & Paraskevaides (Overseas) Ltd.
  • قطر - الدوحة
  • أغسطس 2015 إلى يوليو 2016

Incorporate the change orders, site instructions and variations.
Prepare the delay analysis for the EOT (Extension of Time) claim.
Liaises with the consultant and incorporate his and client’s comments and concerns in the revised programme in order to get the approval in minimal time.
Generate the new cash flow, resources histogram and procurement & logistic plans.
Brief the progress percentage & trend to the project manager and attend the weekly and monthly meetings.
Generate and prepare weekly and detailed monthly progress reports.
Supervise the planning team.

Sr. Planning Engineer في Bin Hafeez Gen. Contracting Co.
  • الإمارات العربية المتحدة - أبو ظبي
  • يوليو 2014 إلى أبريل 2015

Develop the project masterplan and its submittal package for approval.
Filter and revise the baseline programme tasks at each forecast of the local meteorological department whenever is necessary and communicate that with the execution team.
Revise and update bi-weekly the risk registers and submit to the project manager, client and all the stakeholders for necessary actions.
Lead and supervise the planning section.

Sr. Planning Engineer في Powerline Engineering Qatar
  • قطر - الدوحة
  • أكتوبر 2012 إلى مايو 2014

Revision of the baseline (construction masterplan) and delay analysis for the EOT (Extension of Time) Claim for the two towers (twice in the tenure).
Delay analysis for a private villa in Doha.
Prepare the mitigation plan and recovery plans.
Head of the planning department.

Sr. Planning Engineer في Grid Engineering (MEP Sub-contractor), Qatar
  • قطر - الدوحة
  • سبتمبر 2011 إلى فبراير 2012

Lead & guide the planning team
Revise and prepare separate schedules for four of the project building for micro monitoring and incorporate the updates in the master plan.
Updating the higher management, the project manager of the main contractor with the progress percentage and progress trends of the specific buildings and share the mitigation actions on daily basis.

Planning Engineer في Tiger Contracting Company
  • الإمارات العربية المتحدة - الشارقة
  • نوفمبر 2009 إلى يوليو 2011

Developing the project masterplans for both of the towers as two projects and get that approved from the consultant.
Generate the project cash flow and resources histogram (before the submission) and consult with the HR and faineance departments in order to synchronize the project cash flow and resource allocation with the management policy.
Analyze the delay in the construction of the Opel Tower for an Extension of Time Claim.
Develop a masterplan for 210 villas project in Abu Dhabi and its submission package.
Delivery of accurate and timely information, reports and analysis to all stakeholders to the sanctioned cost, schedule behavior and key performance indicators (KPI) and progress on weekly basis.

Sr. Electrical Engineer في GECO Electrical & Mechanical Sharjah UAE
  • الإمارات العربية المتحدة - الشارقة
  • مايو 2008 إلى نوفمبر 2009

Ensuring all the electrical scope has been incorporated in the MEP programme and in the masterplan accordingly.
Ensuring the electrical works are not hindered by the civil or other MEP works.
Coordination between the electrical and mechanical team and resolve the conflicts in the drawings.

Senior Engineer في Techdynamics Contracting Establishment
  • المملكة العربية السعودية - الجبيل
  • نوفمبر 2004 إلى يناير 2008

This was a small Establishment with two Saudi and one Indian partners. Regardless the job titles my role in the company was the general manager who was responsible for all say, a one-man-show.
Estimation, negotiations with the suppliers, procurement, planning and execution & Hiring for the projects etc.
Project supervision, monitoring and tracking.
Reporting to the clients and home management.
The major project undertaken during this period were mainly;
o Relocation of HV Cables
o Power expansion in industrial units.
o Installation of substations
o Heavy steel structure erection.
o Road maintenance.
o And numerous civil projects.

Field Engineer في Mohammad Obaid Al-Marri Trading & Contracting Establishment
  • المملكة العربية السعودية - الجبيل
  • أبريل 2003 إلى نوفمبر 2004

Ensuring that no underground utilities mentioned in the drawings are affecting the electrical installations (substations and new traffic signals etc.).
Notify to the client and resolve if there is any or a third part installation above the ground is hindering the execution of electrical scope.
Validation of electrical scope and ensure that all has been incorporated in the masterplan.
Prepare technical submittals of the equipment and material required for the client’s approval and float the inquiries to the suppliers.
Supervise the execution of electrical scope.

Manager Installation & Services في Tyco Pakistan Pvt. Ltd.
  • باكستان - كراتشي
  • يناير 2002 إلى فبراير 2003

Prepare the drawings for the installation. Logistic, supervision, commissioning and customer service.

Senior Sub-engineer في Pakistan Steel Mills Corp. Pvt. Ltd.
  • باكستان - كراتشي
  • أغسطس 1981 إلى أكتوبر 2000

Ensuring the smooth and uninterrupted process.
Rectify any fault occurred during the operation of the plan in the minimal time.
Keep all the automation system, instruments and equipment well calibrated to ensure the best quality of the product and an uninterrupted operation.
Liaises with the sub-contractors in the installation / revamping of the plant.

Instrument Foreman في TOCO - 5
  • عمان - مسقط
  • أبريل 1984 إلى مايو 1985

Supervise the installation works
Logistics and calibration of the equipment.

الخلفية التعليمية

دبلوم, Electrical
  • في Govt. College of Technology
  • مايو 1981

اللغات

العربية
مبتدئ
الانجليزية
متمرّس

العضويات

Project Management Institue (PMI)
  • Member
  • August 2013

التدريب و الشهادات

Project Planning Using Primavera P6 (تدريب)
معهد التدريب:
Zabeel Institute
تاريخ الدورة:
February 2009

الهوايات

  • Training and Coaching